ELENA Technical Coordination

Slides:



Advertisements
Similar presentations
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Advertisements

Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
12th HL-LHC Parameter and Layout Committee meeting.
SBSTA 22 May 21, 2005 Presentation by Ian Burton Independent Scholar and Consultant Professor Emeritus, University of Toronto TOWARDS A FIVE YEAR PROGRAMME.
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
The integration of 420 m detectors into the LHC
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
RECORDS MANAGEMENT Judith Read and Mary Lea Ginn Chapter 7 Storing, Retrieving, and Transferring Records 1 © 2016 Cengage Learning ®. May not be scanned,
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
ELENA Integration F. Butin / ELENA collaboration.
Vacuum System P. Chiggiato TE-VSC
Oleksiy Dolinskyy December 1st, 2014
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Daniel Calcoen TE-MPE-EP
ELENA installation and commissioning status
EXTENSION ELENA = BUILDING 193 Status of integration
Task Group Status January ,11, 2017
Installations up to Start of Commissioning
AD consolidation activities in LS2
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Layout Drawings and Mechanical Assembly Drawings
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Engagement Close-Out Workshop
T3MAPS Firmware Winter 2014.
WPs concerned by L4 connection:
Main magnets for PERLE Test Facility
Upgrade Strategy for the Experimental Vacuum Systems
Laser activated thyristor. Technical description.
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Tas and Q0: Simple parametric study for Tas 15/03/07
SPACECRAFT ONBOARD INTERFACES SERVICES
Update on the PSB Transfer Lines
Proposal for the modification of building 151 in view of the LS2 PS main magnet and TT2 consolidaiton projects Dominique Bodart TE-MSC-MNC 29/09/2017.
WG Belgian Grid Implementation Network Codes.
Way to Determine the Layout of your Warehouse with Efficient Planning
CONSOLIDATION CPS-BL SYSTEM
Integration and IR Hall
CONSOLIDATION CPS-BL SYSTEM
Davisville Junior Public School / Spectrum Alternative Senior School
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
ELENA Extra Low ENergy Antiproton Ring
Development of LCLS Far Experimental Hall Hutches
Overview of Day One – 29 Feb 2016
SuperB Integration Summary of previous integration sessions.
Feedback from IKON 14 Spectroscopy.
Laser Und XFEL.EU Experiment
Presentation transcript:

ELENA Technical Coordination Status of the AD extension building and layout of the future experimental areas F. BUTIN / ELENA collaboration

F. BUTIN / ELENA collaboration AD hall extension 570 m2 AD hall extension F. BUTIN / ELENA collaboration Sketch: A. Kosmicki

Seen from inside AD hall New building details Seen from inside AD hall F. BUTIN / ELENA collaboration Sketch: A. Kosmicki

Internal disposition Kickers 12.7 x 14.7 m2 Storage (5 x 9 m2) Porte 2,5x 3m2 Internal disposition Storage (7x2 m2) Kickers 12.7 x 14.7 m2 Storage (14x2 m2) Storage (7x4 m2) Storage (5 x 9 m2) Workshop (5 x 10 m2) Offloading area (8x4.6 m2) Storage (7x4 m2) Magnetic horns test bench (10 x 7 m2) Test bench 7 x 10 m2 Porte 6x 6 m2 F. BUTIN / ELENA collaboration

F. BUTIN / ELENA collaboration Provisional planning F. BUTIN / ELENA collaboration

How to split the challenge SHOWN IN FEB 12 Four main directions of work: Plan to relocate the existing workshop, kickers and experiments devices into a new building Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) Plan circulation, access, space for racks etc Anticipate on future possible experimental areas F. BUTIN / ELENA collaboration

How to split the challenge Four main directions of work: Plan to relocate the existing workshop, kickers and experiments devices into a new building Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) Plan circulation, access, space for racks and services etc Anticipate on future possible experimental areas F. BUTIN / ELENA collaboration

F. BUTIN / ELENA collaboration Integration Magnetic measurements showed that the existing situation should not cause problems Start design of machine supports in August, with non magnetic material (aluminium) More data has become available for H+/- source, allowing to work on integration Plan relocation of existing racks and start inventory of new racks needed F. BUTIN / ELENA collaboration

F. BUTIN / ELENA collaboration Current layout Holding points: Design of injection line: define exact position Design of ejection line towards existing experiments Sketch: S. Maridor F. BUTIN / ELENA collaboration

How to split the challenge Four main directions of work: Plan to relocate the existing workshop, kickers and experiments devices into a new building Confirm space usage for ELENA (magnetic measurements, shielding, H+ or H- source) Plan circulation, access, space for racks and services etc Anticipate on future possible experimental areas F. BUTIN / ELENA collaboration

Integration inside AD hall Re-start integration of GBar Sketch: O. Choisnet F. BUTIN / ELENA collaboration

Anticipate on future experimental areas A number of candidates for future experimental zones 1 GBar 2 F. BUTIN / ELENA collaboration

Anticipate on future experimental areas 1 2 GBar F. BUTIN / ELENA collaboration

On the project management side Two main documents in preparation: ELENA Quality assurance plan and project organization Naming conventions for the layout of ELENA F. BUTIN / ELENA collaboration

F. BUTIN / ELENA collaboration Conclusions A major step forward was taken with the approval of the multipurpose AD extension building and Gbar experiment General ELENA planning redefined accordingly Based on this, and on a solid layout definition of the machine and transfer lines, we can progress on overall integration of experimental areas, shielding, accesses, services, etc… In parallel, the project management structure is being developed F. BUTIN / ELENA collaboration