Electricity projects in the developing CDM portfolio

Slides:



Advertisements
Similar presentations
Carbon credits - origination to commercialisation© 2006 EcoSecurities Group plc Undertaking CDM Projects in Africa – Challenges, Trends and Opportunities.
Advertisements

Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Results Based Financing : Private Sector experiences in Latam GDF SUEZ ENERGY LATIN AMERICA Philipp Hauser – VP Carbon Markets
2014 RENEWABLES 2014 GLOBAL STATUS REPORT CLEAN ENERGY WEEK 2014 CHRISTINE LINS Executive Secretary Sydney, 21 st July 2014.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
Renewable Resources Development Report California Energy Commission Business Meeting November 19, 2003 Ann Peterson Project Manager Technology Systems.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Clean Energy Revolution: IRENA view HLG SE4ALL Vienna, 19 November 2011.
IPCC Synthesis Report Part IV Costs of mitigation measures Jayant Sathaye.
Environmental Sustainability in the Extractive Industry: The Case for Climate Change Mitigation Dr Uwem E. Ite.
The Future of CDM Promote energy saving and renewable energy in developing countries.
María Paz Cigarán National Environmental Council (CONAM) June 12, 2003 NATIONAL STRATEGY STUDY Clean Development Mechanism - NSS PERU.
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Nairobi Framework Enhancing Regional Distribution of CDM projects, especially in Africa UNFCCC/CDM media training workshop - Tuesday 6 December John Christensen.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Technical aspects of NAMAs: Options and methodologies for developing baselines for different categories of NAMAs* Neha Pahuja Associate.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
WIND ENERGY Is there a Latvian Master Plan? CHRISTIAN KJÆR Chief Executive Officer European Wind Energy Association SSE Riga, 4 December 2008 © EWEA/L.
Bruce Winn
Gewessler, Hörl, Wolkinger Course: Energy and Sustainable Development.
International Energy Markets Calvin Kent Ph.D. AAS Marshall University.
Overview and Introduction to Technology Transfer Report Final TETRIS Workshop Brussels Dirk Forrister Natsource Europe Ltd 30 November 2006 Some new thinking.
Portfolio Projects Presentation 3 for Sotik Tea Company Harrie Knoef th January
Dr. Sombat Teekasap The Chairman of Renewable Energy Industry Club The Federation of Thai Industries Website:
+ Michigan’s Ideal Energy Mix By: Reagan and Natalie.
Technology Transfer and Investment Risk in International Emissions Trading (TETRIS) Work Package 3: Permit Supply from the CDM (TETRIS Meeting, Amsterdam,
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
World Energy Outlook 2006 Scenarios for the World and the European Union Presentation to European Wind Energy Conference Milan, Italy, 7-10 May 2007.
Keeping the door open for a two-degree world (Climate, Renewables and Coal) Philippe Benoit Head of Environment and Energy Efficiency Division International.
The RPA Renewables Routemap RPA\Events\030520GlobePraseg 1 The RPA Renewables Routemap Philip Wolfe Jeremy Leggett David McDonald Renewable Power Association.
Carbon Revenue and MFIs: Making it Work Marco van der Linden Ramesh K. Gautam.
Where is the CDM’s future? Some critical observations and reform proposals Oxford, September 19 th 2005.
El Gallo Hydroelectricity Project PDD Analysis
World Energy Outlook 2015 Deputy Director General Petteri Kuuva WEC Finland, 23 Nov
Challenges and Opportunities for Addressing Global Climate Change February 2006.
TÜV SÜD Group Carbon Management Service Methodology and Project Development – Notions of a DOE Methodology and Project Development – Notions of a DOE PCF.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
OECD Annex I Expert Group CDM Portfolio update Jane Ellis (OECD) AIXG seminar, 21 March 2005.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Measuring and Increasing Profit
Clean Technology (PB386) Click to edit Master title style Numfon Eaktasang, Ph.D.
World Energy and Environmental Outlook to 2030
The vision of 100% renewable energy
Kenya’s INDC: Actions in the Energy Sector
CDM –Functional Overview
Betül Özer, Erdem Görgün, Selahattin İncecik
International Renewable Energy Agency
Prospects for renewable energy developments and role of natural gas
Buyers' and Seller's Perspectives on JI : The Fund Perspective
Australian Energy Scenarios Predicting Uncertainty
Q2/2017 Developments in European Solar Markets & Beyond
World Bank Business on Renewable Energy
RENEWABLE ENERGY POTENTIAL OF INDIA A REVIEW
Powering the grid in the face of increasing fleet electrification
Achieving California's Renewable Energy Goals
Energy Technology Policy Progress and Way Forward
Key Findings and Resource Strategy
CDM Methods and project design: Baselines
How is 100% Renewable Energy in Japan Possible by 2020?
Q&A sessions at UNFCCC SB26
APEC Energy Demand and Supply Outlook 6th Edition 2-1 Introduction and Business as Usual Cecilia Tam, Special Adviser May 2016, EWG 51 Canberra.
Olivier Marquette 19 September 2016
The UK climate change strategy – where is it going? Can it work?
An integrated assessment model: the global CLEWS
Discussions about the Role of Nuclear Power for Achieving the Paris Agreement in Japan Yutaka Nagata and Sumio Hamagata Socio-economic Research Center.
Carbon Finance at EBRD: IGOs’ perspectives
Sectoral Approaches, Trade and Competitiveness
FUNDAMENTALS OF 100%RES POWER SYSTEM
Presentation transcript:

Electricity projects in the developing CDM portfolio Jane Ellis, OECD 8 December 2004 Thanks

CDM portfolio: 201 proposed projects* 107 electricity projects with 3.5 GW “CDM” capacity Fuel switching Bureaucrat – so start with a caveat. This info based on detailed project data for 201 projects, i.e. where there is a PDD, or which investors signal interest in taking forward. Does not include “wish list” projects. Does also not include projects that are confidential. There are quite a few of these. However, it does include a large number of projects, and does show recent trends. So not a complete picture, but way more than the tip of the iceberg. After the caveat comes the good news. Elec gen the most popular project type. More than half. Corresponding to 3.5 GW. Two next largest slices are also energy-related: red = en eff/heating. And white = LFG (sometimes with elec gen, but classified elsewhere as main effect from CH4). Hydro the most popular project type. Then biomass (incl bagasse). 13 wind projects. Vary in size from 150 kW to 150 MW. 13 * For which detailed information is available.

CDM portfolio: expected credits News not so rosy for elec when you look at its importance in the portfolio. Just under a quarter – again mainly hydro/biomass. Total portfolio expects to generate 52 Mt CO2 eq/y. Equivalent to DK 1990 CO2 emissions. This pie chart highlights the huge scale of some non-elec projects. -- N2O “slice” is essentially one project. Very big (>10 million credits/year). This is more than all 96 hydro, biomass, wind, solar projects combined. -- F-gas “slice” is two projects. Also very big (> 1 million credits/year). -- Electricity projects (all fuels) very variable in size. Largest proposed wind project now 150 MW (Mexico). But some < 1MW. Also interesting to see what is NOT important in the portfolio – that is energy efficiency (red slice) and transport (orange). 52 Mt CO2-eq/y in 2008-2012

CDM market growing, but electricity projects losing market share... News from an electricity point of view is getting worse… Electricity has gone from dominating CDM market being less than a quarter. This has happened over the last 15 months. Even worse – absolute amount has hardly grown in 6m. Partly because some larger electricity projects (geothermal, hydro, wind) have been withdrawn, or are not progressing. This includes a proposed 200MW wind plant in Morocco. This will not help massive growth in renewables and energy efficiency…. And energy needs to be a big part of the solution too. So while lots of these non-electricity projects reduce GHG, and cheaply, they are often in areas that are not very replicable at a global level. So concentrating on these areas alone will not help us to achieve the significant GHG reductions that scientists tell us are needed. Will talk about the reasons for the declining importance of electricity projects later.

Methodology approval status Some electricity methods approved by EB: Grid-connected biomass (Oct 03, 6m) Hydro <60 MW, bagasse (Dec 03, 3-8m) Consolidated methodology (Sep 04) Replacement of single plant (Dec 04) Variable approval time Applicability initially limited - now quite broad Applicability of electricity AMs quite broad now...

Sticking points (i.e. why aren’t electricity projects more popular)? Renewable electricity projects still in many schemes’ “wish list” Some non-electricity projects are much larger scale (in terms of credits), lower investment and lower-cost ... and also lower CDM-risk: “additionality”, baseline, transaction costs … which leads to lower delays Project funding also an issue: CDM funds often to buy credits, not to finance projects Reasons for declining importance of elec projects Investment costs relatively high - cost of reductions relatively high. N2O less than 20 cents. Difficult for electricity to compete. carbon price relatively low, so a limited push for projects that reduce CO2 (compared to projects that reduce gases with a higher GWP). - lag-time for project development: brownfield projects where you add a burner to an existing factory is much quicker to get up and running. - scale of potential ERs - additionality: diff to put into practice - transaction costs. Very variable. But the higher estimates mean that a project would need to generate about 10 000 credits just to break even. (but some streamlining possible for small <15MW projects) - baseline - delays. Getting a method approved has been 3 months at best, often 6-9, sometimes longer. And then the project is after that.

Conclusions To date, CDM have helped plans for 3.7 GW in Africa, Asia, Latin America Proposed CDM projects expect to generate at least 52 Mt CO2-eq credits/year during 2008-2012 High potential (and political desirability) for electricity CDM projects Electricity projects a small and decreasing proportion of CDM portfolio (e.g. <3% of expected credits from wind) Delays, uncertainties, CDM-risks/costs all important barriers to date… but diminishing … but low C prices and low GWP reduces relative attractiveness of CO2-reducing projects Slow start, but there is increasing CDM and JI project development Proposed projects expect to mitigate 58 Mt CO2 eq in 2010. Equivalent to DK in 1990. High potential and desirability for elec CDM projects However, a small and decreasing proportion of CDM portfolio: <3% This is because delays, uncertainties, CDM risks/costs all important barriers to date. However, they’re diminishing. So far CDM/JI helped plans for 0.8 GW. So something, but not exactly a huge technology push so far. Hope that recent institutional developments reduce the time, cost and risks enough for more renewable elec projects to come forward.

Further information http://www.oecd.org/env/cc/ Taking stock of progress under the CDM http://www.oecd.org/dataoecd/58/58/32141417.pdf The CDM Portfolio: Update focusing on non-electricity projects http://www.oecd.org/dataoecd/25/32/34008610.pdf