Subsystem Build & Test Andre Pelletreau, Jeremy Willman, Kai Maslanka, Vincent Stowbunenko, & Kerry Oliveira
Risk Assessment
Problem Tracking
Mechanical Enclosure Status Update All drawings complete Brackets cut, drilled and countersunk Assembly Document written Aluminum enclosure sheets completed (Handouts!!!) Finished today after weeks of asking John Bonzo
Architecture And Implementation of Software Main File Performs The Calibration and Testing Protocol Specified By Bear Main File is Primarily Composed of Functions That Enable Control Signals, Processes/Stores Data, Acquires and Checks Real Time Measurements Main File Contains Minimal Code To Minimize Debug Time By Storing Functions As Separate Arduino Files Separate Functions Are Written By Individual Members to Maximize Throughput
Verification Methodology Testing Can Begin Once Boards Are Completed Individual Functions Will be Enabled And The Resulting Response will be monitored Once All Functions Are Individually Tested, The Completed Main Function can be Executed On A Known Good and Bad Board to ensure There are no False Positives or False Negatives Software Testing Is Expected To Take The Largest Portion of Semester To Complete
IMAGINE RIT Progress Proposal submitted Poster outline and format complete Background and Mission Statement complete Other details to follow throughout the semester Paper outline complete Abstract and Background complete
Background for Poster The Smart Power Supply Test Bench is an automated test fixture used to lower the time spent testing and the total cost of quality assurance on a custom power supply and control board assembly. The unit provides consistent power to an oil drill over long distances. The Smart Power Supply Test Fixture fully calibrates and tests the functionality of the power supply board and controller board serially and in parallel in under 10 minutes. Original constant current and constant voltage load designs, an Arduino micro-controller, and relays switching between active loads for testing aid in the automation. The production of this fixture will dramatically increase the speed, efficiency, and safety of testing.
Paper
Final Paper Outline
Next Seven Weeks…