HVAC SYSTEM DESIGN ALMAQASED HOSPITAL

Slides:



Advertisements
Similar presentations
HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

Typical Plumbing System
Plumbing 101 for Property Managers Presented by: [Put your name here] Welcome to... [Delete these logos and put your logos here]
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING.
Supervisor : Eng. Ramez Al Khaldi Prepared by : Bahaa Yousef Malhis Nodar Hisham Sabbah Ameer Ghazi Malhis Ala’a Abd An-Naser Diab.
Five star hotel in Nablus
Heating, Ventilating, and Air-Conditioning (HVAC)
Granulation Project 2 MECHANICAL SYSTEMS IN BUILDINGS IBN SENA HOSPITAL IBN SENA HOSPITAL Prepared by: Abdullah Hasayen Mazin Khalid Moath Ayyash Mohammad.
Components of HVAC System
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING DEPARTEMENT OF MECHANICAL ENGINEERING MECHANICAL SYSTEMS OF AL-OYOON HOSPITAL-NABLUS Graduation Project.
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
HVAC SYSTEM DESIGN Businessmen Club Supervisor: Dr Salameh Abdulfattah
May 2013 Supervisor Ins.RamezKhaldi Luay A. Aghbar ( ) Husni H. Malysha ( ) Mohammad S. Ahmad ( ) Yousif F.Abdi ( )
 Determine the waterline components needed to complete the water supply for the bathroom shown in figures 13-6 and 13-7.
Objectives Finish with ducts and fans Define project topics.
PROJECT NAME: “Mechanical System for school of optical” (An-Najah university College) Prep ared by: Abdulla Alawneh Islam Salahat Mohammed Jaber Majdi.
Management training Jumeirah beach residence sector 3 Presented by November 15 th 2006.
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING MECHANICAL ENGINEERING DEPARTMANT Mechanical Systems for jenin headquarter building Supervisor:The.
The students: Mohammad Shabaro ( ) Mahmoud Mousa ( ) Yosri Asfour ( ) Supervisor: Dr. Iyad Assaf 1.
1 Pipe2000 Campus Facilities Modeling by Dr. Don J Wood Pipe2000 Modules.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Prepared by : Hashem Ihasn Janajreh Mohammad Abu Sarah Sari Khaled Sobeh Ahmad Medhat Attiyah Supervisor : Dr. Iyad.
Drugs Addicts Rehabilitation Center
Prepared by : Ameed mahmoud qzaih Mohammad mustafa yaseen Samer abdelrazaq khanfar Supervisor : Dr. Eyad Assaf.
Prepared by : Abd Aljabbar Rabaya Ammar Salloum Sameh Shawahni Supervisor : Dr. Eyad Assaf 1.
EN-CV status EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2015/08/06.
Graduation Project Mechanical system for Building of_ al Kuwait Surgery Specialized Hospital.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Section 3 Using Heat.
Technology in Architecture Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing Example Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 10 : CONTROL VALVES IN CLOSED LOOP SYSTEMS.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Maria’s Restaurant Chapter 2 Section 9
}السلام عليكم ورحمة الله وبركاته{
Plumbing system fundamental and design course
Book E3 Section 1.4 Air-conditioning
The Data Center Challenge
An-Najah National University Secondary School Design
System Diagrams Symbol Library – Black Background David Sellers
HVAC Building & Floor Cooling System
An-Najah Sport Center An-Najah National University
Kindergarten Amani Nasasrah , Enas Awad Shadia Yamin , Sondos Ghanim
BUILDING HEATING AND COOLING
Heating, Ventilating, and Air Conditioning
Heating Ventilating and Air Conditioning
PROJECT NAME: “Mechanical System for school of optical” (An-Najah university College) Prepared by: Abdulla Alawneh Islam Salahat Mohammed.
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Al-Najah National University Mechanical engineering department
Mechanical System For AL-Rehan Hospital
Electrical Gas Plumbing Heating & Cooling
PLUMBING APPLIANCES & COMPONENTS
Air Conditioning System − 2
Heating, Ventilating, and Air-Conditioning
Chilled Beam Performance:
Typical Plumbing System
Graduation Project – 2 Mini-Mall
ME444 ENGINEERING PIPING SYSTEM DESIGN
______________ Combustion Engine
Adding Zones to Existing Systems
Maintenance at ALBA facility: Strategy for the conventional services
Mandatory Design Requirements
FBE03: Building Construction & Science
PROJECT NAME: HVAC AND MECHANICAL SYSTEMS DESIGN
Mechanical Systems Design for Al-Bahrain Hospital
Mechanical Systems For Al-Zakah Hospital
System Curve Example Design Condition 20 ft.w.c. required each way to deliver design flow to and from the headers at the loads Distribution Pump Bell.
Maria’s Restaurant Chapter 2 Section 9
Presentation transcript:

HVAC SYSTEM DESIGN ALMAQASED HOSPITAL   The students: Mohammad Shabaro (10611393) Mahmoud Mousa (10612458) Yosri Asfour (10508901) Supervisor: Dr. Iyad Assaf

