4G_CA project_OSS Justification

Slides:



Advertisements
Similar presentations
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Post Launch Tuning Cingular UMTS.
Advertisements

Layer 3 Messaging and Call Procedures
RetainAbility/SARR(Session abnormal release rate) :-
LTE-A Carrier Aggregation
Kampala, Uganda, 23 June 2014 ITU-T Recommendation E.807: “Definitions and associated measurement methods of user-centric parameters for call handling.
Radio Network Tuning and Optimization for Universal
Channel Switching Capability Impacting features Channel Switching
Mpcs la lte ho parameters trial
RF OPTIMISATION IN GSM NETWORKS Regional Telecom Training Centre, Trivandrum :
Capacity and Load Sharing in Dual-Mode Mobile Networks
Slide title In CAPITALS 50 pt Slide subtitle 32 pt HANDOVER Overview.
Janne Myllylä T GPRS optimisation and Network visualization.
06/09/2005Master's Thesis Seminar - Jesse Kruus 1 Analyzing and Developing Base Load for WCDMA Base Station Automated Testing System Thesis written at.
1© Nokia Siemens Networks Confidential Realities of LTE Deployment Bill Payne Head of Innovation Team CTO Office.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Dynamic and Persistent Scheduling for Voice over IP Traffic in the Long-Term Evolution Uplink Master’s.
Business Id © NetHawk All rights reserved. Confidential April 2005NetHawk NetHawk Quality of Service products Markus Ahokangas, MSc Product.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POST LAUNCH TUNING.
Analyze Assure Accelerate TM HSDPA Roadmap. Analyze Assure Accelerate TM SR3420 WCDMA Network Emulator SR3420 is a new WCDMA network emulator platform.
Rev PA1 WCDMA RAN PM - Supplemental Information 3/3/20051 WCDMA RAN PM Supplemental Information.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Capacity Management in WCDMA.
Maximum Value.
2G Vs 3G Drive TEST with tems
HUAWEI 3G CAPACITY OPTIMIZATION.
Ultra-Flash CSFB(SRVCC based CSFB)
LTE L17A O&M courses and RBS 6000 / Baseband related courses
Guide of Genex Assistant for LTE
Hammer Project KV020 S-KPI CBO
Active Antennas Solutions 1st European Trial of AAU3902
Celcom Golden cluster Post Drive test peak result
Nominal Plan For PC_SBE_05
Nominal Plan For PC_SBE_10
Executive Summary GFR has been successfully implemented on 22th April 2014 POC MATARAM: Perceived Drop Rate, SDCCH Drop Rate, SDCCH Success Rate , TBF.
Which network parameters are interesting
Long Term Evolution (LTE) and System Architecture Evolution (SAE)
Project hammer T00278 LTE DT Analysis Celcom CA Project
What is Actix Spotlight ?
Project CA project T00087 oss KPI justification - Appendix CA Project
Hammer Project Celcom CA SSO Project
Project hammer d00346 Sub Cluster CA - SSO Celcom CA Project
Author: Mathias Nyman Supervisor: Prof. Sven-Gustav Häggman
Hotspot KPI Guideline YL.Y
4G_CA project_OSS Justification
Hammer Project KV020 S-KPI CBO
Single Site Acceptance Report for TIGO UMTS Project Phase II
Project hammer Cluster C00200 CA - SSO Celcom CA Project
Hammer Project KV020 S-KPI CBO
Hammer Project Celcom CA SSO Project
Project hammer d00219 Sub Cluster CA - SSO Celcom CA Project
Celcom KV/OKV Hammer Project
UMTS Call Drop Analysis
Celcom LTE CA Project_OSS
PC_SBE_09 WCDMA OSS Analysis
Celcom LTE CA Project_OSS
LTE Mobility LTE Mobility.
Hammer Project Celcom CA SSO Project
PROJECT BAU MODERNIZATION
Project hammer PC_CA_SWE_07 CA Celcom CA Project
Evaluation Model for LTE-Advanced
Mobility Management for IEEE m
LTE System Testing Wroclaw
An Overview on LTE.
Project hammer PC_CA_ERE_06 LTE DT ANALYSIS Celcom CA Project
Hauwei hcs in dual band netwrok
“Predictive Mobile Networks”
5G Micro Cell Deployment in Coexistence with Fixed Service
Cisco Prime NAM for Application Performance Troubleshooting
Network-Health Report
Philadelphia CL01 Initial Cluster Report
CAPACITY ASSESSMENT REGIONAL 09_SULAWESI From Active Cells, 6051 sites are already high users From 4675 Sites, only 0.8 % (37 Sites) with High CE.
Radio Link Layer tuning in HSPA Evolution Laura Kneckt Supervisor : Professor Jyri Hämäläinen Instructor: M. Sc. Stefan Wager.
Presentation transcript:

4G_CA project_OSS Justification 2017-05-02 Project CA project Q00548 4G oss KPI justification - Appendix © Ericsson AB

Multitech 2G kpi Justification PROJECT BAU MODERNIZATION 2016-10-26 Multitech 2G kpi Justification

