MAUVE CO2 cooling review

Slides:



Advertisements
Similar presentations
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI.
Advertisements

CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Time Stamping and archiving of PLC data
UNICOS Objects (CPC) 11/02/14 UNICOS, CERN1 CERN, EN/ICE, UNICOS Team.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
IBL CO 2 UNICOS CPC6 based control system Lukasz Zwalinski – PH/DT/PO.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
(C.Betz Kick-Off Meeting Vacuum 5th March 2013) Agenda: First steps using WinCC OA First steps using UNICOS V5 Vacuum Test Rig Principles of.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
60kW Thermosiphon control system
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
Alice TOF Production Readiness Review Gas Control Systems.
Internship final report Joanna Staniszewska Cracow University of Technology –
UNICOS-CPC course - CERN EN/ICE Industrial Controls Engineering Department Deployment of the CPC6 control application Marc Quilichini
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
- My application works like a dream…does it. -No prob, MOON is here. F
Combining safety and conventional interfaces for interlock PLCs
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
UNICOS Application Builder Architecture
Experience in Design and Implementation of CO2 Cooling Control Systems
IBBelle: Status & Plans
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC architecture UCPC 6 UNICOS-Continuous Process.
Status & Plans for WA105 Control System
FCT and CERN Portuguese Trainee Programme Report
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
Control Logic for ATLAS Thermosiphon chiller brine and water circuit
Forum on Tracking Detector Mechanics - Bonn, May 2016
Tracker cooling loop “check out” draft for discussion
How SCADA Systems Work?.
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 4: SCADA UCPC 6 UNICOS-Continuous Process Control Check.
Control systems Detector Safety System (DSS) (no action available for an operator) Display of CERN Level 3 alarms and protection of NA62 hardware Detector.
by Prasad Mane (05IT6012) School of Information Technology
SC1R Cold Box PDR Controls
Robert Gomez-Reino Garrido
November technical stop activities:
Experiment Control System
Pierluigi Paolucci & Giovanni Polese
Operation of Target Safety System (TSS)
Vacuum Control System for Monolith Vacuum
Presentation transcript:

MAUVE CO2 cooling review - 2017 MAUVE control system L. Zwalinski, L. Davoine – CERN EP/DT/FS November 1st, 2017 European Organization for Nuclear Research (CERN), CH-1211 Geneva 23, Switzerland MAUVE CO2 cooling review - 2017

Control system architecture Data Server ready in CCC cs-ccr-dclhcb 4 cabinets Architecture: 3 cabinets: 1800x1200x400 1 cabinet: 1800x600x500 MAUVE CO2 cooling review - 2017

DIP communication with DCS Released the CPC-COMM Wizard with RP 1.2.0 and WinCC OA CPC Component 6.4.0. by BE-ICS supporting: Additional protocols: SNMP and DIP (in addition to existing BACnet, OPC UA, CMW, S7 polling and Modbus polling). Alarms on WordStatus and AnalogStatus objects. Value (message) conversion for AnalogInput and AnalogStatus objects. We can subscribe to DIP in UNICOS cooling application to display and archive detector temperatures in one common SCADA system. New tool creates data points in our SCADA application. PLC does not see this values. It can be used for monitoring and manual operation purposes. Further development has been requested by EP-DT to BE-ICS to allow for bridge DIP values received from DCS to cooling PLC. MAUVE CO2 cooling review - 2017

Control cabinets design Master - cabinet 1 UT - cabinet 2 Velo - cabinet 3 VFD - cabinet 4 Master control CO2 plant + backup chiller CO2 plant + backup chiller 2x CO2 pumps Each cabinet will be equipped with its own local EMS button. MAUVE CO2 cooling review - 2017

Control cabinets design Master - cabinet 1 UT - cabinet 2 Velo - cabinet 3 Power distribution and redundant hot swappable 24V DC PS PLC and distributed I/Os Power handling (heaters, compressor, etc.) Signal handling and analog valve drivers equipped with battery pack for safety position FESTO pneumatics distribution and valve islands MAUVE CO2 cooling review - 2017