Presentation out line - Hospital Description. - Heating load calculation. - Cooling load calculation. - Duct Design. - Pipe Design. - Riser and Boiler Room. - Plumping system. - Equipment Selection. - Summary

HOSPITAL DESCRIPTION Hospital location Country: Palestine City :Jerusalem Basement floor Emergency room & X-ray & labs & Nursery Unit& restaurant & kitchen & laundry & Blood Bank &Mortuary Ground floor Patient Room & Library & mosque & offices & Equipment Storage First floor Theater & ICU & Patient Room & pharmacy Second floor Histology & Microbiology & Patient Room & Endoscopy

Outside design condition Inside design condition HEATING LOAD -Inside and out side design condition: Outside design condition Inside design condition Parameters 4.7 °C 23 °C T: temperature 71.7 % 50 % Φ : relative humidity 3.7 g of water/kg of dry air 8.8 g of water/kg of dry air W : moisture content 9.15 °C Tun: unconditioned temperature 12 °C Tg : ground temperature

HEATING LOAD SUMMARY Q sensible (KW) Qlatent Q total Basement floor 185 43 228 Ground floor 204 52 256 First floor 206 80 286 Second floor 220 27 247 Total 815 202 1017

Outside design condition Inside design condition COOLING LOAD -Inside and out side design condition: Outside design condition Inside design condition Parameters 30°C 23 °C T: temperature 50 % Φ : relative humidity 13.2 g of water/kg of dry air 8.8 g of water/kg of dry air W : moisture content 4.7 °C Tun: unconditioned temperature 12 °C Tg : ground temperature

COOLING LOAD SUMMARY Q sensible (KW) Qlatent Q total Qtotal (ton) Basement floor 220 54 274 78 Ground floor 267 64 331 95 First floor 271 87 358 102 Second floor 292 67 359 Total 1050 272 1322 377

FRESH AIR DUCT Section from second floor

EXHAUST DUCT Section from second floor

Fancoil , pipe and diffuser Section from second floor Section from second floor

This plan illustrate how the FCU, Diffuser and Ducts are distributed in the room Room area=25m² Qsinsible = 4.5 KW Qlatent=0.5 KW Vven = 50(L/S) Vcir = 335(L/s) Vcir = 704(cfm) FCU model: RAC 8 CB H/C 4

RISER

Plumping system Potable Water: Collector system is used to regulate the distribution of the water, this collector are Distributed near the bathrooms and all Pipes are sized depend on fixture unit. Fixture Number of Fixture unit lavatory 0.5 shower 1 Water closet 2 Total Cold Water Fixture Unit is 380 F.U & Total Hot Water Fixture Unit is 140 F.U Domestic hot water boiler is 293 KW Domestic water storage tank is 150 m³

Water distribution

Potable water RISER

BOILER ROOM

Drainage system: Any horizontal branch must be sloped in range (1-1.5)cm for every 100 cm. Every stack size is 4” Every stack contain vent that’s size is 4” Building drains are connected by horizontal branches in size 8 inch

Fire fighting system: In Almaqased Hospital there is 20 landing valve and 20 fire cabinet Distributors in the building , in each floor there is five landing and five fire cabinet Pump is selected to provide 1000 gpm and 130 psi, the water must be provide the further landing valve by 250 gpm and 100 psi Storage tank capacity is 450 m³

Fire fighting RISER

Medical gases system:

Medical gases RISER

equipments selection Boiler: It is selected from De Dietrich Company Boiler load = 1220 KW Boiler Model No. :GT530 DIEMATIC-m3 Chiller: It is selected from Petra Company Chiller load = 413.5 Ton Chiller Model No. :W P S a 435 2S

Supply fan : It is selected from Greenheck Company There is three supply fan are selected depend on flow rate and static pressure And this supply fan no.1 Supply Fan Model No. : RSF-200 Exhaust fan : It is selected from Petra Company There is nine exhaust fan are selected depend on flow rate and static pressure And this exhaust fan no.1 Exhaust Fan Model No. : P-EX-T-640

Air Hander Unit(AHU): It is selected from Petra Company In this project there is three (AHU) are selected for theaters. This (AHU) model no. that supply theater 1 & 2 (AHU) Model No. : PAH H C 40 C 5 H 4 X 5 Fan Coil Unit(FCU): It Is Selected From Petra Company In each room there is Fancoil that’s Compatible with its needs Chimney: Chimney is designed to exhaust gases from boiler and its diameter is 50 cm

Pumps: Chilled pump: The pump is selected from Sealed Motor Construction (SMC) depending on the total flow rate Pump Model No. : SMC680-15 Hot water pump: Flow rate = 1.35 L/S Pump model: SMC270-5.5 Cold water pump: Flow rate = 2.31 L/S

summary *All steps of design and plans of HVAC system are done. *All steps of design and plans of plumping system are done. *we select a suitable equipment for the system which satisfied the required conditions.

Thank you for your attention Any question??