SuperB Experimental Hall

Slides:



Advertisements
Similar presentations
S UPER B SITE ISSUES S. Tomassini, INFN-LNF On behalf of SuperB Collaboration Mini MAC, Frascati, July 17 th.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Replies by N.Meyners (in green) 27 August 2007ILC Questions M. Breidenbach1 ILC Detector Strategy Questions Some of us have been wondering about the fundamental.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
1 GLD Surface Assembly Y. Sugimoto KEK
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
Access Yard Assembly Marco Oriunno (SLAC), November 13, 2013 LCWS13, TOKYO.
Thomas Jefferson National Accelerator Facility SensL 6-Oct CHL-2 12 GeV CEBAF Upgrade magnets and power supplies Two 1.1GV linacs Enhanced capabilities.
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
1 LHCf RE - INSTALLATION – TS4 Operation Time (min) Required Personnel Position Individual Dose (  Sv) Collective Dose (  Sv) -2 Bring downstairs the.
1 Building Design Progress Dan Wilcox March 2012.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
HLS Installation at KEKB Main Ring after the Great East Japan Earthquake Takashi Kawamoto, Mika Masuzawa, Ryuhei Sugahara High Energy Accelerator Research.
S UPER B SITE OVERVIEW S. Tomassini, INFN-LNF On behalf of SuperB Collaboration.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
1 Target Station Design Dan Wilcox February 2012.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Experimental Hall in Mountain Regions
FCC Underground Infrastructure
SUPERB SITE OVERVIEW C. Sanelli, F. Sgamma, S. Tomassini, INFN-LNF
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Civil Engineering Update
Updated Design of Detector Hall
CLIC Civil Engineering Update
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Acknowledgements to all FCC study teams
Experimental hall design in Japanese site
INSTALLATION SEQUENCE
(Potential) Site and Utilities
Update of experimental hall in Japanese mountain site
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
ILC DRAFT CONSTRUCTION SCHEDULE Flat topography & Mountainous sites
CLIC Civil Engineering Update
Integration and IR Hall
Detector hall in mountain regions
Extract from today’s talk given to DCB
8-10 April 2014 CFS-ADI Joint Meeting
Overview of Day One – 29 Feb 2016
Similar Right Triangles
Roof design Bunker Project CDR
Presentation transcript:

SuperB Experimental Hall F.Forti

Babar - OUT

Babar - IN

SuperB Hall concept Same concept as Babar Space is important In and Out position, with shielding wall Assemble the detector while in the out position In parallel commission the machine without detector Move on the beam when ready Space is important IR2 too small (about 14m x 20m behind the wall), need to enlarge But, underground halls do cost money Need to find the right compromise First round of ideas shown here, no real study Drawings made by P.Popolizio and A.Paoli (Pisa/EGO) Installation and assembly needs to be carefully studied No truck access to the hall, need to lower everything with crane.

SuperB Top View Electronics House

SuperB Side View Shaft Electronics

SuperB Front view Electronics

Cranes SuperB Hall – 3D Shaft Beam tunnel

TALK BY S.TOMASSINI SPARX 1st stage SuperB LINAC SPARX future

Torvergata Area - Section S.1 - S.5 Geological Analysis Torvergata Area - Section S.1 - S.5 Formed by the Colli Albani volcano more than 600000 years ago Very Stable No important seismic activity S.1 S.2 S.3 S.4 S.5 Soil Sea Level Altitude (m) Brown Pyroclastic Rock Gray Pyroclastic Rock Preliminary

Seismic map http://zonesismiche.mi.ingv.it/documenti/mappa_opcm3519.pdf Thanks to Concezio for pointing it out. Maximum ground acceleration, with a 10% probability of exceeding it in 50 years.

La Biodola Rome