Safety Technical & Engineering

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

Managing the Health and Safety of Contractors
ES PICOP LEARNING FROM INCIDENTS Learning from incidents:
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
1 Version 2 23/09/13 Rule Book changes Network Operations National Briefing Team Rules changes – June 2014.
HSSE Policy Z Contractor HSSE Induction V2. HSSE Policy Z Contractor HSSE Induction V2.
Contract Certainty John Harvie 30 May Market Reform Page 2 How did this issue arise? –Global, historic practice and culture, a legacy of the past.
Health and Safety - an update Ian Gillett Safety Director.
National Rail Safety Investigations in Australia International Rail Safety Conference Vancouver – Oct 2013 Tony Simes Manager - Rail Coordinator.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
Line Blockage Guidance for Planners & GZAC
Top Ten Tips To Avoid Speeding Presented by. The Dangers of Speed 28% of fatal collisions900 deaths per year 18% of serious collisions 5,600 serious injuries.
HERO UNIT Training Module Work Zone Traffic Control And Incident Management Operations.
Conductor Decertification Discipline
Safety and Health Programs
Chapter 6 Rules of the Road.
Risk Assessment – An Essential Standard
/ 1 Line Blockage Guidance for IWA,COSS or PC Operational Close Call Line Blockage Group 24-Mar-14.
NORTH WEST (KLERKSDORP) MINE HEALTH AND SAFETY INSPECTORATE ROSE DYOBISO-SIOM.
Health and Safety Executive Health and Safety Executive Construction (Design and Management) Regulations 2007 July 2010.
THINK*PAIR*SHARE Why do you think the chances of a collision are greater at an intersection than at any other point on the roadway? (Your answer should.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
Learning from incidents: Ufton LC Near Miss ES LXA PICOP.
Health and Safety Executive Health and Safety Executive CDM 2007 Designers Version: September 07.
Module 3 Brianna James Percy Antoine. Entering the Roadway/Moving to the Curb/Backing  The seven steps to safely pull from a curb. Place foot firmly.
Community Speed Watch Scheme Mobile Vehicle Activated Signs Lee Quincey - Safe & Sustainable Team Manager June 2016.
/ Reducing Risk of Collision within T3 possessions: 5/15mph Brief London North Western.
Onsite traffic management and pedestrian safety. Aim of this session Discuss why traffic management is a priority issue for us. Consult with our workers.
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Standard 019 Update Briefing
Standard 019 Update Briefing
We always have time to work safely
VTS - Purpose VTS is being introduced to improve the safety of our staff by helping them to drive within the speed limit by providing a system that enables.
Public Conference December
Saskatchewan Assessment Appraisers’ Association
Risk Tolerance Factor # 10 Role Models Accepting Risk
Overview of Changes Made to CMAQ & System Performance Measures
Chapter 6 Rules of the Road.
SAFE WORK INSTRUCTIONS
California Automated Vehicle Regulations Update
Temporary Works Co-ordination
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
Standard 019 Update Briefing
Meter Reading Safety Initiatives
NR/L3/OHS/019-IP Work Instruction Briefing
Principal Contractor Licensing Scheme Standard
ES PICOP LEARNING FROM INCIDENTS Learning from incidents:
Standard 019 PDSW “One Year On”
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
SAFE WORK INSTRUCTIONS
Wraparound/Independent Support Service Trafford
Ground Guide Procedures. Ground Guide Procedures.
Lifesaving Rule: Plant Exclusion Zones (RRV Operations) Key Principles
Plant Person Segregation
Driver Safety Management System
SAFE WORK INSTRUCTIONS
SAFE WORK INSTRUCTIONS
Introduction to ISO 9000 ISO
Rule Book Updates December 2018
Line Blockage Guidance for IWA,COSS or PC
HERO UNIT Training Module
TOOLBOX TALKS Introduce yourself and the talk
TRTR Briefing September 2013
The ARTC Safety Management System Presentation 1/3
Individual ( and secure) PUPIL PROFILES
Changes to the Rulebook
That person will have been involved in the planning of the work.
Could it happen anywhere?
Presentation transcript:

Safety Technical & Engineering December 2017 Rule Book Amendment Briefing for ES/SWL, PICOP, COSS, MC, OTM operator and loco hauled train driver working in T3 Possessions Safety Technical & Engineering STE Possession speeds Rule Change Brief – Final – Dated July 2017

