Status of ELQA equipment and related software

Slides:



Advertisements
Similar presentations
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
Advertisements

New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
TE-MPE-TM 25/10/2012, ELQA team TP4 System – the main tool for ELQA Mateusz Bednarek, CERN, Geneva Jaromir Ludwin, IFJ-PAN, Krakow.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
D. Bozzini, AT/MEL/EM, Chamonix Workshop XIV, January Chamonix Workshop XIV Session 4 – Other Issues affecting Beam Commissioning 1 Electrical Quality.
TE-MPE LS1 review 02/06/2015, Mateusz Bednarek, TE/MPE-EE ELQA during LS1 – the “unexpected” activities New developments Exceptional NCs Other tests.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
TE/MPE/EE Short ‘Halfway’ Update ELQA – LS1 Activities MPE/The Electrical Engineering section Knud, on behalf of TE/MPE/EE – 20 September LSC Reminder:
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
LHC circuit modeling Meeting 2 March PSpice Electrical modeling of the various LHC circuits, as a tool to: Describe the ac behavior of magnets Better.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
MP3- MIC-C S1-2 A22R1- 19/08/2009 G.D’Angelo on behalf of Elqa team MP3 MIC-C test campaign in S1-2 Special guest: A22R1 (MB2413)  MIC-C in the ARC results.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
TE-CRG Activities D. Delikaris, TE-CRG.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
MPE Workshop for LS1 / 22 & 23 Nov  DFB Instrumentation Upgrade  Cabling Issues  R2E Consolidation  Current Lead Insulation Project  DFB Instrumentation.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
S A Griffiths CM42 June 2015 Electrical & Control.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Considerations from machine protection and the ELQA teams
Electrical insulation of magnet circuits in sector 7-8
ELQA Electrical Quality Assurance
Giorgio on behalf of ELQA team
LHC Hardware Commissionning
Giorgio on behalf of ELQA team
ELQA How to define test voltages
12 October 2009 RRB Plenary R.-D. Heuer
Coordination of Hardware Commissioning
Powering the LHC Magnets
MPE main activities planned for LS2
Recommissioning of sector 12 after a short warm-up during eYETS 2016/17 QBT, MP3 – May 2017 S. Le Naour.
Powering from short circuit tests up to nominal
Circuits description and requirements - Closed Session-
EN-ICE Technical Committee SM18 activities & projects
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
K. Foraz on behalf of OSS members
TEST PLANS for HL LHC IT STRING
Brief report of the hardware commissioning activities
Hardware Commissioning
Other arguments to train two sectors to 7 TeV
Shortening the long RQF/RQD busbar segments in points 1 and 5
ECR on pole order of the HL-LHC IT circuit and resulting implications
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Status of ELQA equipment and related software Reference document (EDMS 788197): Recall of ELQA tests and terminology Status of the hardware Status of the software Long shutdown activities: ELQA campaigns R2E & Collimators in P3

This document is being revised: To refine the cryogenic conditions for each tests To add new scenarios (ex. partial warm up of a sector) To revise voltage levels for HVQ To add MIC tests

ELQA standard tests during HWC Needs for diagnostic in case: During ORC, we find an open circuit at warm or open/resistive circuit at cold? During HVQ, we find a frank short/breakdown at warm at cold? During MIC, we found a broken voltage taps or a defective quench heater (open or too resistive) at warm, at cold?

Standard scenario See Mateusz presentation for details Metallic debris found in dipole’s diode pot after flushing! Is it the end of the story? See Mateusz presentation for details HV monitoring RB, RQD, RQF & Spools... We are studying the possibility to measure more circuits Should we need a special scenario before the long shutdown?

Hardware (1/3): Work is on stand-by: TP4 systems We have 4 such mobile systems designed to do all TP4, DOC and MIC tests Limitation: Max. 8 teams if 2 shifts a day! Critical: The Matrix box is “home made” (= black box) built by the Polish collaboration (3 PCBs inside), No spare parts! We should build 2 more TP4 in order to have: An improved version of this matrix box To have spare parts Easier logistics (transport = risk of damaging our racks) We are waiting for the renewal of the Polish collaboration agreement! Work is on stand-by:

Hardware (2/3): TP4 systems Rest is off the shelf equipment but is ageing: Keithley 2750/E (x9) HP power supply (x4) Kepco Amplifier (x4) We are buying 6 x “GP-102” Frequency Response Analyser from Powertek UK to replace our Solartron SI-1253 for TFM measurements => New possibilities.

Hardware (3/3) Laptops: The older ones will need to be replaced. HVQ « Long live crate » used for TP4, DOC, MIC, HVQN, PAQ and Monitoring (20 crates): Not a issue! Racks that were used during the assembly phase: AIV1, AIV2: 2 systems available: Too few? We could use our TP4 systems (would need new software) Hardware for diagnostic: Time Domain Reflectometer, Megger TDR2000/2 Digital Low Resistance Ohmmeter, Megger DLRO 10 2 NI-PXIs: Presently used for IRSM measurements on IPQs (Multipurpose) We want to buy 2 oscilloscopes

Software Migration to Win 7 should not be a problem Upgrade of all our applications to the latest version of LabVIEW (LabVIEW 2010) should not be a problem for TP4, DOC, MIC, CHVQ applications Older applications like AIV, PAQ, HVQN (more than 5 years old) needs to be rewritten The Matrix box in TP4 systems is strongly interdependent with all our applications A modification of the matrix box will imply re-witting all applications => Polish collaboration ELQA Oracle DB up to date (needs to be maintained) All data from previous campaigns are available from our web site Needs to develop new tools for data extraction

Activities during next long shutdown Rework of 13kA Splices : At places where TE/MSC will replace a magnet: We will need to redo AIV1, AIV2 and PAQ tests in close collaboration with TE/MSC group as during assembly phase. At places where only 13 kA inter-connexions will be redone (spools & Line N not touched): We need “only” to check the electrical insulation before closing the hydraulic connections (manchette). Full ELQA campaigns (at warm & at cold) before LHC restarts. R2E: Since this year, we are responsible for the current leads heating system: Relocation of 3 racks (UJ14, UJ16, UJ56) => Order of non standard cable (thermo-couple), re-commissioning the racks after relocation Collimators in P3: Displacement of DFBAE and DFBAF: All the equipment behind the current leads (transformers) including the PE crate will be moved to put a cryogenic extension link to the QRL => Cabling and re-commissioning

Thank you for your attention