European Detector R&D: AIDA

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

After ISS Where Do We Go From Here?. 21 August 2006P Dornan - After ISS2 Next - until the end of 2006  Produce the ISS Report - with the present team.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Costing Workshop Summary Chris Rogers, RAL, 30 Mar 2010 Establish a common framework for costing of neutrino facilities Compare Beta Beam, Super beam and.
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
SG Det IA 2007 oct29 Alain Blondel ECFA study groups BENE (in CARE) Int'l Scoping Study (ISS) Steering group (EU): A.Blondel (Geneva) P.Soler (Glasgow)
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin LAL/IN2P3/CNRS.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
21 August 2006P Dornan - After ISS1 Discussion  NuFact Talks Comments  Report 1 st Draft Oct – 60 Pages per WG Finalise before end of the year.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
European Strategy Session of Council The European Strategy – report to the RECFA meeting in Brussels Will cover the following selected topics:  ECFA and.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
Activities relevant to Neutrinos in the UK Alfons Weber Oxford/RAL Durham, 11-Mar-2011.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
1 Advanced European Infrastructures for Detectors at Accelerators Generalities on FP7 IA call Context of AIDA call AIDA Work Package description Schedule.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
O R&D programme to test detector concepts being developed for neutrino factory: wrong sign muon “Golden” signature R&D Programme MIND & TASD 15 m 100 m.
L. Serin LAL/IN2P3/CNRS March 26th AIDA-2 proposal Reminder of targeted call in H2020 (shown at Feb 17 th meeting) Organization Status of Trans.
S.Stapnes1 European Detector R&D and FP7 - background  Two CN (Construction of New Infrastructures – support for preparatory phase – including some detector.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
S.Stapnes1 European Detector R&D and FP7 - Outline  Background –New call for IAs (Integrated Activities) in November – it is in fact expected tomorrow.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
D EMO W IND 2 – Delivering Cost Reduction in Offshore Wind ERA-NET Briefing Event 1 December, 2015 Sally Fenton, DemoWind Co-ordinator For further information,
MICE Collaboration Meeting, , Frascati 1 Roumen Tsenov Department of Atomic Physics, University of Sofia from a group of researchers from.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin CNRS/IN2P3.
BENE MECC detector Pasquale Migliozzi INFN – Napoli.
FP7 – DEVDET Proposal EUVIF: the vertical integration facility Ingrid-Maria Gregor, DESY ILC Vertex Workshop ILC Vertex Workshop April 2008 Villa.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
DevDet Project Summary Francesco Forti, INFN and University, Pisa SuperB Detector R&D Workshop SLAC, February 14-16, 2008.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
S.Stapnes 1 European Detector R&D and FP7 - Outline Background –Some quick reminders DevDet submitted for Integrated Activity FP7 call –Overview –Some.
14.4. Readout systems for innovative calorimeters
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Accelerator R&D for Future Neutrino Projects
New EU FP7 I3 call Identifier: FP7-INFRASTRUCTURES
Alain Blondel. LAGUNA meeting CERN 3-5 March 2011
WP8 – Improvement and equipment of irradiation beam lines
Accelerator Research and Innovation for European Science and Society
Extended Steering Committee Meeting
Alain Blondel 11 October 2010 GDR NEU2012 summary
European Detector R&D and FP7 - Outline
The Way Forward ISS to IDS
Working for a detector project: A message from AIDA
Report on EUCARD WP6: MICE Transnational Access (TA)
EU Institution Board 1 representative of each participating institute
Accelerator R&D for Future Neutrino Projects
LHC Computing, RRB; H F Hoffmann
AIDA++ * Next Steps * Working Title for the AIDA-2020 Follow-up
Presentation transcript:

European Detector R&D: AIDA 4th Neutrino Factory International Design Study Meeting, Mumbai Joint with EUROnu Meeting 12 October 2009 Paul Soler

