Innovation solution for a decommissioning strategy of the class B:

Slides:



Advertisements
Similar presentations
Transport RAIL Isabelle Vandoorne Brussels, 29 November 2012 TEN-T 2012 calls info day.
Advertisements

Interoperable Railways from vision to reality: the Italian experience RAILWAY DAYS – BUCAREST.
Ivan Tuháček UIC ERTMS World Conference, Istanbul 2014
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS PROJECT OVERVIEW.
Pardubice, Czech Republic - 25 Oct 2004
Stakeholder meeting on the SHIFT²RAIL Strategic Master Plan Manuel Pereira, IST Lisbon ERRAC Vice Chairman 20 th June 2014, Brussels 1.
SPUTNIC – Strategies for Public Transport in Cities Strategies for Public Transport in Cities Funded by the EU Project introduction.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
TMP 205 rev.00 La gestione del traffico ferroviario con le nuove tecnologie satellitari Come GALILEO puo’ contribuire a rendere piu’ efficienti le linee.
Trans-European Transport Network and the Connecting Europe Facility
New Satellite-based Solutions for Train Control Systems
Transport Sustainable Mobility and Integrated Planning in Urban Areas: Trade Union Dialogue with Local Authorities Day 2: 5th February 2013, SESSION 1:
ERTMS state of the art and evolution of the applications considering customer’s orientations.
11 Satellite-based solutions for Train Control Systems European Parliament, Brussels Tuesday, 11 February 2014 Francesco Rispoli, Manager Satellite Technology.
Peter Gurník, Oldřich Trégl Satellite based train location.
THE NEW TRANS-EUROPEAN TRANSPORT NETWORK A CORE NETWORK: BLUEPRINT FOR 2030.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
European Commission 1 Directorate General for Energy and Transport Discussion for a co-ordinated trans-European Deployment Plan for ERTMS 15 June 2004.
Transport The new TEN-T guidelines Results of the legislative procedure Philippe Chantraine (MOVE B1), 24 June 2013.
Transport ERTMS on the EU core network by 2015, 2020, 2030 strategic (pragmatic) approach UIC conference 2014 I. Vandoorne.
UIC ERTMS World Conference ERTMS Baselines Pio GUIDO, Head of ERTMS Unit Istanbul, 2 April 2014.
Financing of TEN-T projects via INEA
Transport The new TEN-T guidelines High Level Meeting Danube Commission Cesare Bernabei Budapest, 9 October 2013.
These statements do not commit Alstom to participation in any specific projects Abcd -SIGNALING IST WORKSHOP Ian Dobson Mainlines Strategy Director.
INTERFACING ETCS WITH LEGACY CC-SYSTEMS TRACK - SIDE.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
UIC ERTMS Conference - Budapest 4 th -6 th April 2006 STRATEGY AND EXPERIENCES OF THE ERTMS DEPLOYMENT IN SPAIN Antonio Domínguez Chala ADIF.
Key factors in the transport policy to encourage better integration Sixty-Third Session of UNECE, Geneva, 30th March 2009 "Economic Integration in the.
Achievements and lessons learnt by early implementers
CERTIFER 1 J.P PRONOSTP.OZELLO UCI ERTMS CONFERENCE BUDAPEST.
To Create a Better Life through Green Network ERTMS Application in Korean Railroad
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
Roadmap to a Single European Transport Area – Towards a competitive and resource efficient transport system.
ETCS Level 1 Deployment in Luxembourg UIC ERTMS CONFERENCE 2006 BUDAPEST François JAEGER Director CFL Member of the CFL board of.
ERTMS/ETCS BENEFITS FOR RAILWAYS WORLD WIDE Norwin Vögeli
in Croatian Track access charging system
Financing LNG Investments in Energy and Transport
Oregon State Rail Plan Update
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
A Single European Railway Area :
AusRAIL 2005 M. Pottendorfer / H. Boyer - Alcatel TSD Austria
Maria Price, DPhil. (Oxon.) Head of EU Policies and Public Affairs
TRT Trasporti e territorio
Relevant EU legislation and upcoming developments
GREECE-ALBANIA IPA CROSS BORDER COOPERATION PROGRAMME
5th Regional TAF TSI Workshop SK, CZ, HU
INEA Innovation and Networks Executive Agency
ERTMS Application on Tests and Maintenance
The Shift2Rail IP2 vision
Session II: System authority for ERTMS 4RP Trackside approval
Europe’s railways – where are you?
Valenciennes, 15th November 2017
CCRCC 2017 Rail Freight Corridor view 16 November 2017
Chances for quick wins in the railway sector
The ERA EVORA Program Evolution of railway radio communication
European Investment Bank
National Implementation Plans (NIP)-European Deployment Plan (EDP)
ERTMS in France Successes and challenges CCRCC – 15th November 2017
The new regulatory framework for suburban railways
Baltic-Adriatic Corridor
EU / Russia – interoperable Automatic Train Protection
ERTMS: specifications, deployment, financing
Sagemcom GSM-R regional workshop April 2011 Villány, HUNGARY
Security for Safety: Enabling Digitalization of Railway Systems
Trikala Trikala, the national smart city “flagship”, aims to become a leading European smart city in terms of openness, usefulness, efficiency and tech-talents’
EU / Russia – interoperable Automatic Train Protection
Presented by European Railway Agency (ERA)
How to accelerate the roll out of ERTMS?
ERA and accident statistics
Railway Conference Pardubice
Presentation transcript:

