RESTORE Act Multi Year Implementation Plan:

Slides:



Advertisements
Similar presentations
City of Tybee Island 2007 Master Plan Summary Report Area Character Maps and Area Development Recommendations.
Advertisements

WARD LAKE MASTER PLAN Public Input Workshop #1 July 14, 2011.
Shoreline Management Act approved by voters in the early 1970’s to: – Encourage water-dependent uses – Protect shoreline natural resources – Promote public.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
Shoreline Master Program Update. Shoreline Management Act approved by voters in the early 1970’s to: – Encourage water-dependent uses – Protect shoreline.
Paradise Preserved: Springs Protection In Wakulla County.
District of Columbia Stormwater Fees October 27, 2008 Apartment and Office Building Association of Metropolitan Washington Brendan Shane DDOE Office of.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Chesapeake Bay Watershed Public Access Plan. The Strategy for Protecting and Restoring the Chesapeake Bay Watershed was released in May 2010, in response.
Presentation to Contra Costa County Climate Leaders October 3, 2013.
CONFIDENTIAL Gulf Environmental Benefit Fund July 2015.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Coastal Web Atlases in the Chesapeake Bay Region: Examples from Virginia and Maryland Marcia R. Berman Center for Coastal Resources Management Virginia.
BUILDING STRONG ® 1 US Army Corps of Engineers BUILDING STRONG ® The RESTORE ACT and other Economic Opportunities 4 September 2013 Alabama Section American.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Brazoria County RESTORE Act Projects
Department of Environmental Quality Coastal Habitat Protection Plan (CHPP) 2 Department of Environmental Quality Environmental Management Commission.
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
Biscayne National Park Workshop on General Management Plan Alternatives 4, 6, and 7 PUBLIC WORKSHOP 6:00 p.m. Presentation 6:30 p.m. Break-out discussions.
By Will Holoman. University of North Carolina – Wilmington - B.A. in Environmental Science – Marine Science Emphasis University of Utah - B.S. in Civil.
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
1 WAKULLA COUNTY TOWN HALL MEETING One Cent Sales Tax Extension May 3, 2016 at 6:00p.m. St. Marks City Hall.
Gulf Restoration Update Erin L. Deady, AICP, Esq. November 8, 2013 Erin L. Deady, AICP, Esq. November 8, 2013.
GALVESTON BAY ESTUARY PROGRAM A CATALYST FOR PARTNERSHIPS AND COLLABORATION Sarah Bernhardt, Ph.D. Lower Rio Grande Valley 18 th Annual Water Quality Management.
1% Sales Tax Commission Board Meeting June 3, 2015.
2014 POLLUTION RECOVERY FUND GRANTS STATUS EPC Meeting October 16, 2014.
Ocean Protection Council: Proposition 1 February 3 rd, 2016 Amy Vierra, OPC Deputy Director Nick Sadrpour, OPC Sea Grant Fellow 1 Item 5.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Monday, December 7, 2015 By Stevie Freeman-Montes, Sustainability Manager Presentation Regarding Use of Deepwater Horizon Funds for: Bay Water Level Markers.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Office of the State Fire Marshal Pipeline Safety Division
What is Planning for Progress?
Neighborhood Project Funds
RESTORE Act Multi Year Implementation Plan (MYIP)
York, North Yorkshire & East Riding Local Enterprise Partnership Bio-economy Growth Fund Application process September 2016.
RESTORE Act Multi Year Implementation Plan (MYIP) Workshop Wednesday, September 6, 2:00 PM Wakulla County BOCC Chambers.
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
WORKSHOP OBJECTIVES Provide information and an understanding of:
DEPARTMENTAL OVERVIEW
Development Charge Public Meeting October 23, 2017
Comprehensive Conservation & Management Plan (CCMP)
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Chesapeake Bay Program Budget & Finance Workgroup Meeting
St. Croix County Land Acquisition Eckert Family, LLLP
WORKSHOP OBJECTIVES Provide information and an understanding of:
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
Petticoat Creek Watershed Action Plan.
Construction Management & Inspection
Anne Arundel County Maryland
RESTORE Act Multi Year Implementation Plan (MYIP) Workshop Wednesday, September 6, 2:00 PM Wakulla County BOCC Chambers.
GREEN INFRASTRUCTURE PLAN FOR (Permittee)
Amended and Restated Interlocal Agreement for Entiat Marina
Recreation and Trails Assessment
Early Learning Facilities
Project Comparison. Ward Shore Park Living Shoreline Project Follow Up to January 23 Presentation.
MDE’s Phase III WIP Inventory 2018 Fall Regional WIP Meetings
San Luis Obispo County Integrated Regional Water Management (IRWM) Region Regional Water Management Group (RWMG) Meeting SLO City/County Library Community.
St. Marys Intracoastal Gateway.
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
RESTORE Act Multi Year Implementation Plan (MYIP) Workshop Wednesday, September 6, 2:00 PM Wakulla County BOCC Chambers.
Biltmore C Proposed Water & Sewer Improvement Project
RESTORE Act Multi Year Implementation Plan:
RESTORE Act Multi Year Implementation Plan (MYIP) Workshop Wednesday, September 6, 2:00 PM Wakulla County BOCC Chambers.
I Street Bridge Replacement Project
Eric Ellis Habitat Restoration Senior Program Specialist
SHOAL CREEK WATERSHED ACTION PLAN
Presentation transcript:

