From the ATLAS SCT endcap module production to the commisionning

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Construction of the ATLAS SCT Endcap Modules Steve Snow Manchester University On behalf of the ATLAS SCT Collaboration Context - ATLAS, Inner Detector,
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
H.-G. Moser, Max-Planck-Institut für Physik, Munich1 Beauty03, October 2003 The Status of the ATLAS Inner Detector Hans-Günther Moser for the ATLAS Collaboration.
LHC SPS PS. 46 m 22 m A Toroidal LHC ApparatuS - ATLAS As large as the CERN main bulding.
Didier Ferrère, Geneva University Como, October The Construction Status of the ATLAS Silicon Microstrip Tracker D. Ferrère on behalf of the SCT.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
ATLAS SCT module performance: beam test results José E. García.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Shulamit Moed Vertex 2004, Como, September 20041page EndCap Module Production of the ATLAS semiconductor tracker (SCT) ATLAS SCT layout and specifications.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
The ATLAS SemiConductor Tracker Abstract The ATLAS SemiConductor Tracker (SCT) is presented. About silicon micro-strip sensors with a total active.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Thomas Jefferson National Accelerator Facility Page 1 SVT – Review January Sensors for the Silicon Vertex Tracker Amrit Yegneswaran.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
October 05, 2005D. Ferrère, RD05 Florence1 From the ATLAS SCT endcap module production to the commisionning D. Ferrère, University of Geneva in behalf.
Endcap Module Status Agreed Responsibilities Overall Production UK Situation Global Schedule Issues General Production Issues.
The ATLAS Inner Detector Steve McMahon / RAL. Welcome to CERN Geneva Airport LHC accelerator CERN main site SPS accelerator CERN 2nd site It is your laboratory.
The ATLAS Silicon Microstrip Tracker
LHCb VErtex LOcator & Displaced Vertex Trigger
Michał Dwużnik, for the SCT collaboration
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
The ATLAS Silicon Microstrip Tracker introduction system design sensors module design electronics hybrids construction integration Zdenek Dolezal, Charles.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Vertex ‘99, 6/21-25/1999 p. 1 CDF Run II SiliconAlan Sill, Texas Tech University CDF Run II Silicon Tracking Projects 8th INTERNATIONAL WORKSHOP ON VERTEX.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
Performance and operation of the ATLAS Semi Conductor Tracker (SCT) Paul Dervan The University of Liverpool, UK on behalf of the ATLAS SCT Collaboration.
Developing Radiation Hard Silicon for the Vertex Locator
New Mask and vendor for 3D detectors
Detector building Notes of our discussion
FCAL R&D towards a prototype of very compact calorimeter
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Simulated vertex precision
Constructional requirements from ITk-Strips
LumiCal mechanical design, integration with LDC and laser alignment
Integration and alignment of ATLAS SCT
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
Design and fabrication of Endcap prototype sensors (petalet)
L H C A T L A S International Collaboration on the LHC Project
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Peter Kodyš, Zdeněk Doležal, Jan Brož,
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
Presentation transcript:

From the ATLAS SCT endcap module production to the commisionning D. Ferrère, University of Geneva in behalf of the ATLAS SCT collaboration Overview: Introduction of SCT The endcap modules and the specifications The module production and logistics Production results: yield and statistics The endcap macro-assembly: status and results The integration and commissioning October 05, 2005 D. Ferrère, RD05 Florence

Atlas Experiment Good tracking performances that are required for: Secondary vertices Impact parameters resolution Track isolation Measurement of high momentum particles Barrel Toroid Main physics motivation is the search for the Higgs boson, but not only given the large range of physics opportunities! Barrel Electromagnetic Calorimeter October 05, 2005 D. Ferrère, RD05 Florence

The SCT Semiconductor Tracker SCT is made of 4088 modules: ~ 61 m2 of silicon 15,392 silicon wafers ~ 6.3 million of readout channels Layout was done such that 4 space points can be reconstructed 5.6 m 1.04 m Endacp C: 9 wheels 1.53 m Endacp A: 9 wheels 4 barrels October 05, 2005 D. Ferrère, RD05 Florence

center of the wheel. Pitch between 70 to 90 m. Endcap module types 1976 modules mounted on the 2 endcaps: 936 Outer Forward Modules 640 Middle Forward Modules (incl. 80 Short Middle) 400 Inner Forward Modules Middle short A module consists of 768 readout strips on each side with a constant angular pitch pointing towards the center of the wheel. Pitch between 70 to 90 m. October 05, 2005 D. Ferrère, RD05 Florence

Expanded view of an outer module 2 detectors strip-chained and readout at one end by 6 binary chips (ABCD3T) on each side  768 readout strips per side. Clock, control and signal are transmitted optically. Detectors are mounted back to back with a 20 mrad stereo angle. October 05, 2005 D. Ferrère, RD05 Florence

