Railway Mobile Communication System Future Dan Mandoc,

Slides:



Advertisements
Similar presentations
17/1/2008 NRMM WG GRPE1 NRMM GTR Draft Technical procedure (chapters 7-9) As informal document to GRPE GRPE working group on the emissions from Non- Road.
Advertisements

Vehicle-infrastructure integration: creating co-operative mobility systems and services Hearing EU Parliament, 22 January 2009 Hermann Meyer, CEO.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
UIC ERTMS Conference, Istanbul Apr 2014 Evolution of the Railways Communication System Developments on the Succession of GSM-R Piero Petruccioli.
CEN/TC 278 ITS standardization
SPECTRUM REGULATION IN EUROPE, ECC ACTIVITIES RELEVANT FOR UTILITIES Bruno ESPINOSA, ECO
ITU-T Forum Geneva, 13 October 2014 Monica Ibido,
DOCUMENT #:GSC15-PLEN-53 FOR:Presentation SOURCE:ETSI AGENDA ITEM:PLEN 6.11 CONTACT(S):Emmanuel Darmois, Board Member Marylin Arndt, TC M2M chair Smart.
#UIC ERTMS World Conference 1. – 3. April 2014, Istanbul UIC Rail System Department UIC ERTMS World Conference Dirk Schattschneider UIC Frequency Manager.
1 BRUSSELS - 14 July 2003 Full Security Support in a heterogeneous mobile GRID testbed for wireless extensions to the.
UIC ERTMS World Conference ERTMS Baselines Pio GUIDO, Head of ERTMS Unit Istanbul, 2 April 2014.
Third Generation Developments RADIOCOMMUNICATIONS AGENCY A presentation for the Mobile Services Committee RA2/PTN Radiocommunications Agency.
CEPT/ECC-ETSI Co-operation Process
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Update on ETSI Security work Charles Brookson OCG Security Chairman DOCUMENT #:GSC13-PLEN-57 FOR:Information SOURCE:Charles Brookson AGENDA ITEM:6.3
Networks ∙ Services ∙ People Thomas Bärecke Journée Fédération, Paris Collaboration européenne GÉANT SA5 03/07/2015 SA5 T5 team
17/1/2008 NRMM WG GRPE1 NRMM GTR Draft Technical procedure (chapters 7-9) As informal document to GRPE GRPE working group on the emissions from Non- Road.
ETSI TC ITS Status on Standardization Martin ARNDT ETSI ESP © ETSI All rights reserved M2M Market and Technology Opportunities
O2 “eSafety” – status report Risto Kulmala Leiden 2 February 2007.
ETSI TCCE WG4 work G. Marque-Pucheu (Airbus / ETSI TCCE WG4) 26-27/08/ 2014.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
7 October 2015 NCP Training EU-Japan Joint Call EUJ1 – 2016: 5G – Next Generation Communication Networks.
5G in the Railway Domain DB Systemtechnik GmbH | Dirk Schattschneider | I.IVP24(5) | Mainz |
1210 MHz of harmonised spectrum (ECC framework)
.
EBU FORECAST November 2016 Spectrum for 5G
ETSI–3GPP NGN ACTIVITIES
ETSI–3GPP NGN ACTIVITIES
Spectrum demand estimation
Reconfigurable Radio Systems Activities in ETSI
Reflection Of The NJFA In The ERC Report 25 (ECA Table) And Relation To EFIS And To The RSPP Inventory CEPT/ECC Civil/Military Meeting, November.
Bruno Chatras, ETSI TC TISPAN Vice-Chairman
A New Era in Critical Communications
Activities in CEPT-ECC potentially relevant for UIC
CEPT/ECC-ETSI Co-operation Process
Presentation TITLE Phil Kidner CEO TCCA
ERA CCRCC 2017 Michael Klöcker Session II
Session II: System authority for ERTMS 4RP Trackside approval
GROUP 3 OUTPUT OBJECTIVES 1 and 3
Introduction to ECC PT1 February 2011.
Shift2Rail, innovating ERTMS Control Command and Railway Communication Conference 16 November 2017, Valenciennes Giorgio Travaini, Head of Research &
15-16 November 2017 Valenciennes, Cité des Congrès
Thomas Weilacher Chairman ECC Working Group FM
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
ETSI Standardization Activities on M2M communications
The ERA EVORA Program Evolution of railway radio communication
Next Generation Communication System
CEPT/ECC Activities on ITS
Broadband PPDR frequency situation in Europe
.
HIS Smart Grid – Summary (1)
Radio spectrum for future railway applications
Standardization activities on IPTV in CCSA
Liaison statement and Request for Specification and Implementation of Harmonised Pan-European Emission Limits relevant for the GSM-R Operating Range.
European 5G regulatory developments
Intelligent Transport Systems
Presenter: Rainer Muench, Chairman TC TISPAN
EU-US-JP ITS Steering Group Annual Meeting 2018
Smart Grids activities in ETSI
CYRAIL Final Conference ERA on cybersecurity
Mark Epstein Senior Vice President Qualcomm
ETSI Technical Committee TCCE
ETSI Standardization Activities on Smart Grids
Relevant Activities in CEPT-ECC
Relevant Activities in CEPT-ECC
IEEE MEDIA INDEPENDENT HANDOVER
ETSI–3GPP NGN ACTIVITIES
ECO Frequency Information System (EFIS) Update
ESDEN - modernisation of data exchange in the ESS
3gpp-liaison-report-may-2005
Presentation transcript:

