ELENA Technical Coordination Status of the AD extension building and layout of the future experimental areas F. BUTIN / ELENA collaboration
F. BUTIN / ELENA collaboration AD hall extension 570 m2 AD hall extension F. BUTIN / ELENA collaboration Sketch: A. Kosmicki
Seen from inside AD hall New building details Seen from inside AD hall F. BUTIN / ELENA collaboration Sketch: A. Kosmicki
Internal disposition Kickers 12.7 x 14.7 m2 Storage (5 x 9 m2) Porte 2,5x 3m2 Internal disposition Storage (7x2 m2) Kickers 12.7 x 14.7 m2 Storage (14x2 m2) Storage (7x4 m2) Storage (5 x 9 m2) Workshop (5 x 10 m2) Offloading area (8x4.6 m2) Storage (7x4 m2) Magnetic horns test bench (10 x 7 m2) Test bench 7 x 10 m2 Porte 6x 6 m2 F. BUTIN / ELENA collaboration
F. BUTIN / ELENA collaboration Provisional planning F. BUTIN / ELENA collaboration
How to split the challenge SHOWN IN FEB 12 Four main directions of work: Plan to relocate the existing workshop, kickers and experiments devices into a new building Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) Plan circulation, access, space for racks etc Anticipate on future possible experimental areas F. BUTIN / ELENA collaboration
How to split the challenge Four main directions of work: Plan to relocate the existing workshop, kickers and experiments devices into a new building Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) Plan circulation, access, space for racks and services etc Anticipate on future possible experimental areas F. BUTIN / ELENA collaboration
F. BUTIN / ELENA collaboration Integration Magnetic measurements showed that the existing situation should not cause problems Start design of machine supports in August, with non magnetic material (aluminium) More data has become available for H+/- source, allowing to work on integration Plan relocation of existing racks and start inventory of new racks needed F. BUTIN / ELENA collaboration
F. BUTIN / ELENA collaboration Current layout Holding points: Design of injection line: define exact position Design of ejection line towards existing experiments Sketch: S. Maridor F. BUTIN / ELENA collaboration
How to split the challenge Four main directions of work: Plan to relocate the existing workshop, kickers and experiments devices into a new building Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) Plan circulation, access, space for racks and services etc Anticipate on future possible experimental areas F. BUTIN / ELENA collaboration
Integration inside AD hall Re-start integration of GBar Sketch: O. Choisnet F. BUTIN / ELENA collaboration
Anticipate on future experimental areas A number of candidates for future experimental zones 1 GBar 2 F. BUTIN / ELENA collaboration
Anticipate on future experimental areas 1 2 GBar F. BUTIN / ELENA collaboration
On the project management side Two main documents in preparation: ELENA Quality assurance plan and project organization Naming conventions for the layout of ELENA F. BUTIN / ELENA collaboration
F. BUTIN / ELENA collaboration Conclusions A major step forward was taken with the approval of the multipurpose AD extension building and Gbar experiment General ELENA planning redefined accordingly Based on this, and on a solid layout definition of the machine and transfer lines, we can progress on overall integration of experimental areas, shielding, accesses, services, etc… In parallel, the project management structure is being developed F. BUTIN / ELENA collaboration