Lucio Rossi Project Leader

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
F. Savary. FSY - ColUSM #51 – Outline Mandate of the review panel Composition of review panel Programme Main outcomes/recommendations Actions.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
HL-LHC/LARP: International Review of the Inner Triplet Quadrupole (MQXF) Design Executive Committee Report International Review Committee held at CERN.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
Review-LHC Interaction Regions - Upgrade Phase I Amalia Ballarino, 31 st July 2008 Cold Powering Options Conceptual Design Review of the LHC Interaction.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Logo area Preparation meeting for the International Review of the Inner Triplet Quadruples (MQXF) for HL-LHC P Ferracin, J.Ph. Tock, E Todesco
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
Closing Session Report
R. van Weelderen and U. Wagner CERN
First LHC Splice Review Introduction
News and Introduction from CERN June 15th, 2005
Task 5: High-Tc superconducting link Summary of work-package
Cold mass design, assembly plans and QA/QC at CERN
HL-LHC IT STRING and Series test of SC link
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Equipment simplified model SMR UR safety
LHC Enhanced Quench Protection System Review
CSP 25th November 2010 Technical agreement number 3: overview
East Hall under construction
Minimum Hardware Commissioning – Disclaimer
The HL-LHC Circuits: Global View and Open Questions
Circuits description and requirements
Document Plan & Milestones WP7
SPS cryogenic proximity equipment and SM18 validation
BDS Cryogenic System RDR Status and EDR Plans
12 October 2009 RRB Plenary R.-D. Heuer
Cryogenics for sc links, a short update
e-lens Readiness Review Introduction
Hollow e- lens, Cryogenic aspects
Renovation of the 45-year old PS magnets
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
The HL-LHC project: info day for industry
Circuits description and requirements - Closed Session-
TASK 5.4 MAGNET conceptual DESIGn (preliminary) organization structure
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Detailed global view on protection and detection of the circuits
Superconducting Links and Cold Powering components for HL-LHC
TEST PLANS for HL LHC IT STRING
Experimental equipment Edgar L. Black February 17, 2019
LHC External Collimation Review
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Lucio Rossi Project Leader International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets Welcome and Review charge Lucio Rossi Project Leader SC LINK International Review, CERN 3 August 2017

Mandate and charges - 1 The High Luminosity LHC (HL-LHC) project has been approved by the CERN Council in the June 2016 session, with a financing profile covering till end of installation in 2026. For the first time the powering system is based on high current long (>100 m) superconducting lines (called Superconducting Links) employing superconductor operating in He gas, well above the usual LHe or HEII temperatures. The HL-LHC cold powering (WP6A in the Project Breakdown) is a complex system that has to enable transferring about 100 kA into the superconducting magnets of the upgraded LHC insertion magnets. The system is now in an advanced phase of design; MgB2 SC links basic concept have been demonstrated about two years ago in a 20 kA - 20 m long demonstrators, while a long prototype (>60 m) of final size and current is under constructions. Other features of the system, like joint box, cold distribution box, etc. are being designed or under validation or in conceptual phase. L. Rossi- SC Link review, 3-4 Aug 2017

Mandate and charges - 2 Since the early design phase, end 2010, we decided to explore the MgB2 (with an eye on HTS!) potential for the links, that at beginning were 300 m long, 100 m high, and 150 kA capability, to benefit of the large temperature margin and to make a completely different (from LHC) Cold Powering system, with no liquid in the CL box and removing CL box (DFBs) from LHC tunnel. (there was also a 600 m long horizontal link, rated for 25 kA, for P7, for which was foreseen in 2013-14 one prototype: the cancellation of that link in 2015 has required that the prototype was redirected toward the big IT link) With the double decker solution adapted in 2015, the link became shorter (100 m) and with a reduced level gap (15 m). Then, following various circuit reduction the current is reduced to 100 kA. SC links L. Rossi- SC Link review, 3-4 Aug 2017

Mandate and charges - 2 In addition, also due to various changes in the general powering scheme, some of them rather recent, the design and optimization of the full system still requires some time. The system must be fully designed and validated within 2018 to allow launching production of components for the final production in 2019 and 2020. The design must also live with the constraints given by the already defined technical infrastructure and integration, which at this stage cannot be changed. A test of a full, prototype system in the Inner Triplet String is foreseen in 2021-23, and installation in LHC P1 and P5 is foreseen in 2024 and early 2025. The present review has been called to examine the preliminary design, the main choices, to assess the presence of possible show-stoppers and to see if interfaces between WP3 (Magnets) and WP6B (warm powering), as well as Cryogenics and Circuit protection, are well defined. The review will cover both technical aspects and general integration, as well as the global planning. L. Rossi- SC Link review, 3-4 Aug 2017

Review Panel Members of the Review Panel: Akira Yamamoto (KEK-CERN, Chair) Maciej Chorowski (WUT) Chen-yu Gung (ITER) Joe Minervini (MIT) Davide Tommasini (CERN) Pierre Vedrine (CEA) It is important to note the good overlap between this review panel and ones of the Circuit Reviews (International review last year, and an Internal review in March 2017), as well as with the Magnet Reviews. L. Rossi- SC Link review, 3-4 Aug 2017

Questions to be answered (1/2) Is the technical scope of the Cold Powering System well defined and interfaces with adjacent equipment well clarified, also regarding installation? And in particular is the design and validation of the components closely linked to the cold powering (for example: bus bars, quench detection and protection, warm powering, etc.) sufficiently defined to allow finalization of the design of the Cold Powering System? Is the general design correct and adequate to meet the scope? Is the design safe also with respect to the boundary conditions given by the magnets and circuit protection system? Is the basic design of each components or subsystem adequate to the scope with reasonable margins? For the items still under definition, is the plan to finalize the design sound? L. Rossi- SC Link review, 3-4 Aug 2017

Questions to be answered (2/2) Is the plan to complete the design, to develop demonstrators for each critical item (for example splices among different materials, cabling of many large conductors, handling of the heavy and long SC links, e.m. coupling inter-circuit at acceptable level, etc.) properly done and sound? Are any critical design and technological developments that are still missing or in severe delay ? Is the test plan including the IT String test adequate (without too many details at this early stage)? Are there issues that have been neglected or underestimated? L. Rossi- SC Link review, 3-4 Aug 2017

Various While the cost and resources are not in the scope of the review (they have been reviewed by an international panel in HL-LHC C&S reviews on March 2015 and October 2016), the reviewers may comment on the level of resources allocated to design , prototyping and validations, as well as on the schedule. (for your info next C&SR3 is on March 2018) The review panel reports to the HL-LHC Project Leader and the panel chair is required to deliver a written report within one month after the review. L. Rossi- SC Link review, 3-4 Aug 2017

Practical details https://indico.cern.ch/event/643197/timetable/#20170703 Monday 3.07 : [30-7-18] 9:00 - 12:30 : Presentations 10:45 – 11:15 : Coffee break with group picture 12:30 - 14:00 : Lunch 14:00 - 18:15 : Presentations Tuesday 4.07 : 8:30 – 10:00 : Visit to 927 and SM18 (on invitation only) 10:00 – 12:00 : Answers to questions [30-6-19] 14:00 - 17:00 : Closed session and answers to questions [30-7-18] 17:00 Close out [30-7-18] L. Rossi- SC Link review, 3-4 Aug 2017

Wish you a productive review Thanks to JP Tock for coordinating the review and to Celine for the secretariat & logistics support L. Rossi- SC Link review, 3-4 Aug 2017