Countdown To 0409 April 2008.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
Queensland Treasury Department Role and Function of Treasury Financial Framework Charter of Fiscal and Social Responsibility and Priorities in Progress.
Financial Management System in Albania
INDONESIA Peter D. Ellis Senior Urban Economist EASIS.
ENVIRONMENTAL MANAGEMENT PLAN
CURRENT PROPOSALS FOR FURTHER INTRODUCTION OF DISPUTE BOARDS WITHIN THE CONSTRUCTION INDUSTRY IN ROMANIA.
Common recommendations and next steps for improving local delivery of climate finance Bangkok, October 31, 2012.
THE ROLE OF CIVIL SOCIETY IN WELFARE MIX MODEL CREATION Best Practice Model Social Center "Home of colors"
Audit of Public Procurement
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
IN YEAR MONITORING & BUDGET PREPARATION WORKSHOP PREPARED BY BUDGET OFFICE MAY
1 1 BRANCH: CORPORATE AFFAIRS 1. CORPORATE MANAGEMENT SERVICES To provide financial and strategic support services that enhance service delivery by the.
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
Common Disasters and Uncommon Responses Shamima Khan.
Financing for Development United Nations Risk Mitigation for Mobilizing Private Sector Investments in Infrastructure in Developing Countries Pradeep Singh.
Evaluation of EU Structural Funds information and publicity activities in Lithuania in Implementing recommendations for Dr. Klaudijus.
Capacity Building for the Kosovo Anti- Corruption Agency Constantine Palicarsky.
WSSB Capacity Enhancement Workshops 1 Session 2: Legal & Institutional Background for Management of Small-Town Water Systems.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Urban Group Presentation. Commitment and Leadership Legislate Policies Increase Allocation Sanitation Champions at different levels Sanitation as a separate.
International Standards of Supreme Audit Institutions (ISSAIs) Jennifer Thomson Director OPSPF & Chief Financial Management Officer World Bank.
Module 4: Disaster Recovery Frameworks ASEAN Training of Trainers (TOT) on Disaster Recovery.
Module 9: Transition and Exit Strategy ASEAN Training of Trainers (TOT) on Disaster Recovery.
Treasury of the Republic of Kazakhstan
Recovery and Reconstruction in India: Future Directions
Department of Cooperative Governance
Introduction/Background Aim of the assessment was to assess the impact of the 3 institutions MOHCDGEC, PO-RALG and MOFP in the flow of funds from national.
Training Course on Integrated Management System for Regulatory Body
Agency Performance: A New Agenda
Sendai Framework for Disaster Risk Reduction
Priorities and coordination of capacity building in Azerbaijan
Open and inclusive budgeting: Working beyond boundaries
PEMPAL IACOP PUBLIC INTERNAL CONTROL: MANAGEMENT AND CONTROL OF THE PUBLIC ENTITIES Presenter: Malapateng Teka; National Treasury| March 2016.
Nias Islands Stakeholder Meeting II Gunung Sitoli, Januari 2005
ONE YEAR RECONSTRUCTION Progress and Next Agenda
Capacity Building Project for Argentina’s Voluntary Peer Review
Klaus Deininger, Nizalov Denys, Wael Zakout, Kathrine Kelm
First meeting 28 September 2006 Council of Ministers
District Disaster Risk Reduction Managment Plan
PROGRESS REPORT ON IMPLEMENTATION OF THE PUBLIC FINANCE MANAGEMENT ACT
By Dr. Kuntoro Mangkusubroto
Financial Management System in Albania
ACEH - NIAS: OVERVIEW OF CURRENT PROGRESS AND CHALLENGES
Implementation of the Sustainable Development Goals (SDG) in the Republic of Uzbekistan Geneva, April 12, 2017.
Overview Rationale Context and Linkages Objectives Commitments
Quality Management Systems – Requirements
2016 Procurement Framework Contract Management
The role of the Passport Indicators in Monitoring PFM Strategy
Draft OECD Best Practices for Performance Budgeting
WAJIR COUNTY CLIMATE CHANGE ACT 2016
Developments And Achievements In Implementing Public Internal Financial Control (PIFC) Reform In Armenia EDGAR MKRTCHYAN, PhD Chairman of Executive Committee.
The SWA Collaborative Behaviors
Portfolio Committee On Sports and Recreation 7 November 2017
Sustainable Transition / Handover of malaria TB and HIV Global Fund Grants Generic 2018.
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
Introduction to the Workshop
progress of the water reform in bulgaria
EFFECTIVE POLITICAL OVERSIGHT ROLE ON FINANCIAL MANAGEMENT
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
Overview Rationale Context and Linkages Objectives Commitments
Session 9: Transition and Exit Strategy
ISO management systems
Developing a shelter strategy
MPUMALANGA 4TH QUARTER EIG PERFOMANCE
Director-General: Mr. E Africa
Audit of Contracting Arrangements of Public Services
CRISTINA BREDEN – Director ROMANIAN COURT OF ACCOUNTS
Portfolio Committee on Communications
Presentation transcript:

Countdown To 0409 April 2008

Current Progress Needs Progress April 2006 April 2008 New houses 120,000 unit 41,734 unit 105,231unit Agricultural land 60,000 ha 37,926 ha 63,923 ha Road 3,000 km 490 km 2,191 km Seaports 14 2 17 Airports/airstrips 11 5 10 Teachers 2,500 died 2,430 trained 23,270 trained Schools 2,006 unit 524 unit 888 unit Health facilities 127 unit 113 unit 613 unit

The BRR Transition Process and Timeline 1/3/2008 1/10/2008 1/11/2008 31/12/2008 1/2/2009 1/3/2009 16/4/2009 Soft Closing Grand-Closing Perpres tata cara pmt dan kesinambungan Financial Report Preparation Finalization AP3D handover, final Final Report Preparation Audit by BPK Submission of final report to President All Contracts finished PD on Blueprint Review MOU with Stakeholders Support other Depts in preparing budget Presidential Decree of BRR Disbandment

TRANSITION PLAN OBJECTIVES BRR Mandate is completed and delivered in an accountable and transparent manner Output (AP3D) is handed over according to Indonesian standard Remaining RR Program is continued in a seamless way Residual Issues are satisfactorily addressed A Framework for Sustainable Development of Aceh and Nias is made available

BRR CAN ADOPT NARROW OR BROAD TRANSITION GOALS Prepare for long-term development of Aceh Help GoA plan for next 5 years Transfer capacity from BRR Maximise impact of overall Recon & Rehab Coordinate transfer of NGO and donors assets Fill remaining gaps Monitor all activities Deliver on core BRR implementation mandate Deliver BRR projects Transfer assets Limited capacity-building

Delivering on BRR Mandate BRR was formed in order to ACCELERATE the rehabilitation and reconstruction of a post disaster area – speed is of the essence BRR role is to EXECUTE the Government Budget funded program and COORDINATE and FACILITATE non Government funded programs – complexity of size and scope is the performance challenge … to do it in a professional manner, and in the most accountable and transparent way – it is a management action and attitude matter … with full consideration that at the end of its mandate the activity will be continued as a responsibility of the central and local government – multi point handover is expected

The Relevant Transition program Ensuring that all achievement and progress, both done with Government Budget and with Non Government funding are properly accounted for and acknowledged Ensuring that all ‘BRR Projects’ process and results are done in the most proper manner, and the full coordination cycle – from project identification to completion and output transfer is performed satisfactorily Ensuring that all monies and activities under BRR responsibi- lity are accountably spent, done and reported accordingly Ensuring that the remaining activities are prepared for transfer and the subsequent responsible party be made aware and prepared to do so

Output (AP3D) is handed over An Asset Management and Transfer Program for Government funded projects is being implemented and continuously done – the system is acknowledged as a national best A global Asset Mapping project is being prepared, with an aim to be finished before the end of 2008 – updateable later Projects which are foreseen to be not finished by end of mandated time is currently being discussed with succeeding agencies through a structured approach - 7 Departments listed Allocation for 2009 RR budget to Central and Local Government entities agreed with Finance Minister Discussion on personnel transfer is going on, execution at proper BRR timing Document management and transfer started, The National Archive agency being the final custodian

NEED YOUR COOPERATION TO ENSURE ASSETS PROFILE COMPLETENESS GOI standard requirements PCN Registered and updated From unregistered projects

