Introduction to pipe sizing for high rise buildings Lesson No 9 (15 minutes)
Different Combinations Up-feed system with a pressure pump Up-feed system where half the building is directly from the water main and half with a pressure pump. Down-feed system, requiring a booster pump at ground level, a header tank at the top of the building and a pressure pump to feed the top 4 to 8 levels. Note: In these cases more than one ‘Project File’ is required to complete the pipe sizing.
Not for Potable Water
Making Duplicate Files When the project details are completed, if duplicate files are required now is a good time to make them. Use the same project file number, simply add ‘a’ ‘b’ or ‘c’
Fire Potable Water