Planning for the TDR KEK schedule: Technical Design Report (TDR)

Slides:



Advertisements
Similar presentations
H.-G. Moser Max-Planck-Institut fuer Physik 2 nd open meeting July 4, 2008 Report on PXD Session.
Advertisements

2nd Open Meeting of the SuperKEKB Collaboration, KEK, March 2009 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Sensor R&D and Prototyping - Status -
Peter Kodyš, March 21, 2006, DEPFET workshop, Prague, Status in Prague1 Charles University Prague Pavel Bažant, Zdeňka Broklová, Jan Brož, Zdeněk Doležal,
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
SCOA – One Information Session Project Plan and Key Milestones Presented by National Treasury: Chief Directorate Local Government Budget Analysis – 18.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems Communication in the consortium Review meeting Delft,
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
SuperKEKB 3nd open meeting, July Hans-Günther Moser MPI für Physik PXD Summary Other talks in software, SVD and DAQ sessions.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
John Carwardine 22 June 2012 TEB webex meeting. Agenda Management items (John) –General updates, status of submissions –Principle Editor assignments for.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Dave Barney, Michael Kobel Overview Key objectives Motivation Next Steps.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
Dr.F. Arteche EMC DEPFET Project: A general overview.
H.-G. Moser, MPP project review, December 17, 2012 Belle & Belle II 1 Belle: ongoing analyses, papers Belle II: accelerator upgrade status Belle II detector.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
PXD EVO November 18, 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
6 th Belle PAC, KEK, February 26 and PXD - EVO, 5/March/2012 Ladislav Andricek, MPI für Physik, HLL 1
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
H.-G. Moser Max-Planck-Institut für Physik PXD EVO 21/10/ Barcelona Summary Thanks to our hosts for UB for a great meeting!
Jelena Ninković Testing PXD6 - summary and plans Jelena Ninkovic for the HLL team.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
H.-G. Moser, Advisory Board Meeting, July 2, 2013 Flavour Physics 1 B-Physics at Belle and Belle II Physics at B-Factories Upgrade at KEK: SuperKEKB and.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
B2GM, July 2013, Blacksburg, VA B2GM Summary 1 Blacksburg, VA, July 4-7 Executive changes Spokesperson: Peter Krizan -> Tom Browder IB Chair: Eunil Won.
Jelena Ninković DEPFETs in the Magnetic Field Jelena Ninkovic for HLL team.
L.Vitale INFN and Univ. Trieste
Itzhak Tserruya Weizmann Institute of Science
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Final CALICE OsC meeting: Status and summary of project
UNISEC Universal Influenza Vaccines Secured
 Silicon Vertex Detector Upgrade for the Belle II Experiment
WBS 1.03 Readout Systems Scope, Cost and Schedule
Concluding remarks E. Migneco
CSP 25th November 2010 Technical agreement number 3: overview
B2GM Sessions PXD I: Wednesday, June 6, 16:50-20:20
KEK news ( ) S.Tanaka.
The CSOI approach for integrated micro channels
New EU FP7 I3 call Identifier: FP7-INFRASTRUCTURES
SEEDS Kick-off meeting May 6, Lausanne Bojana Tasic Renate Kunz
Contact Persons Yutaka Ushiroda proposed to set up a matrix of responsible persons (contacts) for the various subdetector tasks. He plans to have meetings.
Technical Design Report preparation
Communications Share Point Collaborative WS:
Status of SOI Pixel Development
Update on ATLAS insertable B-layer
HL-LHC upgrade at IPHC news
Exchange of information with the WP.29 secretariat
SCOA – One Information Session Project Plan and Key Milestones
University Senate February 11, 2019
Calice Tile-HCal and Tail-catcher/Muon Tracker
WP2-DCO Dissemination, Communication & Outreach Month 3 Report
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

Planning for the TDR KEK schedule: Technical Design Report (TDR) for the Belle-II detector to be delivered by the end of March 2010 (end of the Japanese fiscal year) each subdetector provides its section by the end of February 2010 PXD section to be provided by the DEPFET collaboration integration into complete TDR (~ 1 month) C. Kiesling, PXD EVO Meeting, Nov. 3, 2009

Proposal for the TDR (PXD) writeup Table of Contents Physics motivation for the PXD and Overview Layout of the PXD Detector (General Description) DEPFET Sensor, Principles and Production Electronics (ASICS) Interconnections / Module Assembly Mechanical Support and Cooling (including interface to interaction region) C. Kiesling, PXD EVO Meeting, Nov. 3, 2009

Proposal for the TDR (PXD) writeup (cont.) Table of Contents (cont.) Data Acquisition and Data Reduction Power and Services, Interface to Belle-II Test Procedures Test beam results Expected Performance (Optimization Studies) Schedule and costs Collaborating Institutions, Work packages C. Kiesling, PXD EVO Meeting, Nov. 3, 2009

Work sharing Individual Sections follow closely the structure of our major meetings Proposal: Responsibles for the individual sections = Convenors of the Barcelona meeting Christian Kiesling Rainer Richter Peter Fischer Laci Andricek Hans-Jürgen Simonis Marcel Vos Jelena Ninkovic Hans-Günther Moser + Volunteers for the „open issues“ C. Kiesling, PXD EVO Meeting, Nov. 3, 2009

Work sharing (cont.) Convenors organize the writeup of their sections, using the help from their work package partners List of WP + responsibles are known Putting it all together: Editorial Board Proposal: Carlos Lacasta Zdenek Dolezal Hans-Günther Moser Christian Kiesling C. Kiesling, PXD EVO Meeting, Nov. 3, 2009

Work sharing (cont.) Technical matters: LATEX, build an SVN repository (where, who?) Schedule: Structure + Convenor + EB defined (endorsed) by KEK meeting (in 2 weeks) First version of subsections ready by Jan 10, 2010 First version of PXD TDR ready by the time of the Prague meeting: Jan 24, 2010 Discussion at the Prague meeting delivery to KEK one month later (end of Feb, 2010) C. Kiesling, PXD EVO Meeting, Nov. 3, 2009

Memorandum of Understanding (MoU) Towards a Memorandum of Understanding (MoU) Idea of a Common Fund discussed in Ringberg Meeting DEPFET-IB proposed that fund should be managed by PL MPI offers to be host institution to administrate such the fund MPI Adminstration requests a MoU to be able to accept funds from outside institutions PL will provide a draft of MoU, to be signed by the DEPFET member institutions C. Kiesling, PXD EVO Meeting, Nov. 3, 2009