WP5: Dissemination, studies, web portal and tools

Slides:



Advertisements
Similar presentations
© 2006 Open Grid Forum Build, Test and Certification of Grid and distributed software Community Group Current practices and short term plans in Building,
Advertisements

© 2006 Open Grid Forum Build, Test and Certification of Grid and distributed software Community Group Overview and Status update Marc-Elian Bégin ETICS.
OMII-Europe Repository Steven Newhouse Director, OMII-UK.
Assistive Technologies and Inclusive Solutions for All María Elena Gómez Martínez Technical Coordinator – Technosite Maastricht, The Netherlands 29th -30th.
FPS HEALTH, FOOD CHAIN SAFETY AND ENVIRONMENT 1 Joint Action on Health Workforce Planning and Forecasting Zuzana Matlonova Brussels – April 11th, 2013.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Development plan and quality plan for your Project
 For the implementation of the EPBD and the targets optimal design strategy is needed for energy efficient buildings by applying an integrated.
Role of Management and Technical Coordination
9/11/ SUPPORT THE WARFIGHTER DoD CIO 1 Sample Template Community of Interest (COI) Steering Committee Kick-off Date: POC: V1.0.
The Preparatory Phase Proposal a first draft to be discussed.
WP10 Dissemination Oleg Liber, U. Bolton UK Objectives 1.To disseminate, on an on-going basis, the RTD outcomes: specifications and standards, architectures,
EMI SA2: Quality Assurance (EMI-SA2 Work Package) Alberto Aimar (CERN) WP Leader.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
INFSOM-RI Training: Browsing and Editing with Web Tools Paolo Fabriani, Engineering Ingegneria Informatica S.p.A. (Italy) ETICS.
INFSO-RI NA2 Status Update ETICS2 second AHM Isabel Matranga Engineering Ingegneria Informatica SpA Darmstadt, February 2009.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
EMI INFSO-RI NA2 – Outreach and collaborations Status Report Emidio Giorgio (INFN Catania) Work Package Leader EMI First EC Review 22 June 2011,
LAW&ICT Shared Virtual Campus, Zaragoza Meeting, October model for technical support to LAW&ICT Shared Virtual Campus: a proposal Selahattin Kuru.
NA2 objectives The „v.E.R.C.“ (virtual Earth System Resource Center) v.E.R.C is: A (technical) infrastructure to improve the utilization of the ESM core-infrastructure,
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
INFSOM-RI WP NA2 Dissemination, Training and Certification Isabel Matranga Engineering Ingegneria Informatica S.p.A. ETICS 2 Kick.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
INFSOM-RI WP5: Dissemination, Training, Certification Study and Web Interface Status Report ETICS All-Hands – 21 November 2007.
WP6 – Dissemination Project Name: Enhancing Students Participation in Quality Assurance in Armenian HE- ESPAQ Ref TEMPUS BE-TEMPUS-SMGR.
INFSOM-RI Project Overview Alberto Di Meglio Project Manager 2.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
INFSOM-RI WP1: Administrative and Technical Management Alberto Di Meglio Project Manager.
INFSOM-RI ETICS: E-infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio Project Manager.
EMI INFSO-RI SA2: Quality Assurance Status Report Alberto Aimar(SA2) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
INFSOM-RI The ETICS Service Configuration, Building and Testing Elisabetta Ronchieri, ETICS Project, INFN CNAF.
INFSOM-RI Project Status Update Alberto Di Meglio Project Manager.
DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)
MENTEP kick off meeting and bilateral discussions Brussels, 13 April 2015 MENTEP in a nutshell …from the partners’ point of view Patricia Wastiau European.
ETICS, EU-OMII and the Software Repository Andrea Caltroni, INFN Padova ETICS 1 st All-Hands Meeting, Budapest - May 29-31, 2006.
Decisive – WP7 Decisive meeting at Stockholm, May 27th Susanna Teppola VTT Technical Research Centre of Finland.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
Brussels, January 16th, Overview and status of the project.
Kick Off Meeting Largs, Scotland
AMICI WP1 – Management, coordination and dissemination
THE GISELA PROJECT Herbert Hoeger WP2 Manager - ULA (Venezuela)
NA2 Status Update ETICS2 first AHM Isabel Matranga
BUSINESS DRIVEN TECHNOLOGY
WP6. Quality Plan 6.2 Develop a monitoring, evaluation, and quality plan Edited by September, 2017.
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
E-Infrastructure for Testing, Integration and Configuration of Software Alberto Di Meglio CERN, INFN, Engineering, 4D Soft, University of Wisconsin.
Marc-Elian Bégin ETICS Project, CERN
Release BETA Integration Tool Status Geneva – 1 March 2007
Ian Bird GDB Meeting CERN 9 September 2003
KM3NeT 2.0 Kick-off meeting, Athens,
SEEDS Kick-off meeting May 6, Lausanne Bojana Tasic Renate Kunz
ETICS Pool for IPv6 tests
EGEE and Induction Mike Mineter NeSC Training Team
Elisabetta Ronchieri WP3
CHAIN WP5 Meeting, Lyon 20 September 2011
The ETICS Build and Test Service
ETICS Services Management
Insights on industrial usage from NMI3 and SINE 2020
BioMedBridges – Work Packages 2 & 12
AMICI WP1 – Management, coordination and dissemination
LOSD Publication Deirdre Lee
WP2 Communication WP and tasks presentation
Introdicution to EGI.eu
MARDS DISSEMINATION & EXPOILTATION
Presentation transcript:

WP5: Dissemination, studies, web portal and tools ETICS Kick-off – 20 January 2006 Marc-Elian Bégin ETICS WP5 Leader CERN

Content Team composition, recruitment status Goals and responsibilities Work done so far on ETICS Relationships with other WPs and external projects Risk assessment ETICS Kick-off - WP5 - 20 January 2006 - CERN

Stefano De Panfilis and others Team composition The WP5 team is complete: WP5 Leader CERN Marc-Elian Bégin WP5 Deputy Engineering Andrea Manieri WP5 Quality Assurance Engineering Stefano De Panfilis and others WP5 Web App Engineering Paolo Fabriani WP5 Web App Engineering Vitor Graziano ETICS Kick-off - WP5 - 20 January 2006 - CERN

Goals and responsibilities: Objectives Disseminate project results and organise dissemination and training events Promote awareness about the need for quality in research projects software development activities Investigate and collaborate with similar initiatives to the definition, applicability and scope of quality assurance policies and standards Investigate the feasibility of a certification process for software developed by research projects and outline a roadmap for its implementation Set up the project portal for the wide aggregation of user community and to supply the ETICS services ETICS Kick-off - WP5 - 20 January 2006 - CERN

Goals and responsibilities: Tasks WP5 Dissemination, studies, web portal and tools A5.1 Organise meetings, workshops, training and other dissemination events A5.2 Prepare feasibility study for the software Quality Certification and the knowledge usage and dissemination plan A5.3 Set up the project portal ETICS Kick-off - WP5 - 20 January 2006 - CERN

Goals and responsibilities: Deliverables D5.1 – ETICS portal – Community support PM03 D5.2 – Promotional Material D5.3 – Dissemination and training plan PM04 D5.4 – Plan for using and disseminating Knowledge (first draft) PM06 D5.5 – Plan for using and disseminating Knowledge (second draft) PM12 D5.6 – ETICS portal – testing support service (prototype) D5.7 – Quality Certification feasibility study and sustainability strategy PM20 D5.8 – ETICS portal – testing support service (final) PM22 D5.9 – Plan for using and disseminating Knowledge (final) PM23 ETICS Kick-off - WP5 - 20 January 2006 - CERN

Goals and responsibilities: Milestones M5.1 – Promotional package, logos, brochures available PM03 M5.2 – Training course and demos available on-line PM12 M5.3 – ETICS Service fully operational PM22 ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Dissemination Graphical identity, designed in collaboration with Alexandre Bénac Slogan Variations of the logo (e.g. mono-chromatics) Graphical chart ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Portal layout http://www.eu-etics.org ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Prototype Web Application Web Service Via browser Report DB Project DB Build/Test Artefacts NMI Scheduler Via command- Line tools NMI Client Wrapper WNs ETICS Infrastructure Clients ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Prototype Web Application Web Service Via browser Report DB Project DB Build/Test Artefacts NMI Scheduler Via command- Line tools NMI Client Wrapper WNs ETICS Infrastructure Clients ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Prototype Client ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Prototype Web Application Web Service Via browser Report DB Project DB Build/Test Artefacts NMI Scheduler Via command- Line tools NMI Client Wrapper WNs ETICS Infrastructure Clients ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Prototype Web Application Web Service Via browser Report DB Project DB Build/Test Artefacts NMI Scheduler Via command- Line tools NMI Client Wrapper WNs ETICS Infrastructure Clients ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Prototype Web Application layout ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Prototype Web Application Web Service Via browser Report DB Project DB Build/Test Artefacts NMI Scheduler Via command- Line tools NMI Client Wrapper WNs ETICS Infrastructure Clients ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Prototype Web Application Web Service Via browser Report DB Project DB Build/Test Artefacts NMI Scheduler Via command- Line tools NMI Client Wrapper WNs ETICS Infrastructure Clients ETICS Kick-off - WP5 - 20 January 2006 - CERN

Work done so far on ETICS: Prototype Preliminary integration of the client with NMI ETICS Kick-off - WP5 - 20 January 2006 - CERN

Relationships with other WPs Dissemination and training requires by definition interactions with all WPs, and Will first be tested on the ETICS team Since we will Eat our own dog food, the web application will be used by all WPs Web interface is client of the web service build-system (WP3) and the testing (WP4) Community portal provides a forum for ETICS partners and users ETICS Kick-off - WP5 - 20 January 2006 - CERN

Relationships with external projects EU-OMII Will be member of the ETICS board of experts Collaboration are being put in place such that the EU-OMII middleware is build and tested using the ETICS Service BELIEF Will work together on joint Quality Assurance events GGF We plan to participate in definition of standards and automated tools, which still has to be clarified ICEAGE Collaborate and participate in training events Other NESSI, C-OMEGA, etc ETICS Kick-off - WP5 - 20 January 2006 - CERN

Risk assessment Definition of the ETICS Quality Certification Process is not clearly defined Mitigation: involve the Board of Experts, to guide the scope to the certification The composition of the Board of Experts has to be representative of future stake-holders of the ETICS certification process Mitigation: confirm the participation of current members and exploit leads given by ETICS partners ETICS Kick-off - WP5 - 20 January 2006 - CERN