Continuity of Remaining Programs Non Government Budget funded programs/projects continuity is still to be understood and facilitated as needed. Project status reporting is getting more crucial for all Facilitation of international stakeholder projects and personnel will be returned to ‘normalcy’ as reconstruction activities moved into development With MDF continuing until 2011 and Bappenas will assume the role that BRR has played, coordination needs may use that as a core hub Joint funded projects are now being reviewed in view of BRR’s closure

Usulan Skema RKP 2009 Continuity of Government Funded RR program for 2009 RKP 2009 6.8 T 222 M (RM)‏ 6.6 T Administrasi Umum Penuntasan RR 3.4 T (PHLN)‏ Kementerian Lembaga 3.2 T (RM)‏ Pemerintah Daerah Dekon/TP APBD Dinas Dinas Dinas Dinas Dinas Dinas Dinas-Dinas di Lingkungan Pemda NAD dan Nias

Institutional Arrangement Activities To be Continued By Central Govt Agencies Executing Agency Activities Location 1 Dept. Pekerjaan Umum (Public Works) ADB – Roads project (ETESP) NAD MDF Bank Dunia – Infrastructure Reconstruction Enabling Program (IREP) NAD-Nias MDF Bank Dunia – Infrastructure Reconstruction Financing facility (IRFF) NAD-Nias JBIC – Prasarana Jalan dan Drainase NAD AFD – Drainase Kota NAD 2 Dept. Perhubungan (Transportation) MDF Bank Dunia – Infrastructure Reconstruction Financing facility (IRFF) - Ports NAD 3 Dept. Dalam Negeri (Internal Affairs) MDF Bank Dunia – Kecamatan Rehabilitation and Reconstruction Planning (KRRP) Nias IDB - Simeulue Reconstruction Project NAD 4 Dept. Agama (Religious Affairs) IDB – Reconstruction of IAIN Ar-Raniry NAD

Institutional Arrangement Activities To be Continued By Central Govt Agencies

Institutional Arrangement Activities To Be Continued By Local Government 13

Resolution of Residual Issues Varied in type, extend and stakeholders. Basically a Risk Assessment and Management plan is being activated. Those related to financial accountability, if any, will be addressed with proper audit agencies, such as BPKP and BPK Compliance to existing law and regulation is ensured with continuous consultation with proper bodies, such as the DPR Institutional communication is being ramped up

WHAT EXPECTATIONS DO STAKEHOLDERS HAVE OF BRR TRANSITION GOALS? Donors NGOs International Executive Legislative National Government Legislative Public Local Bapel Broader BRR Contractors/Satkers BRR

Sample Issues : Terms and condition of assets transfer Operational and maintenance management of transferred assets Viable solutions for finalizing incomplete projects Sustainability of soft/intangible programs Disputes between contractors, beneficiaries and implementers Audit results post BRR presence Issues of legal liability brought against implementers Receiving agencies’ position on accepting responsibility for certain assets Sustainability of investment for reconstruction

Risk Management Issues BRR assert the need to identify and establish a plan to address significant risks, both for managing delivery activities and for transition strategy purposes: Operational Risk Quality Delivery Financial Risk Reporting Auditing Funding Legal Risk Procurement Environmental Political Risk International National Local Both in addressing Compliance and Expectation Management Issues

DISCUSSION WITH STAKEHOLDERS INDICATES THAT BRR NEEDS TO PLAY A BROADER ROLE IN MANAGING TRANSITION Prepare for long-term Aceh development Help GoA plan for next 5 years Transfer capacity from BRR Maximise impact of overall Recon & Rehab Maximise impact of overall Recon & Rehab Coordinate NGOs and donors Fill remaining gaps Monitor all activities Deliver on core BRR implementation mandate Deliver projects Transfer assets Limit capacity-building

PROVIDING CAPACITY IF AND WHEN THE GOVERNMENT REQUIRES THEM A FRAMEWORK FOR SUSTAINABLE DEVELOPMENT FOR ACEH AND NIAS? PROVIDING CAPACITY IF AND WHEN THE GOVERNMENT REQUIRES THEM

T.h.a.n.k Y.o.u