IE 342- Engineering Economic Analysis

Slides:



Advertisements
Similar presentations
Incremental Analysis Lecture No. 21 Professor C. S. Park
Advertisements

Engineering Economics Analysis Dr. Nabeel Yousef
Engineering Economic Decisions
L1: Engineering Economic Decisions
1 Engineering Economic Decisions Lecture No.1 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Engineering Economic Decisions
Introduction to Engineering Economic Anastasia Lidya M. 1.
Flash back before we compare mutually exclusive alternatives.
Contemporary Engineering Economics, 4 th edition, © 2007 Generalized Cash Flow Approach – Lease versus Buy Lecture No. 42 Chapter 10 Contemporary Engineering.
Chapter 3 - Interest and Equivalence Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Engineering Economic Decisions
(c) 2001 Contemporary Engineering Economics 1 Chapter 1 Engineering Economic Decisions Rational Decision-Making Process Economic Decisions Predicting Future.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 2000 Chapter Three Opportunity Cost of Capital and of Capital and Capital Budgeting.
1 Engineering Economic Decisions Lecture No.1 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Hawawini & VialletChapter 81 IDENTIFYING AND ESTIMATING A PROJECT’S CASH FLOWS.
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Opportunity Cost of Capital and Capital Budgeting
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Choice of MARR and Capital Budgeting.
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
Opportunity Cost of Capital and Capital Budgeting Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
(c) 2001 Contemporary Engineering Economics 1. “Engineering is the profession in which a knowledge of the mathematical and natural sciences gained by of.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
What is this course about?
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
1. 2 Engineering Economics (2+0) Fundamentals of Engineering Economics-2 And Time value of Money Instructor: Prof. Dr. Attaullah Shah Lecture # 2 Department.
1 Chapter 1. Engineering Economic Decisions. 2 Engineering Economics: Economic analysis for engineering and management decision making The term engineering.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Selection Analysis Method Course Outline 9.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks PRENTICE HALL ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Capital Budgeting.
Engineering Economic Analysis CHAPTER 1 1. What is Engineering Economy? Engineering economy involves the financial and economic evaluation of projects.
BUS 401 Week 3 Quiz Check this A+ tutorial guideline at NEW/BUS-401-Week-3-Quiz 1.) The appropriate cash flows.
Chapter 26 CAPITAL BUDGETING Chapter 26: Capital Budgeting.
INVESTMENT ANALYSIS OR CAPITAL BUDGETING
IE 342- Engineering Economic Analysis
Chapter 13 Financial performance measures for investment centres and reward systems.
IE 342- Engineering Economic Analysis
Inflation and Its Effects on Project Cash Flows
IE 342- Engineering Economic Analysis
What is this course about?
Capital Investment Evaluation of the Drill Purchase
Engineering Economic Decisions
Comparing Mutually Exclusive Alternatives
Lecture: 6 Course Code: MBF702
Planning for Capital Investments
Chapter 6 Principles of Capital Investment
Economic Equivalence Lecture No.5 Chapter 3
Net Present Value and Other Investment Criteria
Review for Midterm Dr.Sarina.
FINA1129 Corporate Financial Management
Chapter 7 Present Worth Analysis
ENGINEERING ECONOMIC DECISION CHAPTER 1
Other Long-Run Decisions
Engineering Economic Decisions
IE 342- Engineering Economic Analysis
Capital Budgeting Decisions
IE 342- Engineering Economic Analysis
Managerial Accounting 2002e
RATE OF RETURN ANALYSIS CHAPTER 7
What is this course about?
Chapter 1 Engineering Economic Decisions
IE 342- Engineering Economic Analysis
Information Systems and Engineering Economics : Syllabus
Special Saturday Session: Midterm Review Session
Capital Budgeting Techniques
AMIS 3300 Capital Budgeting.
IE 342- Engineering Economic Analysis
Presentation transcript:

IE 342- Engineering Economic Analysis 2017 – 2018 Fall Semester

IE 342 - Engineering Economic Analysis  Instructors   Dr. Emre Uzun (Sec 1) E-mail: emreu@bilkent.edu.tr Offıce: EA 328 Tel: x3484 Office Hours: By appointment via email Okan Dükkancı (Sec 2) E-mail: okan.dukkanci@bilkent.edu.tr Offıce: EA 324 Tel: x3483 Teaching Assistants Halit Metehan Dilaver Eren Özbay

Required Text Book: Park, C. S., Contemporary Engineering Economics, 6th Ed., Prentice Hall, 2016  

Web Site/Email: All announcements and course related material (e.g. Study sets, lecture notes) will be posted on the course web page. Students are responsible for all the announcements made in class, or via e-mail. It is the students’ responsibility to be aware of what has been covered in lectures, and to check the web page and e-mail accounts regularly and not miss any activity or information.

Course Description Concepts of time value of money. Analysis of engineering decisions Principles and methodology of comparing decision alternatives, such as various engineering designs, manufacturing equipment, or industrial projects. Effects of depreciation, inflation and taxation on economic decisions, cost benefit analysis of public projects. Dealing with uncertainty and risk; rational decision making when future outcomes are uncertain. Replacement analysis.