Module requirements Electrical specifications: (Based on a full set of digital/analog chip characterization + bias tests) Noise occupancy at 1 fC less than 5x10-4 also related to the input noise Less than 1 % dead channels ( 15/1536 ) – From the response curve test Detector current less than 20 mA at 350V per detector. Long Term Test (LTT) operation for 18-24 hours cold: thermistor on hottest part of hybrid at ~10 ºC Chip and detector biases and currents should remain stable top side bottom side October 05, 2005 D. Ferrère, RD05 Florence

Module requirements Mechanical specifications: XY alignment - 13 parameters defined but critical are Front-to-back detector alignment: midYF within ± 5 m Individual detector angles: a1 to a4 within ± 130 mrad Mounting hole and slot alignment: mhx, mhy and msy within ± 20 m Z detector profile – 50 points are focused on the Si-detectors and per module side. None of them should exceed ± 115 m envelope. The alignment and the profile must survive 10 thermal cycles between +35 ºC down to –30 ºC Chip and fanins must be assembled within a defined envelope to avoid clashes with neighbor modules Ceramic mounting surface should be clear of cracks (very fragile part) 13 XY alignment parameters 50 Z focus points for the module profile October 05, 2005 D. Ferrère, RD05 Florence

Module production and endcap flow diagram Cracow INP Freiburg Univ. CLRC, RAL Module production and endcap flow diagram Hybrids (Cicorel + Freiburg) Fanin production (CNM Barcelona) Spine Production (Protvino) Spine QA & rework (CERN) Hybrid QA Site Complete Si-Detectors (Hamamatsu & CiS) Module Production and QA Cluster Others: Washers, glue EndCap C macro-assembly Liverpool (UK) EndCap A Nikhef (NL) In progress ... Freiburg Univ. Geneva Univ.  CERN Manchester Univ.  Liverpool, Glasgow MPI, Munich  Prague Charles Univ, Prague Czech Tech. Univ. Melbourne  CERN Nikhef Valencia ID Integration Tests and cosmic run CERN SR1 January 2006 March 2006 ID Installation CERN ATLAS pit May/June 2006 October 05, 2005 D. Ferrère, RD05 Florence

Module assembly resources - 7 assembly sites in total involving 12 institutes or Universities Up to 6 technicians/site (~3 FTE) for the module assembly Up to ~8 physicists and PhD per site (~2 FTE) for the module QA Component selection and reception tests ~2h Alignment and assembly of detectors ~2h + 24h glue curing Detector current check and visual inspection ~40min Assembly with hybrids and fanins ~1h30 + 24h glue curing Wire bonding ~3h Detector current check and visual inspection ~15min Metrology survey ~30min Thermal cycling ~18h Electrical characterization ~2h30 Long Term Test electrical characterization ~24h Inspection and packing for storage ~20min From start to the end a module fabrication takes ~9 working days/module! In practice a module is issued after 3 to 4 weeks! October 05, 2005 D. Ferrère, RD05 Florence

Module assembly procedure Assembly with spine Module assembly procedure Detector alignment Assembly with hybrid and fanins Wire bonding October 05, 2005 D. Ferrère, RD05 Florence

Production Started in June 03 and completed in May-June 05 Endcap module production Production Started in June 03 and completed in May-June 05 Front side of an outer module Max production rate: ~55 modules/week Total : 2377 Outer : 1106 Middle : 775 Inner : 496 Number of modules were made with a 20% contingency to allow up to 15% lost at the production sites and 5% at the macro-assembly sites. Outer : 94.7% MidL : 94.4% MidS : 88.3% Inner : 87.4% Average yield : 93.1% October 05, 2005 D. Ferrère, RD05 Florence

Module is out of detector current specs! Few illustrations of problems found – Part of the learning curve Teflon surface Detector scratches due to trapped debris into the teflon surface of the transfer plate. Module is out of detector current specs! Si surface Detector broken due to debris that was sticking on the backplane. This happened when sucking down on the miniature alignment stage. Module is broken! The spacer mounted on the spine was glued with an angle and clash during the assembly was unavoidable but impossible to anticipate. Module was aborted! October 05, 2005 D. Ferrère, RD05 Florence

Electrical QA results Good Out of specs Good Out of specs October 05, 2005 D. Ferrère, RD05 Florence

Mechanical QA results Some stats on essential XY alignment parameters Pass Good Good midyF specification inside ± 5 microns mhy specification inside ± 20 microns Good Stereo angle specification 20 ± 0.13 mrad. Defined between front and back detector axis. October 05, 2005 D. Ferrère, RD05 Florence

Mechanical QA results ZminF Front and rear detector profile Pass Good October 05, 2005 D. Ferrère, RD05 Florence

52 outer and 40 inner modules Endcap macro-assembly Liverpool: Endcap C & Nikhef: Endcap A 40 middle modules Rear side 52 outer and 40 inner modules Front side Disk 5A in Module to Disk stand at NIKHEF October 05, 2005 D. Ferrère, RD05 Florence

