Planned activities on collimator for LS1

Slides:



Advertisements
Similar presentations
Development of a Remotely Controlled, Mobile, Thermal Imaging Platform. Adrian Johnson Senior Operations Technician Diamond Light Source Adrian Johnson.
Advertisements

LHC Collimator Survey Train Concept / Development / Status Patrick Bestmann CERN BE/ABP/SU IWAA /09/2010 Remote Controlled Measurements in the LHC.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Actuation and Alignment Challenges of LHC Collimators M. Garlaschè on behalf of the EN\MME collimation team 1 st PACMAN Workshop CERN, Geneva, Switzerland.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
Balancer Operation Intelift Operation Installation Troubleshooting Preventive Maintenance Preventive Maintenance OVERVIEW.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
CONTROL OF HAZARDOUS ENERGY. Types of Energy To Be Controlled  Kinetic – Energy of motion  Potential – Energy of position  Electrical – From generated.
Collimation Meeting Tests on a Fully Assembled TCT Collimator in the HiRadMat Facility M. Cauchi, D. Deboy, on behalf of the Collimation Team.
Collimation Working Group #127 Collimator Alignment Control IR 7 and 3 Patrick Bestmann06/06/2011.
O. Aberle, EN/STI/TCD 16 October 2014 WORKSHOP ON R2E, RADIATION AND AVAILABILITY AT THE LHC COLLIMATOR EQUIPMENT AND INTERVENTIONS, OPTIMIZATION OF DOSE/INTERVENTION.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Collimation Working Group #137 Collimator Alignment Controls Patrick Bestmann20/02/2012.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Goal: in view of LS2/LS3/HL-LHC – evaluate possible life-time constraints in IR3/7 radiation levels equipment damage and respective lifetime considerations.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
HF Source Drivers Performance Observations and Recommendations Paul Debbins University of Iowa Nov. 10, 2004.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Updated Design of TCLD whit reduced jaw length Collimation Upgrade Specification meeting L. GENTINI.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Remote Measurement and Alignment Applications for Survey and Alignment P. Bestmann for BE/ABP/SU
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
Senior Operations Technician
Collimator design and operational experience
Mould Maintenance Presented By S.K Mandal.
STI test HRMT-35 and Collimator plans for 2017 Special ColUSM: Material and design readiness for LS2 productions 2th May 2017 I. Lamas Garcia,
T980 STATUS AND CHANGES FOR
Framework Schedule from EYETS 2016 to LS2
TS2 preparatory meeting
Energy Control Procedures Lockout/Tagout 29 CFR
Brief Status SPS Prototype PSB Prototype Installed in LS1
Very preliminary draft
Review on collimator movement with stepping motors
Helium spill in LHC tunnel
n_TOF “Draft” plans for YETS and LS2
Which conditions are obviously contributing to the symptoms?
EN-STI activities in LHC during EYETS
Results from Collimator Hardware Commissioning during EYETS 2016/2017 8th May 2017 LHC Collimation Working Group #217 I. Lamas Garcia, on behalf.
Cutting laser maintenance procedures
swingo XP Firmware, Service Tool & Error Codes
Review on collimator movement with stepping motors
Planning Quality control - Manufacturing logbook Photos Conclusions
LHC Morning Meeting - G. Arduini
Guide Roller Installation
Control of Hazardous Energy
Lockout/tagout Refresher Training
Chapter 11: Printers IT Essentials v6.0 Chapter 11: Printers
Tuesday – Morning and Evening
Monday 10th December - morning
Presentation transcript:

Planned activities on collimator for LS1 O. Aberle – 25/03/13 With input from P. Bestmann, S. De Man and F. Loprete

Main activities during the LS1 TDI.4R8 and TDI.4L2 Collimator exchange Collimator standard maintenance TIM / Robot intervention/observations Alignment Outlook O. Aberle – CWC March 25th 2013

TDI‘s during LS1 until LS2 TDI.4L2 (TDI 001 will be replaced by reconditioned spare (TDI 003) (Oct? – Nov?) TDI.4L2 (TDI 001) will upgraded with the new beam screen and additional temperature sensors, for installation in Pt. 8 Installation in slot TDI.4R8 Old TDI.4R8 (TDI 002) to be reconditioned, prepared as spare Pt. 2 Produce a new TDI 004 as spare for Pt. 8 After LS 1 four TDI’s with new beam screens, two installed, two spares New design for LIU for LS2 O. Aberle – CWC March 25th 2013

Collimator exchange New production of 16 + 4 TCTP New production of 2 + 1 TCSP New production of 2 + 1 TCAPD Preparation of 2 spare TCLP Preparation of 1 spare TCP Layout modification in Pt. 8, removal of 2 TCTVB, shifting TCLIA Pt. 1: Replacement of 4 TCT + by 4TCTP + installation of 2 TCLP Pt. 2: Replacement of 2 TCT + 2 TCLP by 4 TCTP Pt. 3: Installation of 2 new TCAPD Pt. 5: Replacement of 4 TCT + by 4TCTP + installation of 2 TCLP Pt. 6: Replacement of 2 TCS by 2 TCSP Pt. 7: Remove first two TCP per beam during ventilation door installation (to prevent damage) and exchange the skewed TCP of IR7L Pt. 8: Replacement of 2 TCT + 2 TCTVB by 4 TCTP O. Aberle – CWC March 25th 2013

Collimator standard maintenance Check each collimator mechanics and electronics. Cycle from out to in, to anti-collision and back to out. Check 5th axis for clearance Check water cooling flow Check temperature sensors Check switches, LVDT’s, resolvers, motors and drivers Map sound profile for each collimator Check rails Check roller screws O. Aberle – CWC March 25th 2013

Collimator roller screw replacement (2011-12) Dust and debris in the end cap and the housing Some dry screws regreased Up to date 3 rollers screws have been exchanged. -No linear bearing -2 LVDT‘s -1 motor -2 switches O. Aberle – CWC March 25th 2013

TIM and Robot intervention Sound inspection of the collimators done with the TIM in S34 (23/24 April 2012). Visual and acoustic inspections with camera can be useful in the future (TIM automatically, Telemax robot more flexible). Vacuum disconnection testing with the Telemax robot on-going. Use of robot for visual inspections/leak tests (He spray). Profit from the long shutdown to verify the integration and do some hardware tests to confirm the procedures. O. Aberle – CWC March 25th 2013

Alignment Survey is working in the whole machine. During smoothing, magnets will be aligned and collimators checked (and adjusted if needed). IR 3 and IR 7 are equipped with additional targets for remote verification with the stretched wire. New collimators (TCTP, TCSP and TCAPD) will be aligned. The TCP’s removed during the installation of the ventilation doors + the skewed TCP in IR7L to be checked (high radiation levels, how much deviation can be tolerated?). O. Aberle – CWC March 25th 2013

Outlook Improve the sound and image quality for the TIM, very powerful tool for the future. Investigate on the capabilities of the Telemax or similar robots for inspections and interventions. Reference sound recording of all collimators. Improve the accessibility to the screw (cap) (Phase 2!) A regular check during long breaks and shut-downs with re-lubrication of the screw. Automatic motion cycles during LS1 to be planned. Check every slot for 5th axis motion limitations. O. Aberle – CWC March 25th 2013