WP6 Pilot Set-up, Model Calibration and Assessment

Slides:



Advertisements
Similar presentations
Smart Energy Efficient Middleware for Public Spaces FP NMP-ENV-ENERGY-ICT-EeBEeB.ICT – ICT for energy-efficient buildings and spaces of.
Advertisements

Development plan and quality plan for your Project
And how they are used. Hubs send data to all of the devices that are plugged into them. They have no ability to send packets to the correct ports. Cost~$35.
Copyright 1998 Intellution, Inc. All Rights Reserved OPC Alarms and Events Technical Overview TM OLE for Process Control and Factory Automation Al Chisholm.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Using Microsoft Network Access Protection to test Dr.Web anti-virus software The workstations successfully checked by NAP can be used in a corporate network.
EGEE is a project funded by the European Union under contract IST JRA4 Execution Plan and Brainstorming Javier Orellana JRA4 Coordinator EGEE.
1 OSGi remote management meeting SIRLAN platform overview.
Institut für Computertechnik ICT Institute of Computer Technology Remote Control and Reconfiguration of Laboratories for Education and Training Vienna.
SWIFT Middle East Regional Conference
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting February 11, 2004.
M4 Alpha Release August 9 th February 8th, 2006 M4 Alpha Release Modified Agenda Review M4 Objectives, General Concepts and Design Review M4 Development.
Integrating competence development at the individual-, group- and organizational level Luxembourg, February 6, 2006.
IoTs Capabilities. IoTs Capabilities What is IoTs? Control / Information Internet Devices.
STREP Research Project HOBNET (FP7- ICT , ) HOlistic Platform Design for Smart Buildings of the Future InterNET (
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
WP7 - Dissemination of Results & Exploitation
Webinar Session - IML Layer
Task T6.2 Tertiary Buildings infrastructures installations
Task T6.2 Tertiary Buildings infrastructures installations
Digital Campus: Foundation Projects
WP2 - INERTIA Distributed Multi-Agent Based Framework
WP3 INERTIA Local Control and Automation Hub
Jordan Population and Housing Census 2015
Task 4.2 Grid Coordination & DR Activation Module
User Profiling and Ambient UIs
WP3 Local Control and Automation Hub,
T1.3 Pilot Sites Survey and Audit,
WP4 - INERTIA Aggregators Monitoring, Management and Control Hub
WP3 INERTIA Local Control and Automation Hub
[WP1] T1.2 User and Business Requirements
[WP1] T1.2 User and Business Requirements
T1.3 Pilot Sites Survey and Audit, Peeter Kool CNet Svenska AB
WP3 INERTIA Local Control and Automation Hub
WP2 INERTIA Distributed Multi-Agent Based Framework
WP3 - INERTIA Local Control and Automation Hub
Project Management Status
WP3 - INERTIA Local Control and Automation Hub
Project Management Status
WP2 INERTIA Distributed Multi-Agent Based Framework
WP2 - INERTIA Distributed Multi-Agent Based Framework
Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
WP3 Local Control and Automation Hub,
Deploying ArcGIS at a Telecommunication Organization
Task 5.2 INERTIA Simulation Test Suite TECNALIA Joseba Jimeno
WP5 INERTIA Integration & Lab Testing
WP1 INERTIA Framework Requirements, Specifications and Architecture
The Obermeier Software SNMP OPC Server 3.0
Are we ready to move to the Operation Phase?
Enabling Interoperability for the Utility Enterprise
Recent topics in Smart City
December 6, 2017 ITU-T SG16 Liaison Officer to CITS Yushi Naito
The business view Operations Business processes Productivity
Hierarchical IOT Protocol
PLUG-N-HARVEST ID: H2020-EU
Open Automation Software
We secure the communication
GN2 JRA5 Roaming and Authorisation Jürgen Rauschenbach, DFN-Verein
About Project SMARTEL Project Results Partnership
Smart Grid in the Home Senior Project Proposal
SMART HOME Expectation IN STANDARDS
Smart Prepayment Solutions for PV/SSEG
Productive + Hybrid + Intelligent + Trusted
Task Manager & Profile Interface
MAPUTO PORT DEVELOPMENT COMPANY IT Projects Update Order to Cash - Completion of system development - User Training - Go Live (July 2018) - Post.
Organisation av Integrations- & Informationsarbete
An Evolutionary Journey with MQTT Streamline Control Solutions
Presentation transcript:

WP6 Pilot Set-up, Model Calibration and Assessment Peter Rosengren, Ulf Wingstedt, Peter Kool

T6.2 Tertiary Buildings infrastructures installations M15-M34 Partners: CNet (4), CERTH-ITI (3), INDESIT (3), ALMENDE (2), HYPERTECH (3) Physical installation of the INERTIA platform in the pilot, basic system configuration and on-field testing software, supporting hardware, communication networks, interface with existing monitoring and control systems

T6.2 Tertiary Buildings infrastructures installations Deliverables D6.2.1 INERTIA prototype rollout on pilot infrastructures (M26, CNET) D6.2.2 INERTIA prototype rollout on pilot infrastructures (update, M34, CNET)

T6.2 Subtasks Installations and configurations @CERTH premises Sensors, actuators, DERs, devices Middleware Gateway and Local Hub Server Communications infrastructure Middleware configuration Data Portal for validation of flow of events

T6.2 Progress this period The task started at M15 (December 2013) Installation and configuration of an INERTIA server Remote access is enabled Installations and verification of OPC Client/Server software Procurement of sensors/actuators for initial pilot installations Developers’ Office Meeting Room

T6.2 Next steps Phase 1: February Phase 2: March Meeting @CERTH Gradual installation of Plugwise and EnOcean Devices and their connection with the LinkSmart Software Scope: Meeting Room and Developers’ Office Phase 2: March OPC Server integrated in LinkSmart with data extraction from the BMS Smart Dishwasher Integration Meeting @CERTH Evaluation of initial set-up, problem solving

T6.2 Next steps Phase 3: TBD Phase 4: TBD Adjustments and improvements Additional DER/sensor support Occupancy Sensors Phase 4: TBD Extension with additional rooms/spaces TECNALIA physical/virtual DER