1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
PARALLEL RESISTOR CIRCUIT. The equivalent parallel resistance is: The equivalent parallel resistance when I connect two resistors in a parallel circuit.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
AT-MEL-MI Hardware Commissioning Review, , Suitbert Ramberger 1 The Normal Conducting Magnets and their Circuits Suitbert Ramberger, AT-MEL-MI.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
S A Griffiths CM42 June 2015 Electrical & Control.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
MPP Result of the investigation in the orbit correctors faults.
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
MPE main activities planned for LS2
Powering from short circuit tests up to nominal
Summary of week 7 Hardware Commissioning:
TE-MSC activities in SPS during YETS
DAYS OF THE WEEK.
Sprint 5 Schedule (15 – 2 days)
Time management School of Rock.
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Electrical Glitch 06:02 Electrical glitch is seen on all circuits connected to the 18kV (RD1.LR1, RD1.LR5, RD34.LR3, RD34.LR7)
+ many slides from various colleagues (KH, Rudiger, Paul, …)
Schedules My Schedule Monday: 9:00-2:00 Work 3:00-6:00 Clean
Announcement Next Exam will be on the Thursday when we get back from break The EM Exam will be ALL free response Review materials are posted and you will.
Power January 12, 2016.
M. Zerlauth, I. Romera 0v1.
(1 test missing on RQD/F)
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Monday October 3, 2016 Warm-up- Using complete sentences, respond to the following: Describe two organelles that the plant and animal cell have in common.
WHS: AMERICAN LITERATURE & COMPOSITION A
4th Grade Daily Schedule 7:50 - 8:00 Arrive & Unpack
Days of the Week Monday Tuesday Wednesday Friday Thursday Saturday
Week of May 28-June 1 Memorial Day No School Test SOL 4.4 Plants Test
MATH 6+/6 : Monday, March 16 Objective: Agenda: HOMEWORK: Reminders:
ONLY 16 DAYS of SCHOOL LEFT!
Time 1.
Contact
7th Grade Math Warm-ups Week of September 19-23, 2016.
7th Grade Math Warm-ups Week of September 7-11, 2015.
Warm-ups Week of October 7-11, 2013.
Week of March 17-21, 2014 Warm-ups.
Week of February 3-7, 2014 Warm-ups.
Week of December 16-20, 2013 Warm-ups.
Warm-ups Week of September 9-13, 2013.
Week of March 24-28, 2014 Warm-ups.
Week of November 28 – December 2, 2016
7th Grade Math Warm-ups Week of December 5-9, 2016.
Week of February 10-14, 2014 Warm-ups.
7th Grade Math Warm-ups Week of February 13-17, 2017.
7th Grade Math Warm-ups Week of September 14-18, 2015.
Week of November 4-8, 2013 Warm-ups.
Week of March 31-April 4, 2014 Warm-ups.
Week of October 28- November 1, 2013
Week of January 30 – February 3, 2017
23.2 Applications of Circuits
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
Monday, January 29, Day 105 Wow! Do we have a lot of catching up to do!!! Please enter quietly, and fill in your agenda. When you are done with.
Monday, FEBRUARY 5, Day 110 Welcome back! I hope you had a great weekend! Please enter quietly, distribute job cards, and fill in your agenda.
Bell Work Each Friday, students will be given a bell work quiz consisting of one question from each day’s bell work that week. On the following slides.
WELCOME BACK! I hope you had a fantastic weekend!
Hardware Commissioning
29/01/19 Week commencing 4/3/19 11/3/18 18/12/19 25/12/19 1/04/19
KFA10 status 03/06/2019 Currently:
Presentation transcript:

Re-commissioning campaign P5 Warm Magnets re-commissioning and SCT Marco Zanetti

P5 WM Tests 1 Circuit (RD1.LR5), 6+6 magnets, PC on surface ElQA (Pierre T.): found anomalous low resistance (150 kW vs 4 MW expected) Water conductivity measured to be ok (P5L=0.1 mS/cm, P5R=0.5 mS/cm) Increased current to ground due to FMCM voltage dividers (see next slide) WIC-Magnets, WIC-PC (Pierre D.) successful PC tests (Hugues) Issue with 18kV cell (EMD213/5E) feeding the PC (the PC remained ON). Fixed on Wednesday morning Heat run ongoing, due to finish Friday morning

FMCM and ElQA (Markus/Hugues) Voltage taps at the beginning and at the end of the circuit are connected to a voltage divider feeding the FCMC Not an issue for the PC During ElQA of the circuits where the voltage taps are directly connected to the magnets, the taps have to be disconnected. 6 circuits of these kinds in the whole LHC: RD1.LR1, RD1.LR5, RBXWTV.L2, RBXWTV.R2, RMSD.LR6B1 and RMSD.LR6B2

Schedule w21 w22 w23 w24 w25 w26 w27 w28 w29 w30 P1 WM P2 TI2 P3 P4   w21 w22 w23 w24 w25 w26 w27 w28 w29 w30 P1 WM P2 TI2 P3 P4 SCT P5 P6 P7 P8

WM and Short Circuit Tests SCT for circuits in U43: WCC ready Heat run on Thursday 5 June (whole day) PIC: Bouchons on PC side for IPQ/D Need to discuss what to do for RB and RQD/F Safety: Balisage as for P6 (de)condamnation taken care by EPC and Gerard WM test in P4 (WIC and PC) from Monday to Wednesday week 22 TI2 WM tests in parallel with SCT in P4 filters installation ok?