Data Communications Implementation Team (DCIT) DCIT #34 Plenary DCL Trials Update 07/17/2014 Matt Maki KEWR, KMEM DCL Trials Lead Data Communications Implementation Team (DCIT)
DTAP Build 7.2 Status Update Build 7.2 Full Climb Via SID Compliance: Compliance with full 7110.113 CVS Changes CVS, CVS Except Maintain, Maintain ALT Selections Arrival/Departure Processing, FD Response to AOC MEM/EWR ATC conducting B7.2 ATC training (Harris training sheet) 7/14 Build 7.2.1 Installed at FAATC (PTR #193, 199, 200) Proposed Build 7.2 Schedule: June 25: B7.2 FAT at Thales June 26: Install/SAT at FAATC June 27 - July 24: Testing at FAATC July 24: MEM/EWR Install Decision Point July 28-30: Install/SAT at KMEM and KEWR (KEWR install starts on July 29)
KEWR DCL Trials Status Update UAL Update: Minimum B767 DCL ops completed (6/17-20) UAL POI formally approved full fleet daily B767, B757 KEWR DCL Ops Aug 1 start estimate (FAA DC PO request to move date up) 30-45 new daily B767/B757 DCL Ops expected Daily B777 Ops continue UPS, FDX Update: Continued Daily MD-11, B767 Ops International Participation Update: BAW Pilot Training materials sent to NY IFO (Approval Pending) BAW ready to resume DCL operations (B777/B787)
KEWR DCL Trials Status Update Planned Print/TV Media Day following SWAP season Continued outreach with ZNY TMU for implementing Route Structure rules: Agreement in place with ZNY on Field 6 marking (KEWR) Meeting scheduled at ZNY on July 24 July 3 SWAP Measureable DCL Benefits: - Expedited OFF
KMEM DCL Trials Update FDX Daily DCL Ops Ongoing: DTAP Processing 20-40 FDX DCL ops per push SWAP/Route Revision Benefits (FDX evaluation) Expanded use of UM79 - Runway Re-Balancing (FDX Tactical) Final KMEM HADDS, FDIO Test NCP Extensions Approved by NAS CCB (7/14): Each extended until Trials end (Jan, 2016) KEWR NCPs will be extended next April
Questions ? KUSA