Transmission Planning Code

Slides:



Advertisements
Similar presentations
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Advertisements

KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exercise Opus Findings Gas Customer Forum 10 th March 2008.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Consultation on disposal of part of NTS for CCS 11 May 2009 Bogdan Kowalewicz.
Entry and Exit Investment Process Outline Transmission Planning Code Workshop 3 5 th June.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
European Developments Transmission Workgroup 3 rd May 2012.
09 May 2015 TAKE 1.5H TO UNDERSTAND AND SEE THE TYNDP 2016 PROJECTS ASSESSMENTS RESULTS Public webinar.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Transitional Exit Capacity Proposals -Update
Exit Capacity Release Methodology Statement
EU Implementation Programme
Review of System Alerts
Transmission Planning Code – Draft Document
Exit Capacity User Commitment – Transmission Workstream update
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Transmission Planning Code
Update on European Network Codes
Gas SO Incentives from April 2010
NTS Entry Charging Review Update
TGac Status and Timeline
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
Exit Capacity Substitution and Revision
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Update on Exit Capacity Substitution and Revision
Enduring NTS Exit Capacity Arrangements - Update
Development of Entry Capacity Substitution
Transmission Planning Code Review
QSEC auction timetable
Entry Capacity Substitution
Long Term Non Firm Capacity Update
Proposed Transitional Gas Exit Arrangements
EU Developments.
Gas Customer Forum DN Interruption Update - Introduction
Options for the Development of a Demand Side Response Mechanism
Ofgem presentation to Gas Transmission Workstream
Information Provision for Transitional Exit Capacity
Open Letter - Summary of Responses
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream, 1 Mar 07
Transmission Workstream 4th December 2008
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum 28 July 2008
Capacity Access Review
Presentation transcript:

Transmission Planning Code Transmission Workstream 6th March 2008

Introduction National Grid Gas (NGG) has a new licence obligation to introduce a Transmission Planning Code by 1 October 2008 that will “cover all material technical aspects relating to the planning and development of the pipe-line system…which may have a material impact upon persons connected to or using (or intending to connect or to use) the pipe-line system” Aim is to improve transparency of NTS planning process NGG will publish open letter on 7 March 2008 inviting views on the scope of Transmission Planning Code document

Transmission Planning Code – What is it? Framework document relating to the planning and development of the NTS Methodology to determine the physical capability of NTS considering Entry and exit capacity release obligations How much capacity can be transferred/traded between entry points How incremental flows at entry and exit affect system capability Statutory network security obligations Detailed assumptions on How supply and demand patterns will develop over time How the system will be operated under different supply and demand scenarios

Transmission Planning Code – Governance Transmission Planning Code must be in force by 1 October 2008 after consultation with interested parties and approval by the Authority NGG must comply with and maintain the code Review and consultation process undertaken by NGG at least every 2 years Modifications must be approved by the Authority

Timeline (2008) March April May June July Aug Sept Oct Nov... Implementation Development 7 March Open letter inviting views on scope by 21 March 2008 April/May Industry discussions on draft document June/July Formal consultation (28 days) Aug/Sept Authority considers consultation report 1 October 2008 target date for implementation

Draft Scope Legislative guidance documents e.g. IGE recommended practice documents Planning legislation and consents process e.g. Implications for investment lead times National Grid policies relevant to planning and development of NTS e.g. assessment of new loads, design of NTS pipelines and installations Network Analysis techniques e.g. considerations for investment planning, how physical capability is determined Supply and Demand Outlook e.g. how TBE forecasts are used in investment planning

Next Steps NGG publish open letter 7 March 2008 inviting views on draft scope Responses requested by 21 March 2008 NGG to develop draft Transmission Planning Code document for discussion Consideration given to licence requirements and industry views on scope Industry workshops to discuss draft document during April and May – suggested dates are: 3 April 2008 and 1 May 2008 (after Transmission Workstream) Further workshops June and July to support consultation if required