PC_CA_SWE_08 2G oss kpi Refer to OSS Analysis # Description Target Value Technology Baseline KPI Result PASS/FAIL comments 2G (23/01/2017 - 29/01/2017) (03/05/2017-09/05/2017) A.19.4.19.1 Cell Availability Maintain/Improved 99.81 99.97 PASS A.19.4.19.2 CSSR_Voice 99.68 99.76 A.19.4.19.4 DCR_Voice 0.15 A.19.4.19.5 PS_Drop 1.05 1.03 A.19.4.19.17 Timing Advance 0.00 A.19.4.19.18 CS Traffic (Erl) 23895.68 26106.63 A.19.4.19.19 TCH attempt 845143.00 792684.00 Fail Refer to OSS Analysis A.19.4.19.20 PS traffic (GB) 306.15 258.93

PC_CA_SWE_08 2G oss kpi justification

PC_CA_SWE_08 2G oss kpi justification

PC_CA_SWE_08 2G oss kpi justification Hammer Project KV020 S-KPI CBO 2016-08-26 © Ericsson AB 2016

PC_CA_SWE_08 2G oss kpi justification

Multitech 3G kpi Justification PROJECT BAU MODERNIZATION 2016-10-26 Multitech 3G kpi Justification

PC_CA_SWE_08 3G oss kpi justification Region CA Cluster Location ID Site Name 4G Site ID Co-Site 3G Site ID Co-Site 2G Site ID CA On Air Date SARAWAK PC_CA_SWE_08 Q00278 LIHUAHOTEL QL10081 QW10081 G6355 2017/2/8 Q00266 PDRMBTU QL10189 QW10189 G6328 2017/2/11 Q00282 CHINESECHAMBER QL10084 QW10084 G6359 2017/3/15 Q00666 TGBATUCOMM QL10082 QW10082 G6303 2017/4/7 Q00288 SGNYIGU QL10156 QW10156 G6365 2017/4/9 Q01297 TAMANBAMBOO QL10987 QW10987 2017/4/10 Q00667 TMNYANMIN QL10154 QW10154 G6308 Q00253 PUSPAKOMBTU QL10393 QW10393 G6314 2017/4/13 Q00832 JLNDAGANGBTU QL10724 QW10724 G6304 Q00682 SHAHIDACOMM QL10450 QW10450 G6377 2017/4/14 Q00548 BKTORANG QL10390 QW10390 2017/4/21 Q00723 TMNRIA2 QL10085 QW10085 G6391 2017/4/22 Q01653 TMN KEMENA SUTERA 2 QL10738 2017/4/25 Q00665 MEDANJAYA QL10083 QW10083 G6312 2017/4/27 Q00246 JLNSEBIEW QL10174 QW10174 G6305 2017/5/3

Refer to OSS Justification PC_CA_SWE_08 3G oss kpi justification # Description Target Value Technology Baseline KPI Result PASS/FAIL comments   3G 2017-01-23 to 2017-01-29 2017-05-15 to 2017-05-21 A.19.4.19.1 Cell Availability Maintain/Improved 98.84 99.55 PASS A.19.4.19.2 CSSR_AMR 99.85 99.73 Fail Refer to OSS Justification A.19.4.19.3 CSSR_PS 99.78 99.76 A.19.4.19.4 AMR Call Drop Ratio 0.26 0.25 A.19.4.19.5 PS Service Drop Ratio 0.57 0.53 A.19.4.19.6 SHO Success Rate (AMR Service) 99.93 99.96 A.19.4.19.7 SHO Success Rate (PS Service) 99.94 A.19.4.19.8 HS-DSCH Service Cell Change Success Rate 99.98 99.99 A.19.4.19.9 HSDPA RAB Setup Success Rate 99.05 99.07 A.19.4.19.10 HSUPA RAB Setup Success Rate 99.88 A.19.4.19.11 HSDPA Retainability 0.61 A.19.4.19.12 HSUPA Retainability 0.60 0.55 A.19.4.19.13 CS Inter-RAT Handover Success Ratio 99.84 99.87 A.19.4.19.14 CS Inter-Frequency HHO Success Rate 98.93 98.50 A.19.4.19.15 PS Inter-Frequency HHO Success Rate 98.41 98.10 A.19.4.19.16 RTWP -102.37 -102.57 A.19.4.19.17 PRACH propagation delay(KM) 0.73 0.74 A.19.4.19.18 CS Traffic(Erl) 23352.28 27056.73 A.19.4.19.19 CS RAB attempt 1361555.00 1378705.00 PS RAB attempt 102390649.00 106489529.00 A.19.4.19.20 PS traffic(MB) 19341750.87 23373404.88

Hammer Project KV020 S-KPI CBO 2016-08-26 PC_CA_SWE_08 3G oss kpi justification Add propagationdelay. Analysis: CSSR AMR (99.73%) didn’t pass the target (99.85%) mainly due to fluctuation of Q118B_Q00288OD_SGNYIGU which is on air on 11th May. © Ericsson AB 2016