Rule Book Module T3 and Handbooks 9, 11, 12 & 15 Reduction of maximum permitted speed from 40 mph to 25 mph in possessions Rule changes Maximum speed in possessions reduced from 40mph to 25mph with additional requirement for ES/SWL & PICOP to instruct drivers/OTM operators or MC/Operators to proceed at caution, without specifying an upper speed limit Benefits Collision avoidance - Consistent instructions given to drivers/operators/MC to allow them to control their vehicles safely, maintaining control, using their expertise to travel at a speed to stop safely within the distance the line ahead can be seen to be clear

Why the change? There has been a number of high profile collisions in possessions in recent years. These rules changes have been designed to reduce the risk of further collisions. Two recurring significant factors in the causes of these incidents has been sub-standard communications and inappropriate speed control of the train. Sub-standard instructions contributed to drivers assuming the line ahead was clear to a point where it wasn’t, and that up to 40mph would be a safe speed to travel. Obviously; these collisions would not have occurred had the driver controlled the speed of the train to be able to stop within the distance the line ahead could be seen to be clear.

Why the change? The industry agreed as a temporary arrangement the adoption of a 5mph limit in worksites and a 15mph limit in PICOP controlled areas. This interim arrangement widely became known as the 5/15 rule. To clarify - 5/15 was a temporary arrangement for all train movements. All train movements are to be made “at caution” governed by industry agreed Codes of Practice (CoP) already in place. These rules changes will compliment rather than replace the CoP requirements. The freight operating companies have put in place an ACoP which sets speeds lower speeds than the maximum 25mph. The On-Track Machine companies have also got an agreed code of practice in place that has different speed restrictions to the freight operators. Rail Mounted Maintenance Machines are permitted to continue to operate at a maximum potential speed of 40mph (although in reality this is not achievable) until the Rule Book changes come in to force December 2nd 2017, when the new limit of 25mph will become mandatory. However, the ACoP speeds are not and will not be quoted in the Rule Book and could change at anytime. The speeds have not been published in the rule book as they comply, albeit more restrictively with the new ceiling speed of 25mph. It is extremely important that you do not assume that a particular type rail vehicle will approach you at a lower speed. All rail vehicles could potentially be travelling at 40mph until the new speed of 25mph is mandated in December. The same principle will apply from December in that any SSoW must be based on 25mph as this is the maximum potential speed that a rail vehicle could approach a site of work. Remember - These codes of practice are currently in place and being applied. Until December 2nd 2017 a rail vehicle could still comply with the Rule Book arrangements, approaching your site of work at 40mph. From 02 December 2017 the maximum potential speed will change to 25mph

How will the changes be published? The material in the following slides contain the amendments to rules and regulations that will be published in the September Rule Book update for implementation from 02 December 2017 Note:- Any reference to ES in this briefing applies to SWL2 and above. Any reference to COSS includes SWL1.

Before change From 02 December 17 Rule Book Module T3 Before change From 02 December 17

Recap of the changes in RB Module T3 After the changes come in What is the revised maximum potential speed in a possession? How will the movements be controlled? The reference to 40mph (65km/h) being the maximum permitted speed in possessions is to be replaced with a revised speed limit of 25mph (40km/h). As described in the following slides; the emphasis is that all movements will be made at caution. Caution being a speed that the person controlling the vehicle/train, regardless of type can stop their vehicle/train in the distance they can see the line ahead to be clear of any obstruction. The emphasis that the default speed in worksites is 5mph is reinforced. An ES/SWL is permitted to authorise movements greater than 5mph; these movements must still be driven at caution.

Before change From 02 December 17 Hand Book 9 – IWA or COSS setting up SSoW within possessions 3.7 Before change From 02 December 17

Before change From 02 December 17 Hand Book 9 – IWA or COSS setting up SSoW within possessions 4.2 Before change From 02 December 17

Recap of the changes in HB 9 What speed can you use to set up your SSoW in a worksite from 2nd December? What speed can you use to set up your SSoW with the authority of the PICOP from 2nd December? What speed do you use to set up your SSoW before the Rule Book change comes in to effect? 25mph is the new 40mph – no other rule has been affected by these changes

Before change From 02 December 17 Hand Book 11 - Duties of PICOP - Clause 7 Before change From 02 December 17

Before change From 02 December 17 Hand Book 11 - Duties of PICOP - Clause 8 Before change From 02 December 17