RESTORE Act Multi Year Implementation Plan: RESTORE Act Multi Year Implementation Plan: Status and Development Workshop Monday, November 20, 2017 @ 3:00 PM Wakulla County BOCC Chambers

WORKSHOP PURPOSE To provide an update to the Board on the following: Community Needs Assessment Proposed citizen projects Input received from public meetings and comment period September 19 – October 6, 2017 Proposed MYIP Project Draft MYIP without Projects Decision Points

Community Needs Assessment (CNA) Phase One: Staff completed an initial analysis of existing local documents and approved state plans. The list of documents and plan is included in the CNA appendices. Phase Two: Staff solicited input during public meetings and during the public comment period for gap analysis. No public input was received. Phase Three: The final CNA is attachment number 3 of the Agenda.

Proposed Citizen Projects …a snapshot of each project submitted

Project Title: Septic Tank to Sewer and Retrofit Assistance/Connection to Sewer Assistance Submitted by: Stan Derzypolski Project Objective: Inspect failing septic systems, both residential and commercial, in the BMAP area for operational failure. Assist with implementation of retrofit to reduce nitrate load into aquifer, extend sewer system and assist with existing residential connection. Estimated total cost: $500,000 Staff met with Mr. Derzypolski regarding his proposed project. He agreed that the project is very similar to another county project, however, believes that his project should add an educational component to it.

Project Title: Panacea Head Boat Educational & Eco Tours Submitted by: Maureen Mitchell, Panacea Waterfront Project Objective: To purchase a head boat to be located at Rock Landing Dock that will create employment; to promote and operate the boat and bring visitors to the area. Estimated Total Cost: $300,000

Project Title: St. Marks Sewer Upgrade/WWTP Submitted by: Bob Phillips Project Objective: Make all of St Marks sewer system gravity drain to central pumping station – taking out all grinder pumps thereby stopping raw sewage from being washed into the watershed during storms and high water events. Estimated Total Cost: $3 million

Project Title: A Partnership for Reviving Apalachee Bay Oyster Reefs Submitted by: John Taylor * Wakulla Fishermen’s Association, Inc. Project Objective: Provides shoreline restoration on hard-bottom Apalachee Bay oyster reefs to enhance commercial and recreational fisheries, including Wakulla’s commercial fishing heritage; strengthen tidal, storm surge and coastal erosion protection; improve water quality’ strengthen economic, social and environmental capital with a team approach including seafood-dependent workers. Estimated Total Cost: $2.6 million Staff met with Mr. Taylor and Ms. Dana Peck regarding the project. Staff will contact FWC to arrange a meeting with all parties involved to discuss the potential of FWC’s involvement and services available to facilitate the project.

Project Title: St. Marks Fishing Pier Submitted by: Zoe Mansfield Project Objective: Provide recreational opportunities in the areas that are not available by allowing the public access to pier fishing and increase birding opportunities for views and photographers. Estimated Total Cost: $290,000

Project Title: St. Marks Boardwalk Submitted by: Zoe Mansfield Project Objective: Complete an existing phase of boardwalk and expand the existing trail to develop a trailhead. The project is shovel ready with plans and permits. Estimated Total Cost: $900,000

Project Title: ADA Compliant Kayak & Canoe Launch Submitted by: Zoe Mansfield Project Objective: To enhance recreational opportunities on the St Marks river by allowing for a low-impact access to coastal and river areas. It will be located next to San Marco de Apalachee Fort and will help boost tourism for canoeist, kayakers, stand up paddlers, fishermen, birding and environmental viewing. Estimated Total Cost: $65,000

Project Title: Convert Grinders to a Gravity Sewer System Project submitted by: Zoe Mansfield Project Objective: Replace grinders with gravity drain to reduce operational cost and malfunction of units. This would benefit ecological resources with restoration and protection of the natural resources ,ecosystems, fisheries, marine and wildlife habitats and help with public safety and welfare. Estimated Total Cost: $5.5 million

Input from Public Meetings and Comments Public meeting and comment period was from September 19 thru October 6, 2017

Comments Received: Eighteen (18) Citizens provided an array of comments on array of projects and ideas, but did not submit project forms or supporting documentation. Comments were received on the following topics: Dredging and Channel Markers – support, received from Robbie Lowther Observation Tower near Panacea – support, received from Robbie Lowther and Jack Rudloe Community Center Pool – support, Denise Spivey Sewer Connection in older neighborhoods, specifically Ameliawood Subdivision – support, received from Denise Spivey Extension of deadline for comments on proposed projects – support, received from Wakulla Springs Alliance Installation of barriers to deter vehicle traffic on private land (Pine Island) – support, received from Bradley Hartman Water quality study of Oyster Bay and Skipper Bay – support, received from Bradley Hartman Sponsorship of a one time oyster relay from closed waters to open waters, support received by Bradley Hartman Minimize/eliminate development along the shores of Skipper Bay – support, received by Bradley Hartman

