Feasibilty/Concept Study Mid Term Status Review

Slides:



Advertisements
Similar presentations
TMT.OPT.PRE DRF011 Thirty Meter Telescope Secondary and Tertiary Mirror Systems International Symposium on Photoelectronic Detection and Imaging.
Advertisements

CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Rodger Farley p1 Super Nova/Acceleration Probe 16 November 2001 Mechanical Mechanical Overview Rodger Farley Mick Correia Judy Brannen 16 November 2001.
Precision Engineering used in EUVL 03/18/2003 ME250 Prof. Furman By:  Udayasri Jandhyala  Kanchan Joshi.
Ceramic Focal Plane Components For SNAP B. C
M2 Assembly and Feed Optics Ron Price August 25, 2003.
FLAO Alignment Procedures G. Brusa, S. Esposito FLAO system external review, Florence, 30/31 March 2009.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Earth Atmosphere.
Cornell Caltech Atacama Telescope Project Status Simon Radford 2005 October 10.
A Preliminary Design of the Rotator for the DES Simulator Stand February 28, 2008 Edward Chi Fermilab/PPD/MD.
Oct 17, 2001SALT PFIS PDR - Structure1 Structure Interface/ constraints Loads Structure design rationale Truss Weight and CG Finite Element Analysis/ Image.
Space Frame Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 11/04/04.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
Team HazardHawk Team HazardHawk 2008 April 24, 2008.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Determinate Space Frame Telescope Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 7/28/04.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Design of a Hexapod for the Phased Experimental Demonstrator MSc Mechatronic Engineering Mr. Frank Janse van Vuuren Stellenbosch University Supervisor:
SAM PDR1 S OAR Adaptive Module LGS LGSsystem Andrei Tokovinin SAM LGS Preliminary Design Review September 2007, La Serena.
Design of a Lightweight Mounted Tip/Tilt Mirror
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Design and Implementation of a Fast-Steering Secondary Mirror System Maryfe Culiat Trex Enterprises July 25, 2007.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
Henry Heetderks Space Sciences Laboratory, UCB
Engineering Division 1 M321/M331 Mirror Switchyard Design Review Tom Miller
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y Fourier-Kelvin.
The Adaptive Mirror for the E-ELT
Wind Lidar Working Group, 29 June 2005 Welches, OR Doppler Lidar Scanning Telescope Technology Geary Schwemmer Meeting of the Working Group on Space-based.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
14FEB2005/KWCAE2-UsersGroup Astro-E2 X-Ray Telescopes XRT Setup & Structure Performance Characteristics –Effective Area –Angular Resolution –Optical Axes.
Lightweight mirror technology using a thin facesheet with active rigid support J. H. Burge, J. R. P. Angel, B. Cuerden, H. Martin, S. Miller University.
Repeatability and control in nanoimprint lithography Sarah Felix 4/14/08 EE C235 - Nanoscale Fabrication.
Telescope Phasing Slides Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Apr 29, 2003SSWG - CDR Comments1 PFIS Critical Design Review Comments Detailed response available in document SALT- 3100BP0011 (PFIS web site) Responses.
JWST ISIM Primary Structure and Kinematic Mount Configuration Jonathan Kuhn, Tim Carnahan NASA/GSFC Code 542 Andrew Bartoszyk, Steve Hendricks, Charles.
3 rd March 2006EUS Consortium meeting EUS Instrument Overview Eric Sawyer RAL.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review Telescope Mount Concept Vertex RSI.
Zhanshan Wang, Zhenxiang Shen, Qiushi Huang, ZhongZhang, Bin Ma Institute of Precision Optics and Engineering (IPOE), Tongji University Institute of Precision.
Tip/tilt options Trade Study Report on Stand-alone T/T vs. DM on T/T Stage (WBS ) Brian Bauman December 12, 2006.
Cornell Caltech Atacama Telescope (CCAT) Status & Technical Exchange Meeting 16 March 2005.
Smart co-phasing system for segmented mirror telescopes SPIE: Juan F Simar* a, Yvan Stockman a, Jean Surdej b a Centre Spatial de Liège, LIEGE.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review CCAT Enclosure Nathan Loewen AMEC Dynamic Structures Ltd. 13 July 2005.
CCAT Primary Mirror Panel Study
David Woody Caltech Owens Valley Radio Observatory
Internal CDR meeting December 20th, 2005
Electronics and Controls
By: Udayasri Jandhyala Kanchan Joshi 03/18/2003 ME250 Prof. Furman.
Primary Mirror (Reflector)
Feasibilty/Concept Study Mid Term Status Review
LARP Phase II Secondary Collimator RC1
Corrugated Mirror and Rapid Panel Manufacturing
Composite Mirror Applications, Inc
THIRTY METER TELESCOPE : SSA
LARP Phase II Secondary Collimator RC1
Integration & Commissioning
From: Nonlinear Passive Cam-Based Springs for Powered Ankle Prostheses
Session 5b Dr. Dan C. Surber, ESEP
Design of the He and HB ODU
The Superattenuator upgrades and the SAFE Project
iSHELL Design Review Cryostat & Optics Bench
Henry Heetderks Space Sciences Laboratory, UCB
LARP Rotatable Collimators for LHC Phase II Collimation
Optics Alan Title, HMI-LMSAL Lead,
Presentation transcript:

Feasibilty/Concept Study Mid Term Status Review M2 & M3 T.A. Sebring 13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review

M2 and M3 Are Too Large To Make Monolithic Make in Segments Dimensions Approximate PM Segments Can Use Same Panel & Process Bond Together? SiC Brazed by Boostec (FR) for Herschel Telescope @~3.5m Epoxy Bonding for CFRP Expensive…Risky? Metrology? Mount as Segments? Require Stable Back Structure Increased Mass & Complexity Active or Passive? 1.6m 2.26m 3.2m 1.3m 1.9m 2.6m

Feasibilty/Concept Study Mid Term Status Review M2 is 3.2 meters in diameter Formed from 4 panels @ 10kg/m2 Panels Maintain Figure over Full Gravity Range Mounted on 3 Points Manufacturing Process Identical to Primary Mirror Panels 13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review

Notional Panel Mounting Locations Anticipate Bipod Flexures at Each Point Panels Will Have Mounting Features

First Layer of Support Truss CFRP with Bonded Invar or CFRP Joints

Upper Support Truss Interface to M2 Positioning Hexapod Superimposed on First Truss Layer

Notional Illustration of Truss Top View

Side View Shows Truss Top Layer, Bottom Layer, Notional Struts Red Boxes are Voicecoil Actuators with Internal Position Sensors

Mirror Mounts to Nutator Assembly M2 Support Nutator Assembly Mirror Mounts to Nutator Assembly Rigid Body Positioning of M2/Nutator Assembly Via Hexapod Entire Assembly Weighs ~ 270 kg 80 kg Mirror, 40 kg Truss, 100 kg Nutator, 50 kg Hexapod

M2/M3 Mechanisms M2 Nutator M2 Hexapod S. Radford Designed Nutator for ALMA Probably Scaleable to Some Performance Level Increases Mass at M2 M2 Hexapod ALMA Hexapod Custom Designed/Built by Polytec PI Polytec PI Will Provide Concept Design and Cost for CCAT

M3 Fabrication May Be Possible to Manufacture as Monolith Plano Figure Implies That Any Flat > 2.6 m in Diameter Could Serve as Mandrel GrEp Mirror Formed on Mandrel Seems Acceptable Flexure Mounting to Rotation Turret Had Considered Fast Tip/Tilt Mount for M3 If Mount Has Unacceptable Residual Jitter Use High Bandwidth Guider for Input Large Aperture Should Average Atmospheric Effects in IR Inertial Sensors Possible but Expensive to Sufficient Resolution Resolution: Don’t Do It Unless Necessary

M3 Rotator & Tip/Tilt? SOAR M3 Turret Tip/Tilt 0.18 arc sec repeatability DC Torque Motor Large Instrument Bearings Inductosyn Encoder Should Be Scaleable Requires Attention to Detail Tip/Tilt Not Currently Part of Baseline Will Be Expensive and Difficult Need to Characterize Requirements Complex and Challenging System

Remaining Work for This Phase Find Possible Vendors Develop Baseline Cost Estimate Assess Maturity of Constituent Technologies Investigate Approach to Calibration Alignment of M2/M3 Segments CMM Setup Use of Telescope Calibration WFS Identify Critical Risk Elements and Associated Approaches to Mitigation