Status of MB Data Retrieval

Slides:



Advertisements
Similar presentations
Low x workshop Helsinki 2007 Joël Feltesse 1 Inclusive F 2 at low x and F L measurement at HERA Joël Feltesse Desy/Hamburg/Saclay On behalf of the H1 and.
Advertisements

Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
Review of tests of superconducting magnets in SM18 - Stephane Sanfilippo AT-MTM-AS Field Quality of MQ. Measured in SM18 Presented by: Stephane Sanfilippo.
Field Quality Working Group-14/12/04 - Stephane Sanfilippo AT-MTM-AS Field Quality measurements at cold. Standard program v.s extended tests. Presented.
FIDEL meeting 22/02/07 - Stephane Sanfilippo AT-MTM Status of data retrieval (SSS and S4 tested in SM18). Data retrieval : goals, agenda. Procedure of.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
Data on the Web Life Cycle Bernadette Farias Lóscio March, 2014.
Author CERN – Geneva – CH Jacques.Dutour 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland 1 / 16 MQW magnets:
E. Todesco FIELD MODEL AT 7 TEV N. Aquilina, E. Todesco CERN, Geneva, Switzerland On behalf of the FiDeL team CERN, 17 th June.
Field Description of the LHC FiDeL - Status and Plan Presented by L. Bottura based on contributions of many MARIC and LHCCWG
Geneva, 12/06/ Results of Magnetic Measurements on MQXC 02 L. Fiscarelli on behalf of TE/MSC/MM section
Laboratory Software ProCal Calibration Software ProCal Track Management Software ProSales Pricing & quoting Software.
Boston University Daniel TaylorNima Badizadegan R. Terry BlackPantelis Thomadis.
LSA/FiDeL1 Deliverables Commissioning:Commissioning: Transfer functions [MB, MQ, MQY, MQM, MQX etc…] DC components Decay prediction Snapback prediction.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
L. Fiscarelli O. Dunkel, J. Feuvrier, S. Izquierdo Bermudez, G. Willering International Review of the HL-LHC 11 T Dipole for DS collimation December 2014.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
7 th March 2008 Magnet Modelling N. Sammut On behalf of the FIDEL Working Group.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Tune: Decay at Injection and Snapback Michaela Schaumann In cooperation with: Mariusz Juchno, Matteo Solfaroli Camillocci, Jorg Wennigner.
Measurement of LHC Superconducting Dipole and Quadrupole Magnets in Ramp Rate Conditions G.Deferne, CERN Aknowledgements: M. Di Castro, S. Sanfilippo,
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
HL-LHC Meeting, November 2013D2 Status and Plans – G. Sabbi 1 D2 Conceptual Design Status and Next Steps G. Sabbi, X. Wang High Luminosity LHC Annual Meeting.
MQM and MQY harmonics in Fidel Walter Venturini Delsolaro FIDEL meeting, 28 April 2009.
Expected field quality in LHC magnets E. Todesco AT-MAS With contributions of S. Fartoukh, M. Giovannozzi, A. Lombardi, F. Schmidt (beam dynamics) N. Catalan-Lasheras,
17 th April 2007 Nicholas J. Sammut Decay Prediction and Minimisation During LHC Operation University of Malta Field Quality Working Group with several.
Dr. Kęstutis Adamonis, Dr. Romanas Zykus,
Software Application Overview
Lessons learnt from CERN experience
Wednesday
Filter drilling status
PARKING AUTOMATION SYSTEM
11T Magnet Test Plan Guram Chlachidze
Model magnet test results at FNAL
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Jorge Sánchez-Quesada BE-RF-FB
Validated magnetic data at cold
FiDeL: the model to predict the magnetic state of the LHC
Autotest – Calibrated Leak
Tool removed during cycle Fault #2
DS11 T Transfer function, integral field and coil length
Tune and Chromaticity: Decay and Snapback
Tune and Chromaticity Measurements during the 10 A/s Ramp(s)
Field model deliverables for sector test and commissioning: when and what? The implementation of an accurate magnetic model will be vital for efficient.
the MDP High Field Dipole Demonstrator
Pierre-Alexandre Thonet
PIC + TransNet.
LHC Beam Commissioning WG Meeting
Sunnytek sensor networks
Cycle-to-cycle reproducibility and magnet modeling.
Alignment of the first two magnet system modules of Wendelstein 7-X
University of California Los Angeles
LHC OPERATION AND SUPPORT
Student Introduction to CORE ELMS
Beam-Based Alignment Results
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
(Single Arm) Pair Production Cross Section at PrimEx Status Report
Improving Collimator Setup Efficiency
Online data analysis Franco J. Mangiarotti CERN – TE-MSC-TF
Friday 1st October : Van der Meer scans
Magnetic measurements at ambient temperature on the MQXFBP1
On reproducibility From several inputs of N. Sammut, S. Sanfilippo, W. Venturini Presented by L. Bottura LHCCWG
Presentation transcript:

Status of MB Data Retrieval FIDEL Meeting Nicholas J. Sammut With several contributions from L. Bottura, S. Sanfilippo, L. Deniau, D. Sernelius, C. Yao, A. Basu 22nd February 2007

Outline History Standard Magnetic Measurement problems Data Analysis Problems Examples of wrong measurement data Analysis Procedure Results 22nd February 2007 Status of MB Data Retrieval

Standard Magnetic Measurements Performed using Rotating coils in SM18 Machine cycle Loadline Decay - Hysteresis loop 22nd February 2007 Status of MB Data Retrieval

History 2002 to 2005 – Standard Magnetic Measurement Analysis using semi-automatic system (manual and excel macros); data analysis targeted at filling in ID Cards  Focus was mostly on measurements at injection and at nominal current, TF ramp-up, components (integrated and local). 2006 – For FIDEL, full cycle verification required to enable modelling. This prompted a re-iteration of all the analysis of MB data set. Hurdle - Previous problems encountered in manual data analysis were not logged. - Many magnet specific problems and different combinations of hardware/analysis problems to be taken into account - Some cycles were hard to identify - Limited time and resources Solution - To increase efficiency, full automatic MB data analysis system designed, tested and implemented. Includes a logging system and a quick viewer. Allows data analysis and retrieval in one-shot. 22nd February 2007 Status of MB Data Retrieval

Standard Magnetic Measurement Problems Mechanical Problems: broken shaft Electrical Problems: damaged ribbon cable, damaged connection Electronic Problems: amplifier drift, amplifier gain, over-range Measurement Set-up Error: wrong coil calibration factors Operation error: error in cycle settings, error in data entry 22nd February 2007 Status of MB Data Retrieval

Data Analysis Problems High deviation (larger than 6 units) of main field (at least one sector) compared to integrated – 80% Erroneous data from connection of sector of a shaft – 10% Erroneous data from inverted connection of sector – 5% Incomplete measurement – 5% Gain Shift in TF – 35% Problems with gain at 1500, 2000A – 30% Wrong Data entry by operator (temperature, magnet name) – 4% 22nd February 2007 Status of MB Data Retrieval

Shift in TF due to Gain Problem Example of Problems Shift in TF due to Gain Problem 22nd February 2007 Status of MB Data Retrieval

Incomplete cycle and erroneous points during measurement Example of Problems Incomplete cycle and erroneous points during measurement 22nd February 2007 Status of MB Data Retrieval

Analysis Procedure Identify correct cycle Extract Data Identify erroneous sectors (delete or correct) Fill in log file Identify wrong points during cycle (delete or correct) Extract data Fill in Log file Check all hysteresis cycles and compare to the whole population Final cross check correct cycle with semiautomatic results (still to be done) 22nd February 2007 Status of MB Data Retrieval

Depending on number of problems encountered Possibly: end of March Results Cleaned Data - Loadline: 417 apertures - Machine Cycle: 406 apertures Still to do: Machine Cycle final check and correction Apply shifts to the TF gains for currents lower than 5000A (35%) Identify correct coil configuration of 4 magnets Final cross check between old semi-automatic results and fully automatic results Ready end of Feb Depending on number of problems encountered Possibly: end of March 22nd February 2007 Status of MB Data Retrieval