Subsystem Build & Test Andre Pelletreau, Jeremy Willman, Kai Maslanka,

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

Institute of Applied Technology Project PPT 3 February 22, 2011.
MotoHawk Training Model-Based Design of Embedded Systems.
Speedstack: PCB Stack Up Data Exchange Using IPC-2581 Rev B
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
DISSOLVED OXYGEN MONITOR TEAM MEMBERS: ANDREW BEOUGHER ANTHONY SWOPE HAO WANG I-CHUN CHAO BING BAI COLIN HICKS Senior Design Dec1211 Dec1211.
Unit 5 – eProject – Starting to look at projects Unit 5 Looking in more detail at the structure of the course. 1)Get into groups – 2 X 3 2)All meetings.
1 Software Construction Software Construction Chapter 1.
IT Systems Analysis & Design
CLEANROOM SOFTWARE ENGINEERING.
The information contained in this document is Volvo Aero Corporation Proprietary Information and it shall not – either in its original or in any modified.
Requirements Engineering CSE-305 Requirements Engineering Process Tasks Lecture-5.
Software Process Models.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Software Development Process and Management (or how to be officious and unpopular)
Software Engineering Management Lecture 1 The Software Process.
A New Method For Developing IBIS-AMI Models
1 Description and Benefits of JWST Commanding Operations Concept TIPS/JIM Meeting 17 July 2003 Vicki Balzano.
Printing: This poster is 48” wide by 36” high. It’s designed to be printed on a large-format printer. Customizing the Content: The placeholders in this.
Lecture 3 Software Engineering Models (Cont.)
© Mahindra Satyam 2009 Configuration Management QMS Training.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Lab 07: AEV Design Analysis Tool Advanced Energy Vehicle (AEV)
An Introduction to Software Engineering
WHY DO WE DO THIS? WHY DO WE DO THIS? WHAT WILL WE DO? WHAT WILL WE DO? WHAT WILL WE ACHIEVE? WHAT WILL WE ACHIEVE? Quality Consultants NAME OWNER AND.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Software Development A Proposed Process and Methodology.
© 2006 Pearson Addison-Wesley. All rights reserved 2-1 Chapter 2 Principles of Programming & Software Engineering.
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
ECE791 Senior Design Experience Project Requirements and Timeline.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
TEST PROCEDURE Testing the Controller Board, Power Supply Board, and Unit as a Whole.
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
What has been accomplished at the end of MSD 1 & 2?
Background Customer Requirements Final Test Fixture Subsystems P16203: Smart Power Supply Test Bench CUSTOMER: Bear Power Supplies, Phelps, NY PROBLEM:
INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA.
Product Design ~ Summer Task Real World Engineering A report on the production of a cordless drill.
CJA 454 Week 5 Learning Team Grant Proposal and Presentation NEW Check this A+ tutorial guideline at
BSA 385 Week 4 Individual Assignment Frequent Shopper Program Part 3 For the items specified in the technical architecture document developed for the Frequent.
District and Club Qualification
8.04 Utilize project-management skills to start, run, and end projects
Software Engineering Management
P07203 Dynamometry Laboratory Infrastructure
Systems Analysis and Design
Introduction to New Product Development (Portfolio)
DIP 2005 Final Project Proposal
Maintaining software solutions
FORMAL SYSTEM DEVELOPMENT METHODOLOGIES
IT Systems Analysis & Design
NTC 411 Competitive Success-- snaptutorial.com
NTC 411 Education for Service-- snaptutorial.com
NTC 411 Teaching Effectively-- snaptutorial.com
P15311: PCB Router Phase 5 System Pass Off with Customer
P17082 Biomechanical Elbow Model Build and Test Review
ECE/BENG-493 SENIOR ADVANCED DESIGN PROJECT
API 17Q – Subsea Equipment Qualification
P17082 Biomechanical Elbow Model Final Presentation
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
Senior Project Portfolio Preparation
KEY PROCESS AREAS (KPAs)
Delran Township School District
P14551: Multi-Process 3-D Printer
District and Club Qualification
P11017 Tactile Navigation Interface
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
Team P16228: Magnetically Levitated Propeller
Project Management Unit #2
Presentation transcript:

Subsystem Build & Test Andre Pelletreau, Jeremy Willman, Kai Maslanka, Vincent Stowbunenko, & Kerry Oliveira

Risk Assessment

Problem Tracking

Mechanical Enclosure Status Update All drawings complete Brackets cut, drilled and countersunk Assembly Document written Aluminum enclosure sheets completed (Handouts!!!) Finished today after weeks of asking John Bonzo

Architecture And Implementation of Software Main File Performs The Calibration and Testing Protocol Specified By Bear Main File is Primarily Composed of Functions That Enable Control Signals, Processes/Stores Data, Acquires and Checks Real Time Measurements Main File Contains Minimal Code To Minimize Debug Time By Storing Functions As Separate Arduino Files Separate Functions Are Written By Individual Members to Maximize Throughput

Verification Methodology Testing Can Begin Once Boards Are Completed Individual Functions Will be Enabled And The Resulting Response will be monitored Once All Functions Are Individually Tested, The Completed Main Function can be Executed On A Known Good and Bad Board to ensure There are no False Positives or False Negatives Software Testing Is Expected To Take The Largest Portion of Semester To Complete

IMAGINE RIT Progress Proposal submitted Poster outline and format complete Background and Mission Statement complete Other details to follow throughout the semester Paper outline complete Abstract and Background complete

Background for Poster The Smart Power Supply Test Bench is an automated test fixture used to lower the time spent testing and the total cost of quality assurance on a custom power supply and control board assembly. The unit provides consistent power to an oil drill over long distances. The Smart Power Supply Test Fixture fully calibrates and tests the functionality of the power supply board and controller board serially and in parallel in under 10 minutes. Original constant current and constant voltage load designs, an Arduino micro-controller, and relays switching between active loads for testing aid in the automation. The production of this fixture will dramatically increase the speed, efficiency, and safety of testing.

Paper

Final Paper Outline

Next Seven Weeks…