Average Input noise on the complete endcap C Endcap C disk testing results (Liverpool) Average Input noise on the complete endcap C Outers : 1576e- Middles : 1529e- Inners : 1070e- Short Middles : 907e- Endcap A has similar results so far... October 05, 2005 D. Ferrère, RD05 Florence

Endcap C disk Thermal study (Liverpool) Tcoolant= -22 ºC, Tambient= -8 ºC Average±RMS: Hybrid main point: - 20.8 ± 0.8 ºC Detector-end temp: -18.5 ± 0.6 ºC (T. Jones) October 05, 2005 D. Ferrère, RD05 Florence

Delivery to CERN in January 06 Delivery to CERN in March 06 EC-C cylinder with discs 6 to 9 at Liverpool Endcap status Endcap C (Liverpool): Module to disc completed and tested Discs 9 to 5 in cylinder FSI to mount on discs 1 to 4 Service to cylinder started: cooling, LMT, fibers, DCS Delivery to CERN in January 06 EC-A Disk 8A inserted into cylinder at Nikhef Endcap A (Nikhef): Module to disc completed from 9 to 5 Disks 9 to 7 in cylinder Disk 5 under test Modules to be mounted on disc 4 Services to discs on disc 1 & 3 to do Services to cylinder started: cooling, LMT, fibers, DCS Delivery to CERN in March 06 October 05, 2005 D. Ferrère, RD05 Florence

Integration and commissioning at CERN SR1 The 2 ECs will arrive at CERN in January 06 and March 06 Reception tests: visual inspection, leak test and electrical tests Final SCT assembly Integration with TRT Combined tests SCT/TRT - 9 SCT discs will be tested together on 1 sector Installation into the pit foreseen in May and June 06 Cantilever stand with 1 endcap TRT trolley in aligned position for the integration October 05, 2005 D. Ferrère, RD05 Florence

Conclusions SCT is one of the largest Si-Tracker (~61 m2). A lot of expertise is essential from physicists, engineers and technicians in various fields such as: physics, mechanics, electronics, computing, thermodynamics,... Even with the strict requirements, a module yield as high as 93.1% was achieved . 2377 modules have been built and 1976 will be used in SCT. The EC module production was a great success and experience in all the assembly sites: 7 sites involving 12 universities and institutes. Modules are completely mounted on discs for EC-C and half for EC-A and module performances are as expected! The macro-assembly, service assembly, integration and commissioning are on the way or about to start at Liverpool, Nikhef and at CERN. The installation into the pit is close: May 06 and June06. October 05, 2005 D. Ferrère, RD05 Florence

Extra slides October 05, 2005 D. Ferrère, RD05 Florence

Running conditions and features 23 overlapping interactions every bunch crossing (at the full Luminosity) A bunch-bunch crossing every 25ns (40MHz) Maximum equivalent 1 MeV neutron fluence after 10 years is ~ 2.1014 n/cm2 Operating temperature on silicon detectors is -7oC to contain the reverse annealing and the leakage current BUT the maintenance will likely require yearly warm-up of 2 days at 20oC and 2 weeks at 17oC Operation in a 2 Tesla solenoid field Material < 0.4 X0 at the outer SCT envelope SCT coverage up to =2.5 More than 99% hit efficiency is required October 05, 2005 D. Ferrère, RD05 Florence

Module components Hybrid: - 6 copper-kapton layers laminated onto a carbon-carbon substrate - Equipped with 12 ABCT3T readout chips and opto-chips for clock/control and readout Detectors: 5 detector types made in 4 inch wafers by 2 manufacturer (Hamamatsu and CiS) 770 strips (1st and last not readout) of 20 micron width with an average pitch of ~80 mm Fanins: Aluminum strips on glass used for electrical connection and thermal isolation between hybrid and detectors. Different sets for the 3 module types. 4 items per module: 2 left and 2 rights Spine: Made of TPG (Thermal Pyrolytic Graphite) for the excellent thermal conductivity and AlN ceramic pieces for the mechanical stiffness. All in one single item during the module assembly. Location pads: very precise hole and slot made on an Aluminium washer and glue onto FR4 piece. The slot washer is glued on the spine and the hole is overlapping the hybrid and the spine. October 05, 2005 D. Ferrère, RD05 Florence

SCT production Database Oracle DB (kernel 9i) SCT production Database Why? Traceability of the items, shipped items, assemblies and tests that had been made Most of the relevant test data and parameters were stored in structured way otherwise stored in raw data Useful GUI has been made either for upload or report thanks to: Java applications for massive data upload Web interfaces (SQL form) for individual data access or report Java or other applications coupled with root display for statistics and reports Encourages auto-discipline. Data transparent to all the collaboration and DB entries were one of the requirements to be qualified for the module production. October 05, 2005 D. Ferrère, RD05 Florence

Electrical QA results Long Term Test (LTT) After some stats decreased from 24h to 18h duration Very rare problems found with the modules (0.05%)! In principles problems are detected earlier during hybrid LTT. October 05, 2005 D. Ferrère, RD05 Florence

Endcap macro-assembly October 05, 2005 D. Ferrère, RD05 Florence