WP6 Pilot Set-up, Model Calibration and Assessment Peter Rosengren, Ulf Wingstedt, Peter Kool
T6.2 Tertiary Buildings infrastructures installations M15-M34 Partners: CNet (4), CERTH-ITI (3), INDESIT (3), ALMENDE (2), HYPERTECH (3) Physical installation of the INERTIA platform in the pilot, basic system configuration and on-field testing software, supporting hardware, communication networks, interface with existing monitoring and control systems
T6.2 Tertiary Buildings infrastructures installations Deliverables D6.2.1 INERTIA prototype rollout on pilot infrastructures (M26, CNET) D6.2.2 INERTIA prototype rollout on pilot infrastructures (update, M34, CNET)
T6.2 Subtasks Installations and configurations @CERTH premises Sensors, actuators, DERs, devices Middleware Gateway and Local Hub Server Communications infrastructure Middleware configuration Data Portal for validation of flow of events
T6.2 Progress this period The task started at M15 (December 2013) Installation and configuration of an INERTIA server Remote access is enabled Installations and verification of OPC Client/Server software Procurement of sensors/actuators for initial pilot installations Developers’ Office Meeting Room
T6.2 Next steps Phase 1: February Phase 2: March Meeting @CERTH Gradual installation of Plugwise and EnOcean Devices and their connection with the LinkSmart Software Scope: Meeting Room and Developers’ Office Phase 2: March OPC Server integrated in LinkSmart with data extraction from the BMS Smart Dishwasher Integration Meeting @CERTH Evaluation of initial set-up, problem solving
T6.2 Next steps Phase 3: TBD Phase 4: TBD Adjustments and improvements Additional DER/sensor support Occupancy Sensors Phase 4: TBD Extension with additional rooms/spaces TECNALIA physical/virtual DER