Recap the changes to clauses 7 & 8 in HB 11 After the changes come in Clause 7 – As a PICOP, what speed can a COSS or IWA use to set up their SSoW using your protection arrangements? Clause 8 – How do you instruct a driver or MC to proceed when you’ve completed your instructions? Clause 7 – The criteria for when this rule can be applied has not changed; the only difference is the SSoW can now be based on 25mph Clause 8 – As a PICOP, you must not quote a maximum speed to a driver/MC/OTP operator to travel at. It is important that you do not imply or encourage anything other than to travel at caution to the location you’ve specified, as this could mislead a driver/MC/OTP operator that its safe to travel at the speed you’ve quoted. It is their responsibility to avoid colliding with any potential object ahead of them. Ask yourself; could I be implicated in the cause of a collision if I specified a speed to travel at? Keep it simple, tell them clearly where they need to travel to and any other necessary arrangements at caution.

Before change From 02 December 17 Hand Book 12 - Duties of ES/SWL - Clause 6.1 Before change From 02 December 17 The following hierarchy must be adopted when giving instructions for train movements: First option is face to face between you and the driver/MC Second option is directly via a mobile communications device handed to the driver/MC Last option, and only when the first two options are not available is via a competent person of equivalent competence.

Recap on the changes in HB 12 After the changes come in As an ES/SWL, what is the maximum default speed for all movements within your worksite? How do you tell a driver they can proceed when you’ve completed your instructions? Based on this brief, name the two speeds you could quote as a speed restriction? How will you instruct a movement such as a measuring above 5 mph to be controlled? As an ES/SWL, you must not quote an upper speed to a driver/MC/OTP operator to travel at. It is important that you do not imply or encourage anything other than to travel at caution to the location you’ve specified, as this may mislead a driver/MC/OTP operator that its safe to travel at the speed you’ve quoted. It is their responsibility to avoid colliding with any potential object ahead of them. Ask yourself; could I be implicated in the cause of a collision if I specified a speed to travel at? Keep it simple, tell them clearly where they need to travel to and any other necessary arrangements at caution. The default speed in your worksite is 5mph. You may authorise movements greater than 5mph. However, the instruction must be that you are authorised to travel above 5mph at caution. The only time you must quote a speed is when you have agreed a speed restriction of either 5mph or 20mph past a site where staff are working when you have agreed this with an IWA or COSS. E.g. “driver, you are authorised to travel at caution to Whitby level crossing at 127 miles 34 chains above 5 mph at caution; additionally you must not exceed 20mph 200 yards on the approach to and through Teal tunnel, where staff are working.

Before change From 02 December 17 Hand Book 15 – MC & OTP Operator - Clause 7.4 Before change From 02 December 17

Recap on the changes in HB 15 Three questions on HB 15 The Rule Book definition of “movement at caution” hasn’t changed, but what does the term mean to you? Subject to the limits of your machine or other rule, what is the maximum potential speed you could travel at in a worksite? What two speeds could an ES/SWL instruct you not to exceed passed a site when staff are working? You will receive along with all the other necessary instructions, instructions to make all movements “at caution.” Caution being defined as a speed up to 25mph (40km/h) that the machine can be stopped within the distance the line ahead can be seen to be clear. You must still comply with any more restrictive speed as required in other parts of the regulations as well as the maximum speed of the vehicle. A PICOP is instructed to give you instructions to travel at caution only. Any staff working using the PICOPs protection arrangements will have a SSoW in place based on a maximum potential approach speed of 25mph (40km/h) An ES/SWL will also instruct you to make any movement at caution. They may however give you specific instructions relating to a restriction at a location where there are staff working, to pass a site of work at no more than 5mph (10km/h) or 20mph (30km/h)

Record of receiving this brief Anyone holding either ES/SWL or PICOP competence must record having received this brief as a competence management event in Sentinel Title – T3 Possession Speeds Briefing Short code - T3PS B Your line manager will arrange for this to be recorded This must be recorded before 15th January 2018; failure to do so will result in the temporary suspension of ES/SWL or PICOP competence This brief will not be visible when a Sentinel card is swiped. Completion of the brief will automatically restore any temporarily suspended competence after 15th Jan

Questions and Feedback Please direct any questions or feedback to either: Simon Wilkinson, Train Operations & Dangerous Goods Specialist Tel: 07739 437552 - Simon.Wilkinson@networkrail.co.uk Ian Muffett, Operations & Freight Safety Specialist Tel: 07771 826838 - ian.n.muffett@networkrail.co.uk