HMA SPS Mandatory I/F Development

Slides:



Advertisements
Similar presentations
HMA CDR, 5-6 September 2006, Frascati Slide 1 HMA Catalogue Update Presented By Paul Kopp On behalf of Jolyon Martin, ESA Summarising many presentations.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
© 2012 WIPRO LTD | 1 Version 1.0a, 23 rd April 2012 TTCN-3 Users Conference Practical integration of TTCN-3 with Robot test automation framework.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
CEOS WGISS, Hanoi May OSCAR Prototyping the sensor web Wyn Cudlip BNSC/QinetiQ Presentation to WGISS Hanoi May 2007 (Slides.
Request for Proposal (RFP)
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
HMA January 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order AR January 2011.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
HMA 5-6 July 2010 – Slide 1 Daniele Marchionni Elsag Datamat Stefania Pappagallo Elsag Datamat HMA Follow On Task 4 - Order MTR 5-6 July 2010.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 15 February 2012 Slide 1 DREAM Task 4 Feasibility Analysis Server and Client - Implementation plans for SPS within the DREAM project Presentation.
1 HMA Follow-on – Negotiation Meeting - Task 4 ESRIN – 24/06/2009 Issue: 1.0.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
Page 1Overview of the HMA Project, 8 March 2010 Overview of the HMA Project OGC TC Opening Plenary Pier Giorgio Marchetti European Space Agency.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 AR Meeting 15 July 2009 S. Gianfranceschi, Intecs.
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
5 July 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) MTR 5 July.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
AR meeting Esrin, 26. January 2011 Slide 1 Ordering Services for EO Products Abstract (ATS) and Executable (ETS) Test Suite HMA FollowOn – Task 4 AR Meeting.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011.
ESRIN, 15 July 2009 Slide 1 Web Service Security support in the SSE Toolbox HMA-T Phase 2 FP 14 December 2009 S. Gianfranceschi, Intecs.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
HMA Identity Management Status
HMA Follow On Activities
HMA Follow On Task 4 - Order Final Presentation June 2011
CEN 202 “Space Standardisation”
HMA AWG Configuration Management Status 1 December 2008
HMA Follow On Activities
DREAM High-Level Architecture
HMA Follow On Activities
EO Applications Parallel Session
Ordering Services for EO Products SWG ATS / ETS
HMA-S Final Presentation OGC DSEO Protocol
N. Fanjeau, Airbus Defence & Space June 11, 2014
HMA Follow On Activities
HMA Follow On Task 4 - Order Final Presentation June 2011
HMA Follow On Task 4 - Order Preliminary Review 2-3 February 2010
Ordering Services for EO Products SWG ATS / ETS
HMA Follow On Activities
HMA Follow On Activities
Overview of Progress HMA Standardisation Work
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-Testbed Phase 2 AR-2 Meeting July 2009, Frascati
HMA Follow On Activities
N. Fanjeau, Airbus Defence & Space June 11, 2014
EO Data Access Protocol
HMA Follow On Activities
Web Service Security support in the SSE Toolbox
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
Ordering Services for EO Products Abstract Test Suite (ATS)
HMA Follow-on Kickoff Meeting
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
Pier Giorgio Marchetti - European Space Agency
HMA-Testbed Project Call
HMA for Science Task 1 – Project Management
Web Service Security support in the SSE Toolbox
CNR-IMAA Proposal ( and )
DAIL RIDS are posted to SSE wiki
EO profile for WMS progress report
Presentation transcript:

HMA SPS Mandatory I/F Development HMA-T Phase 2 Final Presentation 14-15 Dec 2009, ESRIN Reuben Wright, DEIMOS Space Philippe Merigot, SPOT Image Didier Giacobbo, SPOT Image Slide 1

Achievements Open Issues Demonstrations Future Work Deliverables Software Development Open Issues Demonstrations Future Work Slide 2

