VIRTIS Operations at Lutetia

Slides:



Advertisements
Similar presentations
CHRIS (Compact High Resolution Imaging Spectrometer) sira group sira electro-optics Dr Mike Cutter EO & Technology Business Manager.
Advertisements

Asteroid’s Thermal Models AS3141 Benda Kecil dalam Tata Surya Prodi Astronomi 2007/2008 Budi Dermawan.
A U R A Satellite Mission T E S
Remote sensing in meteorology
Minor bodies observation from Earth and space: asteroid (2867)Steins A. Coradini, M.T. Capria, F. Capaccioni, and the VIRTIS International Team.
Microwindow Selection for the MIPAS Reduced Resolution Mode INTRODUCTION Microwindows are the small subsets of the complete MIPAS spectrum which are used.
2008/10/21 J. Fontenla, M Haberreiter LASP – Univ. of Colorado NADIR MURI Focus Area.
5 th SECCHI Tam Meeting.1 COR2 Status Angelos Vourlidas.
Page 1 1 of 20, EGU General Assembly, Apr 21, 2009 Vijay Natraj (Caltech), Hartmut Bösch (University of Leicester), Rob Spurr (RT Solutions), Yuk Yung.
Lunar Observations of Changes in the Earth’s Albedo (LOCEA) Alexander Ruzmaikin Jet Propulsion Laboratory, California Institute of Technology in collaboration.
Hyperspectral Satellite Imaging Planning a Mission Victor Gardner University of Maryland 2007 AIAA Region 1 Mid-Atlantic Student Conference National Institute.
Rachel Klima (on behalf of the MASCS team) JHU/APL MASCS/VIRS Data Users’ Workshop LPSC 2014, The Woodlands, TX March 17,2014 MASCS Instrument & VIRS Calibration.
Satellites and Sensors
October 29-30, 2001MEIDEX - Crew Tutorial - Calibration F - 1 MEIDEX – Crew Tutorial Calibration of IMC-201 Adam D. Devir, MEIDEX Payload Manager.
Remote Sensing and Image Processing: 7 Dr. Hassan J. Eghbali.
1 An Observatory for Ocean, Climate and Environment SAC-D/Aquarius HSC - Radiometric Calibration H Raimondo M Marenchino 7th SAC-D Aquarius Science Meeting.
Recent Solar Irradiance Data From SBUV/2 and OMI Matthew DeLand and Sergey Marchenko Science Systems and Applications, Inc. (SSAI) SOLID WP-2 Workshop.
Cassini UVIS Measurements of Hydrogen Exospheres at the Icy Saturnian Satellites Amanda Hendrix Candy Hansen (with input from Charles Barth, Wayne Pryor,
Rev 131 Enceladus’ Plume Solar Occultation LW Esposito and UVIS Team 14 June 2010.
OMI Meeting KNMI June 2006 OMI groundpixels Bert van den Oord.
Surface Characterization 4th Annual Workshop on Hyperspectral Meteorological Science of UW MURI And Beyond Donovan Steutel Paul G. Lucey University of.
Cassini Huygens EECS 823 DIVYA CHALLA.
OSIRIS operation summary
VIRTIS activities during Global Mapping and Close Observation Phases
The Lodore Falls Hotel, Borrowdale
NIRSpec Time Series Observations
Simulated GOLD Observations of Atmospheric Waves
Planning Flare Observations for Hinode/EIS
TEMPO Instrument Update
Asteroid 4 Vesta observed from OSIRIS-ROSETTA
VIRTIS STATUS REPORT The VIRTIS Team
A TARGET OF THE ROSETTA MISSION
Deeper insight in the Steins flyby geometry:
VIRTIS flyby of Steins M-IR Spectral analysis
Investigation of different flyby geometries for asteroid Steins - Surface area, stereo and phase angle coverage Sofie Spjuth Max-Planck-Institut für Sonnensystemforschung.
Lutetia geometry and timeline
Oil immersion objectives
Summary of the science planned per mission phase
Lunar observation data set preparation
Single Object & Time Series Spectroscopy with JWST NIRCam
Deep Convective Clouds (DCC) BRDF Characterization Using PARASOL Bidirectional Observations Bertrand Fougnie CNES.
Fangfang Yu and Xiangqian Wu
JWST NIRCam Time Series Observations
TEMPO Instrument Update
Verifying the DCC methodology calibration transfer
An Overview of MODIS Reflective Solar Bands Calibration and Performance Jack Xiong NASA / GSFC GRWG Web Meeting on Reference Instruments and Their Traceability.
MODIS Lunar Calibration Data Preparation and Results for GIRO Testing
OMEGA DATA CUBE ORBNNNN_M.QUB
Akatsuki Mission Update: New Images and Status of the Mission
GOES-R Hyperspectral Environmental Suite (HES) Requirements
Instrument Characterization: Status
Toru Kouyama Supported by SELENE/SP Team HISUI calibration WG
Data Preparation for ASTER
Lunar reflectance model based on SELENE/SP data
Changchun Institute of Optics Fine Mechanics and Physics
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Saturn Ring Results from the Cassini Composite Infrared Spectrometer
S-NPP Visible Infrared Imaging Radiometer Suite (VIIRS) Lunar Calibration using GSICS Implementation of the ROLO model (GIRO) for Reflective Solar Bands.
Launch and On-orbit Checkout
National Satellite Meteorological Centre
Lunar Observation Data for GIRO Landsat–8 Operational Land Imager
GOES -12 Imager April 4, 2002 GOES-12 Imager - pre-launch info - radiances - products Timothy J. Schmit et al.
Presentation Overview
Lunar Observation Activities with a Small Satellite and a Planetary Exploration Satellite. Hodoyoshi-1 Hayabusa-2 Toru Kouyama, AIST
Deep Convective Clouds (DCC) BRDF Characterization Using PARASOL Bidirectional Observations Bertrand Fougnie CNES.
Early calibration results of FY-4A/GIIRS during in-orbit testing
Preliminary SCIAMACHY Lunar observations as intercalibration source
Strawman Plan for Inter-Calibration of Solar Channels
Geographic Features in Satellite Imagery
Remote sensing in meteorology
Presentation transcript:

VIRTIS Operations at Lutetia VIRTIS Team VIRTIS Science Team Meeting Paris 10-12 May 2010

VIRTIS Observations Summary Summary of the required observations: Light Curve; this is performed during the approach phase up to about 1hour before closest approach. During this phase the angular size of the object varies from about 75rad up to 2000 rad. Only VIRTIS-M operates. Scanning Imaging; From CA -1800s to CA-500s relative speed between S/C and asteroid is low enough to allow hyperspectral imaging with VIRTIS-M with its internal scan mirror.. Pushbroom Imaging; at closer range the speed is too large to allow scanning; both V-M and V-H will be operated in pushbroom mode. A strategy similar to the Steins cooperative pointing (with ALICE and MIRO) can be adopted. After CA due to large phase and low night temperature, observations shall be limited to about 20min.

Timeline

General First Light curve: a S/C offset in the Y direction as been introduced to avoid the damaged region of the filter Second Light curve: during this LC we must consider the S/C flip performed between 11:34 and 12:14; this could imply some data loss. Additionally, due to the instability of the Reaction Wheel B of the S/C, there could be the possibility that the fly-by is carried out on 3 RW. If this is the case and if the S/C incur in an emergency safe condition then there will be a general restart of operations just after the S/C flip.

Extract from Mission Operation Report #134 april 2010

Pixel Size Vs time during the approach phase Stares 16 mrad off Nadir looking 16 mrad The Second Light Curve will continue until 14:42 (start of) Asteroid Fly By Mode

Composite spectrum of Lutetia As an input to calculate the expected signal from VIRTIS we have used a compilation of spectra taken from several authors: Rivkin et al., 2000 and Birlan et al, 2004 (other contribution from Lazzarin et al, 2002; Bell et al, 1998; Nedelcu et al 2008 are consistent with these ones) the observed reflectances have been scaled to an albedo of 0.20 @550nm, and resampled on the VIRTIS bands. In the region 3.5 to 5 micron a constant value has been adopted

Lutetia Radiance VIS Channel From the composite spectral reflectance shown before and the following parameters: Phase 10° Distance from Sun 2.71AU Target Diameter 100km We have calculated the radiance at the instrument in the VIS and IR channels Two extreme surface temperatures were taken into account IR Channel T = 170K IR Channel T = 220K

First Light Curve VIRTIS-M VIS Signal evaluation Signal at start of First LC (Lutetia sub-pixel (0.36)) Signal at end of First LC (Lutetia sub-pixel (0.58))

First Light Curve VIRTIS-M IR Signal evaluation T=200K Signal at start of First LC (Lutetia sub-pixel (0.36)) T=200K Signal at end of First LC (Lutetia sub-pixel (0.58))

Light Curve VIRTIS-M IR Signal evaluation as a function of T T=170K T=220K

First Light Curve: Operative Parameters 15 lines for each acquisition (+2dark) 5 s repetition >> 85s >> 340 punti 10 s repetition >> 170s >> 170 punti 20 s repetition >> 340s >> 85 punti Selected Lutetia rotates with angular speed of 0.0125 deg/s With 20s repetition we get one LC point every 4.25deg Compression wavelet 2; factor 8 Binning Mode Modo reduced slit: 3x1 Modo all pixel : 1x1 Selected Integration Times 4-5s VIS e 2s IR Verify Temperature increase of CCD due to the selected integration time

Parameters for ITL First Light Curve 20s repetition 15lines (start angle and stop angle need offset) Dark frequency one every 15 acquisitions Wavelet 2 compression Mode full window (1x1) 8 hours operations start 09 July 19:00 stop 10 July 03:00 DATA VOLUME  660Mbit = 82.5MBytes Integration times 4s for VIS and 2s for IR Every hour stop acquisition to limit size of cube: we shall get 8 cubes in total

