Planning Actual execution of maintenance & upgrade

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

.3.1 Technology branch of CO/RO Overview of the functions.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
Chapter 13 Managing Computer and Data Resources. Introduction A disciplined, systematic approach is needed for management success Problem Management,
Slide 2.1 4E1 Project Management Defining the Project.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
Yale University Information Technology Services Administrative Systems Art Hunt 3/22/04 Software Service Level Agreement with Finance, Procurement and.
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
What is Project Cost Management?
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
1 ICAO TECHNICAL COOPERATION BUREAU Financial and Budgetary Control and Audit.
Utilities Planning Group CIP Tracking System Jim Broome, PE Chief Engineer.
ACME ACME Solutions Inc. You Focus on Your Business & We Focus on Your IT.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
NovaTech You Focus on Your Business & We Focus on Your IT Managed Services.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Assessment of power grid elements technical condition using the example of a transformer State National Research Polytechnic University of Perm Anastasiia.
Topic1b: Project Life Cycle
Project Management Methodology Giorgio Musso Physics Department SOSMCE 2013 Summer School Genoa, Italy.
Life cycle services for automation products
District MVV Department/ Division MVV Department/ Division MVV Campus MVV Campus MVV Five District Goals Department/ Division Goals Department/ Division.
Chapter 16: Product Design and Manufacturing
Cost Management.
Managing Reliability and the Markets with PI
Produced by: Dashboards to Support your Turnaround Bob Harrell CEO Track Software.
Manufacturing Solutions- Knitting TexManage. Knitting Functional Flow Receipt of Orders Generation of Internal Order Yarn Requirement Allocation of Machinery.
E.ON Russia Production management September 2013 Deputy General Director on production Igor Popov.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Accounting systems design & evaluation 9434SB 18 March 2002.
Road Investment Decision Framework
The Associated Cement Companies Classified: INTERNAL USE ONLY The Associated Cement Companies Limited Cost Allocation Thane, 26,July 2006
Committee on Information Technology Planning and Budget Sub-Committee Board of Supervisors Assessment Appeals System April 27, 2012.
Light Touch Calculator Growth that doesn’t cost the earth Emma Hutchinson This webinar is designed to introduce you to the Resource Efficient Scotland.
Maintenance strategies
Fort Stanwix National Monument Energy Audit Contract
ICAO TECHNICAL COOPERATION BUREAU
Seminar On Energy Audit Submitted To: Submitted By:
FDFPLSCP4A Manage and schedule production
Technology that lets you Trust your batteries!
Planning Monitoring & Controlling the Maintenance Programme
How to Pass SMRP (Society of Maintenance
Establishing and Managing a Schedule Baseline
Performance indicators Unplanned unavailability
Implementation Strategy July 2002
Manage costs and schedules for system replacement due to obsolescence
Engineering Main branches within Engineering
System Development Life Cycle (SDLC)
Air Carrier Continuing Analysis and Surveillance System (CASS)
Automation Topics: Elements of an Automated System
William “Bill” McGinnis
Developing a Budget Basics for drafting and maintaining a budget for simple tracking and reporting.
European Conference on Quality in Official Statistics
Energy Intensive User Group Generation Maintenance Update
What is Project Cost Management?
System Development Life Cycle (SDLC)
Amendment Invoice Task Force Progress Report
A graphing calculator is required for some problems or parts of problems 2000.
April 22, 2010 Standard Costs Chapter 8: Standard Costs.
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT– WEEK 4 Mumtaz Ali Rajput +92 – 301-
Amendment Invoice Task Force Progress Report
May 25, 2009 Standard Costs Chapter 8: Standard Costs.
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
East Hall under construction
Real Time Engineering Slab & Coil Yard Management and Plate Stock Report , Planning, Production, Reporting & Data Base Management Solution for Metal Industry.
Performance Monitoring of IEC Industrial Gas Turbines
Presentation transcript:

Planning Actual execution of maintenance & upgrade Long-time planning of generating units maintenance and equipment replacement. 3-year planning of maintenance and replacement Annual planning of maintenance of auxiliary equipment Determination of works volume and MTP. Budgeting. Net graphs of generating units maintenance and upgrade execution Monthly scheduling and correction of work volumes Actual execution of maintenance & upgrade Scheduling of annual maintenance & upgrade activities Summary planning of materials needs.

Acting/monitoring Real-time production monitoring Tracking deviation vs. regulations requirements (chemical parameters, vibrations etc.) Expert estimate of units starts and shut downs by historical and on-line trends

Acting/monitoring. Dashboard for manager

Acting/monitoring. Dashboard for manager Net graphs of generating units maintenance and execution of upgrade projects Acting/monitoring. Dashboard for manager Project management system (Primavera) Maintenance projects. Projects for purchase of goods with long-time manufacturing cycle. Upgrade projects. Target production projects. Net graphs of routine maintenance of generating units.

Assessment of actual equipment technical conditions Alanlysis Experts of production divisions estimate regularly actual equipment technical conditions and update long-term (till 2020) activities for continuous reliability improvement: Assessment of heat-mechanical components technical conditions Long-term activities for continuous reliability improvement till 2020 Considering in maintenance & upgrade plans Assessment of electrical components technical conditions Assessment of automated control systems technical conditions

Alanlysis resluts are used for planning of next year work scope Drafting of works scope Alanlysis resluts are used for planning of next year work scope Alternatives by business process AERO Effectiveness calculation Branche’s works volume General maintenance Routine maintenance The best alternative Maintenance plan Part replacement Full replacement Upgrade plan Upgrade The best alternative