Innovation solution for a decommissioning strategy of the class B: the Italian path Fabio Senesi Valenciennes 15 11 2017

Needs and Technologies: "Lasagna story" - Stratification over time - Needs Interoperability Capacity Speed Safety Technologies Ertms Etcs L3/L2/L1 Electronic Legacy Class B Relais Interlocking

The Italian Rail Network - Needs Lines classification related to the traffic development ~ 1000 km High Speed Network (6%) Command Control System : ERTMS/ETCS L2 Train spacing with radio block Speed/Interoperability ~ 950 km Metropolitan Traffic Lines (5%) Command Control System : CTC, SCC, SCC-M Train spacing with short block sections (High Capacity) Increase capacity Fast Lines ~ 2.900 km (18%) Command Control System : CTC, SCC Train spacing with SCMT Middle performances + Freight lines ~ 3.900 km (23%) Command Control System : CTCev, SCC Train spacing with block sections: SSC,SCMT Interoperability ~ 7.950 km Subsidiary + Low Traffic Lines (48%) Command Control System : CTC Train spacing with block sections: SSC Economic Sustainability

ERTMS Core Network (km) ERTMS HD Urban Nodes(km) ERTMS RFI Scenarios 2018-2021-2016 ERTMS High Speed (km) ERTMS Core Network (km) ERTMS HD Urban Nodes(km)

Level 1/Level 2 (Baseline 3) Overlapped to Satellite & Public Bearer ERTMS Portfolio in RFI ERTMS (ETCS+ GSM-R+ETML) Upgrading GSM-R High Speed Network Level 2 (Baseline 2) without fallback High Density Urban Nodes Level2 /Level 3 (Baseline 3) Overlapped to National CCS Freight & Passenger Tent-T Corridors Level 1/Level 2 (Baseline 3) Overlapped to National CCS Low density Lines Level2 /Level 3 (Baseline 3) Satellite & Public Bearer SST / SSB Integration IOP Test for Safe Integration Mistral Analisi Integrata accudienze

RFI ERTMS Deployment Plan Description The ERTMS Deployment Plan on the RFI Network (last version on 15/06/2017 - rev.F) has been developed in observance of mandatory UE Regulations: EU Reg. 2016/919, EU Reg. 1315/201,1316/2013, EU Reg. 06/2017 conteining the European Deployment Plan (EDP) The Plan include also Economical Sustainability and ERTMS Safety Improvement criteria On all new high speed lines On the TEN-T according a stepwise criterion: Within the dates indicated in the «Core Network Corridors» EDP (Reg.UE 06/2017) Within 2030 on the « TEN-T Core Network» Within 2050 on the whole «TEN-T» In metropolitan nodes (HD ERTMS) in order to maximize high-density functionality On low-traffic lines (ERTMS Regional) where it is a great opportunity in terms of reducing commercial and maintenance costs According the UE requirements, ERTMS must be installed: Business Opportunity

Some consideration … How to achieve a positive Business case as soon as possible after such a big investment ? The migration to ERTMS must be followed by CCS National systems decommission Harmonization of the migration plans of IM and RUs Financing instruments (public grant, private fundings, both …) … within a legal framework to oblige the migration providing the sharing of benefits among IM and RUs

(2024 Advisory Program for Rus) Ministry Level - ERTMS National Deployment Plan NDP Description Through an articulated process of sharing and involving involved parties, the Ministry of Infrastructure and Transport, starting from the RFI Deployment Plan, in compliance with the point 7.4.4 "National Implementation Plans" of the Annex to the EU Regulation 919/2016 (STI CCS), defined a National ERTMS Plan for the Italian rail system as a whole (Infrastructure Managers and Railway Undertakings) with the aim of providing all operators with useful elements to determine their choices both on trackside and on-board. With regard to ERTMS applications on the RFI network, the Plan is perfectly aligned with the RFI ERTMS Plan. For ERTMS on-board applications, based on the infrastructure ERTMS investments, the National Plan provides coherent considerations for the on board equipment. From 2026 IM Could start the official decommissioning of Class B in a Line equipped also with ERTMS (2024 Advisory Program for Rus)

ATP/ATC Overlapping Strategy Existing Block / Existing IXL New Electronic IXL or New Electronic interface Legacy Signalling Systems SSC SCMT ATP National Systems ETCS L1 ETCS L1 + Radio Infill ETCS L2/L3 ATC/ATO Interoperable Systems