Comments Received Regarding SEP Projects Artificial Reefs – support, received by Jack Rudloe, Wakulla Springs Alliance and Panacea Waterfront. Opposes, received by Bob Phillips. Bayside Marina – support, received by Matt Michalski. Oppose, received by Robbie Lowther, James Hennessy, Jack Rudloe, Wakulla Springs Alliance and Bob Phillips Coastal Sewer (Shell Point, Spring Creek, Oyster Bay) – oppose, received by Jack Rudloe and Wakulla Springs Alliance Coastal Storm water Panacea – oppose, received by Jack Rudloe and Wakulla Springs Alliance Mashes Sands Park – support beach renourishment and park improvement, received by Jack Rudloe, Wakulla Springs Alliance and Panacea Waterfront. Oppose dredging of sand flats, Jack Rudloe, Wakulla Springs Alliance and Panacea Waterfront.

Comments Received Regarding SEP Projects Continued….. Otter Creek WWTP – support, received from Jack Rudloe and Wakulla Springs Alliance. Oyster Bed Restoration – support, received from Jack Rudloe and Wakulla Springs Alliance. Skipper Bay – support, received from Bradley Hartman. Oppose, received from Jack Rudloe, Wakulla Springs Alliance and Bob Phillips. Spring Creek – support, received from Bradley Hartman. Oppose, received from James Hennessy, Jack Rudloe, Wakulla Springs Alliance and Bob Phillips. Trail Head Oaks Property – support, received from Panacea Waterfront. Oppose, received from Jack Rudloe, Wakulla Springs Alliance and Bob Phillips. Wakulla Gardens septic to sewer – support, received from Jack Rudloe and Wakulla Springs Alliance WINCO St Marks – support, received from Jack Rudloe and Wakulla Springs Alliance

SEP PROJECTS – RANKINGS COUNTY AND CITIZENS County Based on Scoring Public Input Average 1 Wakulla Gardens Septic to Sewer Coastal Storm water Panacea 2 Grieners Addition Bayside Marina Purchase 3 Trail Head Oaks Property Mashes Sands Park 4 5 Otter Creek WWTP Artificial Reefs 6 Coastal Storm water (Panacea) Coastal sewer (Shell Pt/Spring Creek/Oyster Bay 7 Coastal Sewer (Shell Pt/Spring Creek/Oyster Bay) Wakulla Gardens 8 Oyster Bed Restoration Skipper Bay 9 10 11 Spring Creek 12 13 WINCO-St Marks

Proposed MYIP Project Selection Criteria RESTORE Act Criteria: infrastructure projects benefitting the economy or ecological resources, including port infrastructure Included in the Community Needs Assessment Contributes to activities that are focused on water quality and marine life habitat within County Waters (e.g., reduces non-point pollution or provides/restores habitat), which was a recurring theme of needs at Public Meetings Projects that cover an initial 3-5 year period (2018-2022) for sequencing and phasing purposes. Projects partially funded from other State or Federal grants Can be leveraged or matched with other State or Federal grants. Necessary to continue a current septic-to-sewer project and sewer expansion. Essential to water quality and marine life habitat within county waters. County resources can support and maintain projects.

Proposed MYIP Projects 2018-2022 PROJECT: Wakulla Gardens/Grieners Addition Septic-to-Sewer (SEP priority project #1, #2 and Citizen Ranking #7 and #10) Activities: Connection Fees for septic-to-sewer projects – property agreements and connections Otter Creek Retro fit – Planning, design, procurement and construction Lift Station, located on US98/Spring Creek (referred to as Jerry Moore Lift Station) – Planning, design, procurement and construction. PROJECT: Artificial Reefs (SEP priority project #9 and Citizen Ranking #5) Identification and analysis of viable reef areas Permitting Construction

RESTORE POT 1 FUNDING MATRIX Spreadsheet will be presented at meeting.

Draft MYIP without Projects Included with Agenda Package is draft MYIP w/o projects. US Treasury has reviewed and advised we are on right track Draft MYIP w/Projects and all attachments will be presented in January Questions or changes to the draft?

DECISION POINTS and BOARD DIRECTION Approve the Community Needs Assessment Approve the proposed recommended MYIP Projects and Ranking Approve the draft MYIP without projects Other?

WAKULLA MYIP PLAN OF ACTION January 8, 2018 BoCC MEETING; Present draft MYIP with projects for board input (Task 3-4) January 22, 2018 or February 5, 2018 BoCC MEETING: Present FINAL MYIP for Board approval and to start the 45-day (Task 5) comment period. April 2, 2018 BoCC MEETING: Present summary of comments received and proposed responses for board approval/discussion and approval to submit FINAL MYIP to US Treasury (Task 5)

ANY QUESTIONS?