Overview of the Frascati Production Facilities

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.
Status of the ATLAS MM project
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon.
DESY Zeuthen 1 Precision drift chambers (MDT) for ATLAS muon system. G.Chelkov JINR (Dubna) DESY Zeuthen 10 September 2002.
20 June 2008E906 Collaboration Meeting1 Tracking Chambers for FNAL E906 Edward R. Kinney University of Colorado, Boulder, USA Overview of Station 1 Status.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
ATLAS BIS MDT wiring facility D. Fassouliotis P. Ioannou C. Kourkoumelis V. Pancheluga D. Pappas E. Stefanidis V. Birioukov (engineer from Protvino) UNIVERSITY.
Chamber production status 75% of production (of 1st half of detector) reached in May Currently ~80% is produced 100% (1st half) expected in October. End.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
Automated Assembly Facility Tinisha McMillion ET-494 Spring 2014 Advisor: Dr. Roy Bonnette Instructor: Dr. Cris Koutsougeras.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Marcel Vreeswijk (NIKHEF) Introduction The NIKHEF production Three Production Schemes –MPI NOW –MPI FUTURE –NIKHEF CLAMPS Conclusions Appended: photographs.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 1 Towards Ecal Assembly Julien Bonis
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
My personal Resumé Very interesting work-shop, stimulating atmosphere and very good discussions. Accommodation is excellent. For the Straw Project we have.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
ELENA installation progress F. Butin / ELENA collaboration.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Zhe Yang Michigan REU Program Symposium August 9, 2017
We started last December: 32 channels prototype “Julich like” to:
Update on Pavia MM mechanical prototype
Module Loading Task Force Meeting October 21, 2004
Quality Control in Straw Production
RPC built a new plastic (peek doped with CB)
Structure and etc Shoji Uno (KEK) at B2GM
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Module Production and Testing at Duke
ATLAS Wire Tension Measurement system
STAR TOF MRPC Mass Production & Q.C. (USTC)
Process Flow For Electronic Component Prep
Experimental equipment Edgar L. Black February 17, 2019
First prototype module released from the assembling platform
Presentation transcript:

Overview of the Frascati Production Facilities Chamber assembly Developed and implemented in Frascati since many years (BML98, BML96) Now finalized to the final decisions made on the chamber Wiring Machine At the end of ’98 started a program of design and development of a fully automated machine.

Wire tension measurement A system, based on electrostatic method, capable of measuring up to 16 tubes at a time has been developed and built. Gas leak and HV test station A system capable of measuring 64 tubes has been developed and built Wire-tube position measurement The EMMI, developed and built by Rome and Pavia, has been adopted

A large hall in which the clean room is located is available Storage The above listed facilities are housed in separate areas inside a single large clean room. Hall Space A large hall in which the clean room is located is available Storage Storage (and transport) structures have been designed and 2 prototypes have been built

Cosmic Ray Test Station It is under construction Chamber gas leak test stand It has to be designed and realized Data Base The Data Base system is being implemented

Module 0 Module 0 is being built 2 layers - one on each side – glued praxial alignment platforms glued Produced > 200 tubes The construction is going on with continuity. Interventions for the optimization of the performances are postponed

Module 0 After full experience with module 0 effort for the optimization before moving to full speed production