Status of Cryogenics Facilities Design

Slides:



Advertisements
Similar presentations
1 Asian Region Mechanical Design ILC Mechanical & Electrical Review Masanobu Miyahara /KEK Atsushi Enomoto /KEK Masahito Huse /Nikken Sekkei 2012/3/21.
Advertisements

CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Cryogenic System for Superconducting Final Focus Magnets* at ATF-2
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
March 22,  Overview of Asian Civil Design  Previous Case Study  Feature of Beam Tunnel  Tunnel Typical Cross Section  Beam Tunnel.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
1 May 22, Y.Sugimoto Update of detector hall in mountain region.
Survey Meeting John Osborne, CERN 8 February 2016
Cryogenics Science Center/KEK (Nobuhiro KIMURA –16/Dec./2009 at ATF2 TB meeting ) 1 Cryogenic System for Superconducting Final Focus Magnets (SCFFM) at.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
ML Tunnel Design Change High Energy Accelerator Research Organization KEK- LC Project Office Masanobu Miyahara 5th Nov
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
1 Cryogenic System of Interaction Region (SiD, ILD, QD0, QF1, Crab Cavity) in the Japanese Mountain Site WebEx meeting : June 19 th, 2012 IPNS/Cryogenic.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Access Hall Study for Cryogenics High Energy Accelerator Research Organization KEK- LC Project Office Masanobu Miyahara 2 Nov
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
ILC Utility Design Study for Kitakami-site
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Experimental Hall in Mountain Regions
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Study and Development of Large Cryogenic Systems in China
SUPERB site status report for layout v12
Process Simulation for the LCLS-II Cryogenic Systems
CLIC Handling Engineering Update
CLIC Civil Engineering Update
Updated Design of Detector Hall
Introduction and Meeting Objectives
Detector Utility/Service Cavern
ILC Accelerator Update
IT-4189 Supply and installation of a cryogenic distribution system
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Innovative He cycle Francois Millet.
Americas KlyCluster Cost Analysis Overview
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Current Site Status at IP Preliminary survey of campus
Detector Service Cavern for ILC
Accelerator and Experiment Interface Session: LS2, LS3
Summary Some Issues of Future Consideration
Detector hall in mountain regions
Accelerator Module Test Facility
Change Request Panel report
Cryogenic cavern in Asian site
IHEP Cryomodule Status
ILC Experimental Hall Cryogenics An Overview
Overview of Day One – 29 Feb 2016
SuperB Integration Summary of previous integration sessions.
Presentation transcript:

Status of Cryogenics Facilities Design M. Miyahara (KEK) 7th December,2016 at Aiina Center, Morioka

Contents Design change for Cryogenics Facilities Underground Cavern Surface Facilities Outline of Construction Cost Impact Summary 2016/12/7 LCWS2016 at Morioka

Design Change of Underground Cavern Cryogenics Cavern Design Change of Underground Cavern Service gallery Beam tunnel TDR Design Energy Service Hall Electric & Mechanical Cryogenics Compressor To Access portal To Surface Entrance Hall Shield wall Alternative Design Access Hall Cavern (TDR) Compressors Cryogenics Hall Entrance Hall Beam Tunnel Cryogenics Electric & Mechanical Electric & Mechanical Cryogenics To the portal Entrance Hall 2016/12/7 LCWS2016 at Morioka LCWS2016 at Morioka

Cryogenics Cavern in the underground TDR Baseline Cavern area/Volume: TDR Scheme Cold Box Cavern Compressor Cavern Revised scheme TDR Modified Cavern area/Volume: 100,000 2016/12/7 LCWS2016 at Morioka

Compressor House on surface Surface Building Compressor House on surface Schematic Layout of Cryogenics Compressor Compressor House : Approx. 2,000㎡ L=49 m, w=42 m, H=15m (for 2 Cryo. units) Crane equipment: 20 t crane Crane effective area; 45m x 38m Ventilation facility Ventilation capacity : 120000 m3/hour 2016/12/7 LCWS2016 at Morioka

LHe Storage House on surface Surface Building LHe Storage House on surface Schematic Layout of Storage House He Storage House : Approx. 700㎡ L=23 m, w=15 m, H=8 m 2 buildings 23m 15m 15m 2016/12/7 LCWS2016 at Morioka

Cryogenics Plant area on surface Surface Yard Cryogenics Plant area on surface Site area: 14,000㎡ LN2 Tank yard 5m×5m Buffer Tank yard Lhe Storage House Compressor House Control room Compressor Cryo purifier Valve unit Oil separator Air compressor HV box 2,000㎡ 2016/12/7 LCWS2016 at Morioka

LHC Point 4 Site Jura Mountains LHC Point 4 Echenevex Main Site, France Jura Mountains LHC Point 4 Cooling Towers LHC Tunnel 2016/12/7 LCWS2016 at Morioka

LHC Point 4 Site & ILC Virtual site Main LINAC LHC Point 4 Echenevex Main Site, Approx level = 590m ASL Scale image in ILC site LHC Point 4 ILC Cryogenics Plant Surface Yard: Area = 14,000 ㎡ Point 4 LHC Tunnel: Point 2 Point 3 Point 5 Point 8 Point 7 Point 6 Point 1 Horizontal: 500m Vertical: 40m LHC Point Cooling Towers, Approx level = 550m ASL 2016/12/7 LCWS2016 at Morioka

Construction Cost Impact Comparison to TDR scheme Facilities Scale: Floor area TDR Scheme Revised Scheme Item Facility Quantity m2 Difference to TDR 1 Place 6 Places Underground Cavern Cold Box 1,120 5,600 Compressor 2,000 10,000 - - 600 Sub Total 3,120 15,600 -10,000 Surface Building Storage House 700 3,500 2700 13,500 Construction Cost Impact 100 % 93 % ▼7 % 2016/12/7 LCWS2016 at Morioka

Summary Facilities Design Reduction of underground cavern space (volume) Increase of Surface building space Eliminate the vibration issue by the compressor Cost & Schedule The total construction cost of the underground cavern and surface buildings are reduced slightly. Shortening the Construction period at underground 2016/12/7 LCWS2016 at Morioka

Appendix LHC Point 4 Site 2016/12/7 LCWS2016 at Morioka