Deliverables: Overview Description Planned Delivery Actual Delivery SPS mandatory I/F Requirement Baseline (KO+1,5m) 07-018r3 v2 draft 04/02/09 SPS mandatory I/F Software Specification Document PM1 (KO+3m) V1.0 2/10/2008 V1.1 04/02/09 SPS mandatory I/F Software Design Document V1.0 6/10/2008 Software Validation Testing Specification of the SPS mandatory I/F PM2 (KO+5m) V1.0 04/02/09 Validated SPOT SPS mandatory I/F software N/A Validated DEIMOS SPS mandatory I/F software AR-1 (KO+7m) Available SPS mandatory I/F Validation Test Report   Progress reports and management documentation - As requiedjhjh Description Planned Delivery Actual Delivery SPS mandatory I/F Requirement Baseline (KO+1,5m) 07-018r3 v2 draft 04/02/09 SPS mandatory I/F Software Specification Document PM1 (KO+3m) V1.0 2/10/2008 V1.1 04/02/09 SPS mandatory I/F Software Design Document V1.0 6/10/2008 Software Validation Testing Specification of the SPS mandatory I/F PM2 (KO+5m) V1.0 04/02/09 Validated SPOT SPS mandatory I/F software N/A Validated DEIMOS SPS mandatory I/F software AR-1 (KO+7m) 18/02/2009 SPS mandatory I/F Validation Test Report Progress reports and management documentation -   Slide 3

Deliverables 1/2 OGC 07-018 Sensor Planning Service Application Profile for EO Sensors v2.0 draft Based on SPS v2.0 sweCommon v2.0 (better and simpler use of sweCommon, only one level of recursivity) Tasking parameters reviewed Synchonous responses (result may be sent asynchronously) Notifications Slide 4

RIDs accepted in all documents and added to Wiki Deliverables 2/2 Software Requirements Document, Architecture Design Document, Software Test Specification, Test Execution Records all completed RIDs accepted in all documents and added to Wiki http://wiki.services.eoportal.org/tiki-index.php?page=HMA-T+Deliverables Slide 5 5

SPS Library Software Development – 1/3 Release Candidate version delivered to Deimos on Oct 8th Readers and writers for SPS 2.0 requests and responses: GetCapabilities, DescribeTasking, GetFeasibility, Submit, GetStatus, DescribeResultAccess Helpers to handle Optical and SAR tasking parameters as well as corresponding feasibility study responses SPOT developed SPS library is open source Available on google code: http://code.google.com/p/eo-sps-library Slide 6

SPOT SPS Interface software Software Development – 2/3 SPOT SPS Interface software Uses SPS library Implementation of synchronous (polling GetStatus) and asynchronous (via notifications) SPS behaviors Connection to our prototype multi-mission feasibility server wrapped by the SPS interface Full simulation of acquisitions occurring after a Submit so that the interface can be tested thoroughly Notification server implemented according to the WS-Base-Notification standard from OASIS (based on the open source Apache Muse library) Server URL : http://ws.spotimage.com/axis2/services/SPSv20 Slide 7

Deimos SPS Interface software Software Development – 3/3 Deimos SPS Interface software Uses the SPS library Uses the Earth Explorer CFI to simulate a radar mission planning system Tested using Web Service Explorer for detailed access to messages, and verification against reference data. Approach is a step towards formal automation of tests within CITE – Compliance & Interoperability Testing & Evaluation Initiative Deployed on Linux server, on top of Apache Tomcat and Axis 2 web service framework at ESRIN: http://ssews1.esrin.esa.int/HMA-SPS/services/HMA-SPS Slide 8

None with HMA-T, but see “Future Work” Open Issues None with HMA-T, but see “Future Work” Slide 9

Client : Space time toolkit Demonstration Client : Space time toolkit Server : http://ws.spotimage.com/axis2/services/SPSv20 Scenario : Slide 10

Work remaining after HMA-T (and picked up in HMA-FO include): Future Work Work remaining after HMA-T (and picked up in HMA-FO include): V2.0 Specification of the OpenGIS® Sensor Planning Service Application Profile for EO Sensors (OGC 07-018) Alignment of the specification with the evolving OGC “SWECommon” and SPS 2.0 and new specification model (OGC 08-131r3) GetSensorAvailability and Validate operations Abstract Test Suite and Executable Test Suite Design, development, testing and documentation of an open source Sensor Feasibility Reference Environment Reference server and client to be used both for the testing and demonstration of the specification. Associated documentation following the tailored ECSS standards from the Statement Of Work. Slide 11