Railway Mobile Communication System Future Dan Mandoc, FRMCS Project Manager

UIC Future Railways Mobile Communications Systems Project UIC FRMCS Project was formally initiated by UIC in 2014, after 4 years of previous activities in this field. Project Scope: Provide overall technical conditions for the successor of GSM-R Three main work directions to provide the baseline platform for the system definition and delivery: User Requirements System architecture, interfacing with track side and onboard equipment Frequency Spectrum Provide an appropriate replacement to EIRENE FRS: -Based on User Requirements -Investigate current usage of GSM-R; delete functionalities if unused -Investigate future needs and add potential new functionalities functionalities. Investigate and perform studies for further improvement or opportunities related to: Sharing infrastructure, spectrum or other resources Usage of commercial non-specific user applications and equipment; Application layer. Migration Strategy: Migration spectrum needs Network model Technical conditions for interoperability – interoperability with GSM-R Flexible FRMCS implementation plans CCRCC 2017 - Valenciennes

FRMCS project organisation Steering Committee (reporting to UIC HQ and ERIG), 3 WGs. UIC Group for Frequency Aspects (UGFA) Spectrum: Spectrum analysis, needs, strategy Interface ECC / WG FM, Traffic Analysis Support for ETSI SR Doc WG Functionalities Functionalities: User Requirements Use Cases Support ETSI SR Doc Use Cases for 3GPP SA1 FRS first draft WG Architecture & Technology Architecture and Technology: Technology survey On board and Track Side Architecture Security Interfaced with the UIC Platforms and Forums, ERIG, ERA, ETSI TC RT, 3GPP, stakeholders and partners. CCRCC 2017 - Valenciennes

FRMCS Challenges ETCS Bearer Independence Future Proof Cyber Security Frequencies Operational Procedures Equipment Cost Effective Application QoS CCRCC 2017 - Valenciennes 4

Ongoing UIC FRMCS Activities: Future Railways Mobile Communications Systems Ongoing UIC FRMCS Activities: Maintain Users Requirements Specification (URS) Deliver Use Cases to 3GPP SA1 through ETSI TC-RT for R15/16, ensure permanent contact with 3GPP through TC RT Deliver Functional Requirements Specification Define a FRMCS system architecture model that offers flexibility Deliver System Requirements Specification Investigate Development & Test Approach for the Application layer Technical Migration Strategy Analyse requirements for frequency band, including during migration Approach ECC (together with ETSI and ERA) for frequency allocation, active involvement with FM56 Coordinated with stakeholders and partners 5 CCRCC 2017 - Valenciennes

FRMCS Plan On A Page 2016 2017 2018 2019 2020 2021-2022 Architecture Concept FRMCS SRDoc Spectrum Conclusions FM 56 Use Cases UIC URS v2.0 3GPP Release 15 – FRMCS Part 1 Use Cases 59(59) PoC Study Item adopted by 3GPP SA1#74 3GPP Release 16 – FRMCS Part 2 URS v3.0 Testing, PoC, Trial FRMCS FRS - First published version Testing Strategy System Functions Requirement Specifications FM 56, Frequency activities EU harmonisation, inclusion in 3GPP standards ERA informs the EC on FRMCS system definition Roaming & Sharing Options / Migration Concept Business Case Applications Development & Testing UIC/ETSI TC RT/3GPP Standardization Work; EUAR Legislative work , Changes in TSI CCRCC 2017 - Valenciennes

Thank You for Your Attention Questions? MADE IN EUROPE FOR GLOBAL USE CCRCC 2017 - Valenciennes