Second Light Curve VIRTIS-M VIS Signal evaluation Signal at start of Second LC (Lutetia sub-pixel (0.75)) Signal at end of Second LC (Lutetia 4pixels)

Second Light Curve VIRTIS-M IR Signal evaluation T=220K Signal at start of Second LC (Lutetia sub-pixel (0.75)) T=220K Signal at end of Second LC (Lutetia 4pixel )

Second Light Curve: Operative Parameters 15 lines for each acquisition (+2dark) 5 s repetition >> 85s >> 340 punti 10 s repetition >> 170s >> 170 punti 20 s repetition >> 340s >> 85 punti Selected Compression wavelet 2; factor 8 Binning Mode Modo reduced slit: 3x1 Modo all pixel : 1x1 Selected Integration times 1.5s VIS e 1s IR

Parameters for ITL Second Light Curve 20s repetition 15lines (Alice Narrow Slit Boresight) Dark frequency one every 15 acquisitions Wavelet 2 compression Mode full window (1x1) 8h 33min operations: start 10 July 06:09 stop 10 July 14:42 DATA VOLUME  700Mbit = 87.5MBytes Integration times 1.5s for VIS and 1s for IR Every hour stop acquisition to limit size of cube: we shall get 8 cubes in total

Internal Scan – First part The reason for the scan rely on the absence of longitudal motion between 15:00 and 15:40, this suggest to use an internal scan to cover the full area of the asteroid. On the other hand as we approach the asteroid the pixel resolution increases; this imply that the maximum number of acquisition per scan shall be limited by the change in resolution. This should be less than about 15%. The S/C will point with the Cooperative Boresight (a Z offset that satisfy VIRTIS-H, MIRO and Alice requirements). VIRTIS-H will start operating from this point. In the first part from 15:15 to 15:30 we shall perform full surface scans.

Internal Scan – Second Part After 15:30 we shall not be able to image the full asteroid without introducing distortion in the resulting image, change of resolution from the first to the last acquisition of each scan. But the Longitude variation shall still be minimal until about 300s before CA. We have then introduced a second scan phase, limited to a portion of the asteroid surface, limited to a scan of 10lines This will have the additional advantage that we could properly sample the zero phase passage. This phase will last from 15:32 to about 15:43 (about 450s before CA)

Lutetia S/C footprint over surface

The sub S/C longitude doesn’t vary considerably until 300s before CA;

To keep the resolution variation across one image scan image less than 15% we split the scans in two parts From 2250 to 1250 seconds before CA: full surface scans From 1250 to 450 seconds before CA: limited surface scans

Parameters for ITL Internal Scan Phase First Part First 7 scans (continuous scan; produces a single cube) 5s repetition Integration times 1.5s for VIS and 1s for IR 20lines Dark frequency one every 20 acquisitions Wavelet 2 compression Total duration 750s Mode full window (1x1) DATA VOLUME each scan 70Mbit = 8.75MBytes Scan 8 and 9 30 lines Total duration 315s DATA VOLUME each scan 16Mbit = 2MBytes

Parameters for ITL Internal Scan Phase Second Part Scans 10 to 18 (continuous scan; produces a single cube) 5s repetition Integration times 1.5s for VIS and 1s for IR 10lines Dark frequency one every 20 acquisitions Wavelet 2 compression Total duration 475s Mode full window (1x1) DATA VOLUME each scan 45Mbit = 5.5MBytes VIRTIS-H will perform backup and nominal mode acquisitions during this time

Pushbroom Scan During this part of the sequence, VIRTIS-M will operate in pushbroom mode, relying only on the S/C motion over the surface. Both VIRTIS-M and H will operate. Between 450s and 150s there will be oversampling the instrument ground resolution being larger than the relative shift of the sub S/C point on ground. During the 300s around CA on the contrary the S/C motion shall be faster than the instrument resolution giving undersampling conditions (See next slides) This phase shall last from 15:45 until 16:00

CA Operations Ground Resolution and Surface track The S/C is at distance D from the asteroid, and its track moves of angles  and  in one repetition time over the asteriod surface; We assume Virtis Slit perpendicular to S/C ground track; Ground Resolution = D * IFOV S/C at t=0 S/C at t=5s S/C track surface projection

OVERSAMPLING Ground track shift over 5s Pixel Resolution At ±2min around CA there will be coverage gaps between subsequent acquisition, due to the combined S/C motion and repetition time

Phase angle variation during pushbroom phase

High Resolution VIRTIS-M VIS Signal evaluation VIS Channel

High Resolution VIRTIS-M IR Signal evaluation IR Channel T=170K IR Channel T = 220K

Thermal emission signal evaluation

Parameters for ITL Pushbroom Phase Continuous scan from 380s before CA until 520s after CA 5s repetition Integration times 1.5s for VIS and 1s for IR No scan mirror motion Dark frequency one every 20 acquisitions LossLess compression Total duration 900s Mode full window (1x1) DATA VOLUME each scan 330Mbit = 41MBytes