Grading Midterm I - 22 % Midterm II - 22 % Final Exam - 30 % 4 Quizzes - 20 % Class Participation - 6 % Total - 100% Study Sets (will not be graded)

Policies Attendance: FZ Grade Policy: There may be random attendances taken which will count towards your class participation grade. FZ Grade Policy: No FZ this semester!

Policies Classroom Policy: Makeup Policy: A make-up examination for the midterms will only be given under highly unusual circumstances (such as serious health or family problems). The student should contact the instructor as early as possible and provide the instructor with proper documentation (such as a medical note certified by Bilkent University’s Health Center).   There is no make-up for quizzes. Classroom Policy: No need to come to classroom if you are not in the mood for learning!

Tentative Course Outline: Ch.1: Engineering Economic Decisions Ch.3: Time Value of Money Ch.3: Economic Equivalence Ch.3: Interest Formulas - Single Cash Flows Ch.3: Interest Formulas – Equal Payment Series Ch.3: Interest Formulas – Gradient Series Ch.3: Unconventional Equivalence Calculations Ch.4: Nominal and Effective Interest Rates Ch.4: Equivalence Analysis using Effective Interest Rates Ch.4: Debt Management Ch.4: Investing in Financial Assets Ch.5: Payback Period Ch.5: Discounted Cash Flow Analysis

Ch.5: Variations of Present Worth Analysis Ch.5: Comparing Mutually Exclusive Alternatives Ch.6: Annual Equivalent Worth Criterion Ch.6: Applying Annual Worth Analysis Ch.7: Rate of Return Analysis Ch.7: Finding RoR Ch.7: Internal Rate of Return Criterion Ch.7: Incremental Analysis Ch.9: Asset Depreciation Ch.9: Depreciation Methods Ch.9: Corporate Income Taxes Ch.10: Developing Project Cash Flows Ch.11: Meaning and Measure of Inflation Ch.11: Equivalence Calculation under Inflation Ch.11: Effects of Inflation of Project Cash Flows

Ch.12: Project Risk Ch.12: Estimating Risk Ch.12: Decision Tree Analysis Ch.14: Replacement Analysis Fundamentals Ch.14: Replacement Decision Models Ch.15: Methods of Financing Ch.15: Cost of Capital Ch.15: Choice of MARR Ch.16: Benefit-Cost Ratio

Engineering Economic Decisions Lecture 1 Presentation based on the book Chan S. Park, Contemporary Engineering Economics Chapter 1, © Pearson Education International Edition

Getting a Car in the USA

Getting a Car in the USA

A Simple Illustrative Example: Car to Finance – Saturn or Honda? Recognize the decision problem Collect all needed (relevant) information Identify the set of feasible decision alternatives Define the key objectives and constraints Select the best possible and implementable decision alternative Need to lease a car Gather technical and financial data Select cars to consider Wanted: small cash outlay, safety, good performance, aesthetics,… Choice between Saturn and Honda (or others) Select a car (i.e., Honda, Saturn or another brand)

Large-Scale Engineering Projects These typically require a large sum of investment can be very risky take a long time to see the financial outcomes lead to revenue and cost streams that are difficult to predict All the above aspects (and some others not listed here) point towards the importance of EEA

Types of Strategic Engineering Economic Decisions in the Manufacturing Sector Service Improvement Equipment and Process Selection Equipment Replacement New Product and Product Expansion Cost reduction or profit maximization can be seen as generic (common, eventual) objectives In the most general sense, we have to make decisions under resource constraints, and in presence of uncertainty – not only in the EEA context

The Four Fundamental Principles of Engineering Economics 1: An instant dollar is worth more than a distant dollar… 2: Only the relative (pair-wise) difference among the considered alternatives counts… 3: Marginal revenue must exceed marginal cost, in order to carry out a profitable increase of operations 4: Additional risk is not taken without an expected additional return of suitable magnitude

Principle 1 An instant dollar is worth more than a distant dollar… Today 6 months later

Principle 2 Only the cost (resource) difference among alternatives counts Option Monthly Fuel Cost Monthly Maintenance Cash paid at signing (cash outlay ) Monthly payment Salvage Value at end of year 3 Buy $960 $550 $6,500 $350 $9,000 Lease $2,400 The data shown in the green fields are irrelevant items for decision making, since their financial impact is identical in both cases

Principle 3 Marginal (unit) revenue has to exceed marginal cost, in order to increase production Manufacturing cost 1 unit Marginal revenue Sales revenue 1 unit

Principle 4 Additional risk is not taken without a suitable expected additional return Investment Class Potential Risk Expected Return Savings account (cash) Lowest 1.5% Bond (debt) Moderate 4.8% Stock (equity) Highest 11.5% A simple illustrative example. Note that all investments imply some risk: portfolio management is a key issue in finance

Summary The term engineering economic decision refers to any investment or other decision related to an engineering project The five main types of engineering economic decisions are (1) service improvement, (2) equipment and process selection, (3) equipment replacement, (4) new product and product expansion, and (5) cost reduction The factors of time, resource limitations and uncertainty are key defining aspects of any investment project Notice that all listed decision types can be seen and modeled as a constrained decision (optimization) problem