4th Neutrino Factory International Design Study Meeting Definition of AIDA DevDet: this was a failed FP7 Integrating Activity proposal for “Detector Development Infrastructures for Particle Physics Experiments” It included detector R&D for Super-LHC, Linear Collider, future accelerator-driven neutrino facilities and B-factories The aim was to develop test beam facilities for neutrino detector R&D. This proposal was not funded in first round AIDA: Advanced Infrastructure for Detectors at Accelerators New EU approach of targetted calls is recommending that DevDet be resubmitted to the EU in their Integrating Activity call of August 2009 (submission date 3 December 2009) – renamed as AIDA I am part of the small group of people putting together the proposal and coordinating the “Neutrino” activities We need to make sure that the neutrino community is well represented in this new call to be able to fund neutrino detector R&D in Europe. 4th Neutrino Factory International Design Study Meeting Mumbai, 12 October 2009

4th Neutrino Factory International Design Study Meeting AIDA aims AIMS AIDA: to fund common R&D projects for Super-LHC, Linear Collider, neutrino facilities and B-factories http://cern.ch/aida From the point of view of neutrino R&D, the proposal aims to fund a particle test beam at CERN (H8) and its associated instrumentation (ie MICE-EMR detector which has a configuration like Minerva in the Molpurgo magnet and a prototype MIND that can be used as spectrometer). The management team at the moment consists of: Laurent Serin (coordinator), Lucie Linssen, Steiner Stapnes, Mar Capeans Garrido, Tiels Behnke, Francesco Forti, Hans Taureg, Claire Shepherd-Themistocleous, Svetlomir Stavrev There are also National Representatives to coordinate individual country contributions (Ken Long is UK rep) Expect ~50 institutes represented from about 10-20 countries EU budget 10 MEuro max but project likely to be ~35 MEuro 4th Neutrino Factory International Design Study Meeting Mumbai, 12 October 2009

4th Neutrino Factory International Design Study Meeting AIDA structure 4th Neutrino Factory International Design Study Meeting Mumbai, 12 October 2009

4th Neutrino Factory International Design Study Meeting Neutrino activity within AIDA I propose the neutrino activity be included within WP8, inside task: 8.1. Test Beams at CERN and Frascati Inside this task we would upgrade the H8 beamline: Install a TASD prototype inside the Molpurgo magnet Do the MIND prototype 2x2x4 m3 (=10-3 of MIND) This will allow to test both electron and muon charge ID in the same test Apart from the equipment, detectors and electronics we would also need to provide a DAQ. Alain Blondel will speak in more detail about these plans on the Tuesday Detector R&D session. 4th Neutrino Factory International Design Study Meeting Mumbai, 12 October 2009

4th Neutrino Factory International Design Study Meeting Neutrino activity within AIDA Other possible neutrino interests: WP2: Software WP3: Electronics WP8: Improvement and equipment of beam & irradiation lines Could also contribute to “8.4 General beam lines and irradiation equipment task” installing particle ID in beamline or testing some of the NuFact beam line monitoring equipment, like the polarimeter, beam Cherenkov or beam current transformer. WP9 : this is where most of the detector R&D is carried out. Testing of gaseous detectors (ie RPCs), or pixel detectors or granular calorimeters (ie CALICE) are studied here. Would need to investigate if it is of interest. Once beamlines are built, can bid for Transnational access (travel money to go to CERN to use beams) 4th Neutrino Factory International Design Study Meeting Mumbai, 12 October 2009

4th Neutrino Factory International Design Study Meeting AIDA timescales Timeline: 26 October: define contents of WP, first draft of WP text and partners list with preliminary budget breakdown 9 November: Final list of partners, iteration on budget sharing and meeting with National Contacts 23 November: all text finalised by then Submission 3 December Timescale is tight and need to move now to make sure we are in it. I have already sent email with preliminary list of testbeam plans but would like these to be finalised by the end of Mumbai meeting and make more concrete proposal Testbeam activities at CERN will also benefit non-Europeans: synergy between Minerva and also with INO 4th Neutrino Factory International Design Study Meeting Mumbai, 12 October 2009