Control cabinet design Power Distribution Discussed & agreed 6 months ago To be validated by EN/EL EBD EXD General Power Experiment Power ESD Backup by a Diesel if EBD lost Transfer switch Automatic UPS Master - cabinet 1 UT - cabinet 2 Velo - cabinet 3 VFD - Cabinet 4 MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 Electrical design AutoCAD electrical design is on going. It is very much advanced. So far we have 57 pages for VELO & UT control/electrical cabinet. MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 Cable schedules Cable schedules both for internal plant cabling and JB & DB are ready with internal naming convention. The LHCb cable DB scheme is under preparation. We have well received template from Laurent. MAUVE CO2 cooling review - 2017

Process break-down and operation modes Control software follows CERN UNICOS CPC6 framework standard as all the other CO2 cooling systems at CERN. Operation System has been demanded to run in nominal conditions = operation option mode: UT system is demanded to start in Operation Option Mode Velo system is demanded to start in Operation Option Mode Interconnection valves stay close   UT active, Velo passive System has been demanded to run in back-up scenario with UT plant providing CO2 for both detectors: UT system is demanded to start in Active Option Mode Velo system is demanded to start in Passive Option Mode Interconnection valves will open UT passive, Velo active System has been demanded to run in back-up scenario with Velo plant providing CO2 for both detectors: UT system is demanded to start in Passive Option Mode Velo system is demanded to start in Active Option Mode MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 Normal Operation MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 UT Active, Velo Passive MAUVE CO2 cooling review - 2017

Normal Operation with Backup Chiller requested If primary chiller DI is OFF (positive logic) then backup chiller will be ON. DSS signal to be discussed with Olivier when BackUp Chiller is ON. MAUVE CO2 cooling review - 2017

Allowance table for CO2 PCO The CO2 system can change it’s operation mode only when system is stopped. In case of need to operate in active/passive scheme system shall be stopped and restarted in desired option mode. Option Mode Operation UT act Velo pas UT pas Velo act x MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 User Interface panels Work on interface panels has started MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 Alarms philosophy Damper electrical heater: Alarm level I – Temporary Stop Interlock - heater interlocked if T > 120 °C, restarted when T < 120 °C Alarm level II – Full Stop Interlock - heater interlocked if T > 140 °C, waiting for acknowledge * & T < 120 °C Alarm level III – Hardware Interlock (thermal switch) – all heaters interlocked (mechanically), waiting for acknowledge * & T < 120 °C & thermal switch OK Alarm levels: Alarm level I Warning Group Alarm level II Full Stop Group Membrane CO2 liquid pump: Alarm level I – Temporary Stop Interlock - pump interlocked if membrane P > 5.0 bar, restarted when P < 5 bar Alarm level II – Full Stop Interlock – pump interlocked if membrane P > 10 bar, waiting for acknowledge* & P < 5 bar MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 Alarms philosophy UT Alarm groups Velo Alarm groups Main CO2 Alarm groups DSS interlock MAUVE CO2 cooling review - 2017

CO2 main plant – alarm groups Plant Full Stop Interlock: occurs if any of the Process Alarms triggered Main PCO is interlocked no automatic restart alarm indication (mail or/and SMS) Plant Warning: occurs if any of the Process Alarms triggered alarm indication only (mail or/and SMS) MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 UT plant – alarm groups ALARM GROUPS: Plant Communication Pump Electrical heater Pressure Valve Temperature Sensors Filters Manifold MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 UT plant – alarm groups UT Warning: occurs if any of the Process Alarms triggered alarm indication only (mail or/and SMS) UT Full Stop Interlock: occurs if any of the Process Alarms triggered Bpix PCO is interlocked no automatic restart alarm indication (mail or/and SMS) MAUVE CO2 cooling review - 2017

MAUVE CO2 cooling review - 2017 Conclusions Control cabinets 3D CATIA design completed. The electrical design is well progressing. Electrical components mostly selected. Material procurement starts now. FA under preparation. CCC SCADA server ready. SCADA UIs under construction. MAUVE CO2 cooling review - 2017