CLAS12 Tracking Design (ca. 2005) a basic design parameters

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Status Update on Mechanical Prototype in Rome November 6,
Charged Particle Tracker for a RHIC/EIC joint detector Detector layouts based on EIC and NLC Physics drivers Silicon detector technologies Simulations.
Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
Drift Chambers Drift Chambers are MWPCs where the time it takes for the ions to reach the sense wire is recorded. This time info gives position info:
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
MdcPatRec Tracking Status Zhang Yao, Zhang Xueyao Shandong University.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
June 9, 2008What’s a Drift Chamber? Mac Mestayer Drift Chambers: The Science behind the Art What are they? how do they work? ionization of the gas by particles.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
Yosuke Watanabe….. University of Tokyo, RIKEN A, KEK C, Development of a GEM tracker for E16 J-PARC 1 Thanks to ???????????
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Mac Mestayer DC12 Status: as of Feb., 2008 Decide on endplate, feedthrough, wire material –guidance from small prototype chambers mainly electrical stand-off.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Luca Spogli Università Roma Tre & INFN Roma Tre
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
CLAS12 Drift Chamber Review Mechanical Engineering Presented by David Kashy – Hall B Lead Engineer.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
CLAS12 Drift Chamber Prototyping
DC12: Tracking/simulation needs CLAS12 Drift Chambers – Physics specifications high efficiency at large solid angle (5 o to 40 o ; 50% f coverage.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Annecy, Carleton/CRPP, Colorado, Colorado State, LBNL, Maryland, McGill, MIT, Montreal, INFN Padova, INFN Pisa, Princeton, INFN Rome, UC San Diego, UC.
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
Charged Particle Tracking for CLAS12
News from Cracow on the forward tracking
CLAS12 Forward Tracking: Status and Challenges
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
VELO-installation meeting CERN, January 17, 2006
Structure and etc Shoji Uno (KEK) at B2GM
Future Plan of the Neutral Kaon Spectrometer 2 (NKS2) Experiment
WBS: : Tracking for CLAS12
Drift Chambers for CLAS12 -Mac Mestayer
Region I: stringing 1/3 done on 1st chamber!
Validation and Performance
Feb. 2, 2007 CLAS12 Upgrade Workshop Mac Mestayer
First of all we will remind some numbers:
FNAL Production Experience
Momentum Corrections for E5 Data Set
Preparation of the CLAS12 First Experiment Status and Time-Line
Station and Module Support Frames
m -> eg Drift Chambers
(On Behalf of CMS Muon Group)
Series 5300 Lithium Cell Formation System
Limited Streamer Tube Project Summary
Cluster Counting Drift Chamber as high precision tracker for ILC experiments G.F. Tassielli(1,2) (1) Dipartimento di Fisica dell’Universita’ del Salento,
Presentation transcript:

CLAS12 Tracking Design (ca. 2005) a basic design parameters Central tracker: single-sided Si strips 150 mm pitch barrel: 4 x 2, +/- 2o stereo fwd: 3 x 2, +/- 12o stereo SVT DC’s: same concept as present chambers hexagonal cells 6 sectors, 3 regions 2 super-layers/region +/- 6o stereo regions at ~ 2, 3, 4 m. 112 wires/layer (24192) 250 mm resolution reg. 1 reg. 2 reg. 3 March 23, 2009 Hall B meeting

Physics goal Physics spec. Design feature measure cross-section accurately q ~ 1 mrad dp/p < 1% planar chambers identical cells (easy to calibrate) 250 mm accuracy/layer select an exclusive reaction; e.g. only one missing pion dp < .05 GeV/c dq p < .02 GeV/c sinq df p < .02 GeV/c ~linear drift velocity +/- 6o stereo angle small cross-sections L = 1035/cm2/s high efficiency small cells, 112 wires/lyr. six 6-layer superlayers 30 mm wires good acceptance Df ~ 50% of 2p at 5o pre-bowed frames low wire tensions self-supporting design March 23, 2009 Hall B meeting

Forward Tracker: Expected Resolution dp/p, dq, df, dx - plotted versus p - at 35o 1% 0.5 mrad These results were calculated with MOMRES; in good agreement with sim/rec results from GEANT3/RECSIS12 and GEANT4/trak. Backup slide shows what happens with/wo a vtx. tracker and at 350 micron accuracy. 0.5 mrad 100 microns March 23, 2009 Hall B meeting

Superlayer Wire Layout Staggered “Brick-Wall” Hexagonal field sense . colored circles represent drift distances 6 sense layers, 2 guard layers, 14 field layers: 1 superlayer March 23, 2009 Hall B meeting