Hammer Project KV020 S-KPI CBO 2016-08-26 PC_CA_SWE_08 3G oss kpi justification Analysis: Add propagationdelay. After below optimization, CSSR AMR is improving and met the baseline in some days. Cluster capacity audit and congestion release(pwrAdm, pwrOffset, individualOffset). Worst cell analysis and optimization(maxFach1Power, minPwrRl, qRxLevMin). For detailed change, please refer to action list. © Ericsson AB 2016

Hammer Project KV020 S-KPI CBO 2016-08-26 PC_CA_SWE_08 3G oss kpi justification Analysis: Add propagationdelay. CSSR PS(99.76%) didn’t pass the target (99.78%) due to normal fluctuation. © Ericsson AB 2016

Hammer Project KV020 S-KPI CBO 2016-08-26 PC_CA_SWE_08 3G oss kpi justification Analysis: Add propagationdelay. CS and PS IFHO SR (98.50%, 98.10%) didn’t pass the target (98.93%, 98.41%) as KPIs degraded slightly after baseline alignment on 10th April. NonUsedFreqThresh4_2bEcno is changed from -10dB to -13dB, so IFHO could be triggered when target cell has poorer quality than before, causing IFHO failures increased. © Ericsson AB 2016

Hammer Project KV020 S-KPI CBO 2016-08-26 PC_CA_SWE_08 3G oss kpi justification Analysis: Add propagationdelay. PRACH propagation delay is maintained in the long trend and failed in result period due to normal fluctuation. © Ericsson AB 2016

Hammer Project KV020 S-KPI CBO 2016-08-26 PC_CA_SWE_08 3G oss kpi justification Add propagationdelay. © Ericsson AB 2016

Hammer Project KV020 S-KPI CBO 2016-08-26 PC_CA_SWE_08 3G oss kpi justification Add propagationdelay. © Ericsson AB 2016

4G OSS KPI Justification 4G_CA project_OSS Justification 2017-05-02 4G OSS KPI Justification © Ericsson AB

4G_CA project_OSS Justification 2017-05-02 PC_CA_SWE_08 4G oss kpi © Ericsson AB

4G_CA project_OSS Justification 2017-05-02 Q00548 4G oss kpi © Ericsson AB

Hammer Project KV020 S-KPI CBO 2016-08-26 Data CSSR & RRC CSSR & RRC Service & erab CSsr (%) Analysis: The CSSR for Data ,RRC,RRC service and eRAB of the cluster sites are 99.73%, 99.90%, 99.94%, 99.83% which has a slight degradation compare with the baseline 99.80%, 99.94%, 99.95%, 99.86%. The degradation is mainly cause by the adjusting of qrxlevmin (from -120 to -124) which aiming to keep more users on 4G, the subscribe at the cell edge will stick to LTE with low poor RF condition while the 4G total volume increased as a result, it’s an exceptional decrease just as below summary in mail; Baseline Result qrxlevmin © Ericsson AB 2016

Hammer Project KV020 S-KPI CBO 2016-08-26 CSFB Setup SR(%) Analysis: The CSFB Setup SR for the neighbor site is 99.94% which is a litter worse than baseline 99.95% ,it is normal fluctuation; Baseline Result Normal fluctuation © Ericsson AB 2016

Hammer Project KV020 S-KPI CBO 2016-08-26 eRAB DCR(%) Analysis: The eRAB DCR for the cluster site is 0.13% which is worse than baseline 0.10% was mainly due to the CA layer management parameters changed on whole OKV. CA layer management parameters was aiming to keep more users on 4G, which means the subscribe in cell edge will stick to LTE with low poor RF condition while the 4G total volume increased as a result, it’s an exceptional decrease just as below summary in mail; Baseline Result CA layer management parameters change © Ericsson AB 2016

Hammer Project CA SSO Report 2017-05-05 UL Packet Loss Rate Analysis: Feature Description 44/221 04-LZA 701 6014/1 Uen B2 , under Chapter 4, Network Impact. © Ericsson AB 2017

Hammer Project CA SSO Report 2017-05-05 UL Packet Loss Rate OKV DL PKT Loss Rate improved from (~0.35) to (~0.09) which will be reflected in user experience Baseline Result © Ericsson AB 2017

Hammer Project CA SSO Report 2017-05-05 Network Availability Analysis: The Network Availability Cell Level is 99.35% which is worse than baseline 99.73% was mainly due to several sites had the PLMN Service Unavailable alarm during 5/23/2017-5/29/2017. © Ericsson AB 2017

Hammer Project KV020 S-KPI CBO 2016-08-26 IRAT(%) Analysis: The IRAT SR Rate for the sites is 97.49% which is worse than baseline 97.89% was mainly due to the CA layer management parameters changed on whole OKV. The decreasing B2 and B2 Timer adjustment were aiming to keep more users on 4G, it’s harder to transfer to WCDMA for UE in cell edge than before, which means the subscribe will stick to LTE with low poor RF condition while the 4G total volume increased as a result, it’s an exceptional decrease just as below summary in mail; Baseline Result B2 B2 Timer © Ericsson AB 2016

4G_CA project_OSS Justification 2017-05-02 © Ericsson AB