ERTMS Migration with an initial overlapping of SCMT: TEN-T Corridors, HD Urban Nodes and Regional Lines Per i Corridoi interoperabili Satelliti GNSS GSM-R BTS and SCMT Existing 12000 km RBC + DAS IXL electronic SCMT Train (5000) ETCS Train ETCS ETCS X SCMT ETCS L2+L3 functionalities for High Density ERTMS Virtual Balise ETCS L2 Telegram | Packet 44 (SCMT Data) Euro Balise Possible dismission light signal and SCMT only when all RUs train will be equipped by ERTMS SCMT same Eurobalises and Encoder of ERTMS

ACC-M RBC SCC/CTC ERTMS Regional ERTMS Regional: different scalable options ACC-M RBC SCC/CTC ERTMS Regional only HW/SW Comand and Control track equipment via radio Level 2 with GSM-R Level 3 with GSM-R TLC without GSM-R (Satellite , Public Bearer) Virtual Balise (Satellite GNSS)

ERTMS on Regional Lines: Occasion for a new CCS Strategy Upgrade of IXLs according to RFI internalization criteria IXL+CTC+ETCS L3 without fall-back system, lateral signalling and train detection system both in line and station IXL+CTC+ETCS L2 +Train integrity without fall-back system, lateral signalling and lineside train detection system Pilot line Avezzano-Roccasecca ETCS L3 + GNSS Pilot line Pinerolo-Sangone STA Merano-Malles ETCS L3 + GNSS+ ATO ETCS L2 + GNSS ETCS L2 without fall-back system and lateral signalling Pilot line ? Trial Site Cagliari-S.Gavino LFI Arezzo-Stia Arezzo-Sinalunga

National Implementation Plan highlights TRK deployment criteria Type of service Baseline Level HS 2 (at least up to 2020) 2 Conventional main lines 3 2 (preferably) or 1+radio infil or 1 (last mile or according to IXL upgrade strategy) Urban 3 R2 2 with L3 functionalities (train integrity) Regional 2 or 3 with possible introduction of Satellite technology and ATO Border Crossing According to bilateral agreement

Class B dismission criteria NIP Class B dismission principles Type of service Class B dismission criteria New HS lines ERTMS without Class B fallback Existing HS lines not already equipped with ERTMS (Roma-Firenze) Upgrade to ERTMS and contextual Class B decommissioning Conventional main/urban/border crossing line ERTMS overlayed to existing Class B; Class B decommissioning starting from 2026 On specific case (e.g. regional applications) Class B decomissioning can be anticipated upon IM and the relevant RUs specific agreement

Key role : Decommissioning Class B 1st Scenario Quick migration Line with all Fleet with ETCS Economical convenience for IMs Lower Cost of Ownership Decommissioning Class B Eg. ETCS L2 vs SCMT : 4 time Ownership cost saving Incentive for RUs New digital interlocking at low cost without management of light signal ETCS L2/L3 Interoperability and Innovation maximasing performances for all CCS not only for ETCS Eg. In Bologna High Speed Station (4 Track) we increase with only ETCS L2 5 slot/day reaching an Economical Gain of 15M€/year

Key Role: Decommissioning Class B 2nd Scenario Slow migration Line without all Fleet with ETCS No economical convenience for IMs Maintain Class B Maintain electro-mechanical interlocking New digital interlocking high cost management of light signal ETCS L1 Overlapped Class B ETCS L2/L3 Overlapped Class B Only for interoperability But reduced capacity and performances

How to make ERTMS more attractive ? Financing tool Reducing CCS cost: ERTMS without national legacy system can help to reduce the cost of the IXL !

Class B Decommissioning & New Logic for of IXL today tomorrow 1° version National ATP Class B & ERTMS No ATP ERTMS & NEW IXL Logic Same IXL Logic Same IXL Logic IXL Logic 80 years !! Mechanical IXL Electro-mechanical IXL Electronic IXL

Sustainable Trackside- Trainborne for ERTMS migration Revenue ERTMS (increase slot \ performance)* Cash Flow Eg.: Bologna AV Case: Station with only ETCS L2 on Trackdside : Solution for new commercial request : 5 new slot/day. For a revenue for RFI of 18M€/year ERTMS Cost Maintenance ERTMS Cost Maintenance ERTMS Cost Maintenance Time X(*) CCS Class B Cost Maintenance CCS Class B Cost Maintenance Financial balance is achievable only with a RUs quick migration to ERTMS. It could reduce the time of an expansive double maintenance cost (CCS Classe B + A) for IMs (this is comparable to the investement cost on ERTMS Trainborne) . This contribute also to a quick payback of the trackside investement for IMs using all of the possible ERTMS performance. 4X ERTMS Cost Investement Quick Migration to ERTMS for existing Train Running (with temporal rules):Money from State/IM using also PPP) (*) Data from RFI official Database( InRete 2000) : maintenance cost for year for ETCS L2 on High Speed Line equal at a quarter respect a High Speed Line (Fi Roma) with ClassB (SCMT and Bacc) Progressive Decommissioning Classe B on the network