Rationale for Design Decisions 6x6 layers robust track-finding +/- 6o stereo better f resolution than CLAS planar; self-supporting identical cells, easy to calibrate, survey, repair 112 wires/layer enough for 1035 operation 30 mm sense wire 92/08 Ar:CO2 faster, linear distance-vs-time, strong, more reliable stringing low wire tension thinner endplates on-chamber amplifiers good signal/noise re-use HV, LV, ADB, TDC lots of spares; cost savings; better segmentation Backup slide is recent design decisions. March 23, 2009 Hall B meeting

Drift Velocity Calculation use 30 mm wire! 20 mm wire 2325 V 88:12 AR:CO2 30 mm wire 2475 V 92:08 AR:CO2 same gain 58% faster - and more linear ! GARFIELD calculations; backup is table of surface fields, gains for different configurations use 30 mm wire! March 23, 2009 Hall B meeting

Endplates: many precise holes Number of Holes 4925 feedthrough holes 12 survey 3 datum & alignment 28 bolt & attachment 0.200 mm true position a “50 mm” 1.7 m March 23, 2009 Hall B meeting

Endplates fit into Frames Receive endplates - inspect - measure hole positions - clean Receive frames - inspect and clean pre-bow endplate and frames bolt and glue into frames Back-up slide showing pre-bowing March 23, 2009 Hall B meeting

CLAS12 Stringing Fixture Backup is recent photo March 23, 2009 Hall B meeting

Stringing wires between “slanted” endplates “gravity” stringing wires: 9 cm - 4 m long wires strung individually wires attached by crimping wires positioned by “trumpet” endplates Backup is photo of stringing March 23, 2009 Hall B meeting

Steps in Stringing March 23, 2009 Hall B meeting

Installing Pre-tensioning Wires - before we start stringing - use springs on guard wires - gradual release of tension March 23, 2009 Hall B meeting

Stringing the Chamber March 23, 2009 Hall B meeting

Installing Pre-amplifier Boards On-board pre-amplifier boards and high-voltage distribution boards are installed after wires are strung. March 23, 2009 Hall B meeting

Electronics: Chamber a TDC 75 ft. cable Post-amp x 10 - x 30 30 mV disc. drift chamber Pre-amp 2 mV/mA 1 mA 2 - 3 electrons re-use post-amps, TDC’s backup is schematic of CP01 new circuit boards based on old SIP’s TDC’s Lecroy 1877 March 23, 2009 Hall B meeting

Model of Torus and Chambers very useful: installation cabling access March 23, 2009 Hall B meeting

Tight-packing of Cables, Connectors CAD layouts verified on a model: tight spacing dictated by requirement of 50% f-coverage at 5o multi-layer composite endplate !! March 23, 2009 Hall B meeting

Installation and mounting scheme Linkage system allows quick and accurate installation Positioning accuracy reproducible to 25 mm March 23, 2009 Hall B meeting

Schedule: Stringing the Chambers ~2 yrs./ 6 chambers ~1/2 time for stringing backup is top-down and bottoms-up estimate of time per wire March 23, 2009 Hall B meeting

Total cost: 4.6 M$ March 23, 2009 Hall B meeting Forward Tracker Outside Costs Labor (man-weeks) Total (k$)   Techs. Engrs. Designers Scientists Pd. Univ. Total Labor Sub-tasks MT ET ME EE MD ED VU S U. Cont. U. Staff man-wks k$ Design chamber 21 10 36 1 110 135 Buy endplates, frames 368 11 4 7 3 6 28 59 114 482 Buy wires, pins, feedthroughs 655 13 16 52 90 745 Buy cleanroom supplies 80 5 9 20 91 171 Box assembly 19 8 32 82 151 Design stringing fixture 2 26 44 Build clean room, stringer 141 17 53 86 226 String, instrument chamber 1550 102 60 150 328 560 2,110 Design stb/hvtb 15 45 Lay out, buy stb/hvtb 321 40 116 437 Total $3,115 202 35 25 65 85 66 146 264 924 $1,522 $4,637 PED 30 12 216 $314 CONSTRUCTION 172 24 34 263 708 $1,208 $4,323 PED: labor Const: procurements $1,565 Const: expenses $1,550 Const: labor PED: total Const: Total CLAS12 Total March 23, 2009 Hall B meeting

Lots of work ! March 23, 2009 Hall B meeting

Lot to buy ! March 23, 2009 Hall B meeting

Plans for next year: Buy reg. 2 endplates, frames Build reg. 2 boxes hire lead dc technician in July work in Jlab’s, ODU’s cleanrooms Buy wire, feedthroughs, misc. Build strong-backs, installation fixtures String first Reg. 2 chamber hire first stringing crew in fall March 23, 2009 Hall B meeting