SC of KM3 Vidyo meeting of Thursday, February 18

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

January 6. January 7 January 8 January 9 January 10.
Chubaka Producciones Presenta :.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
KM3NeT-IT The Capo Passero Infrastructure M.Anghinolfi –INFN-Genova.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Walls crates cables gas chambers electronics CERN adb.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Ans Pardons (with input from Jean-Marc Cravero) CERN CNGS Horn Experience (issues since NBI2010) Ans Pardons, CERN 1 NBI2012.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Angelo Orlando for the NEMO collaboration VLV T08, Toulon, France April International Workshop on a Very Large Volume Neutrino Telescope for.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
05/07/2010P. LamareBackbone dry solution Dry backbone requirements.
P. Timmer Nikhef Amsterdam Afd. ET. Acceptance test 400V – 12V DC-DC converter Chroma DC Electronic load Delta Elektronika SM 400-AR-4 400V 2A.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
Progress on the Vertical Electro- Optical Cable P.Kooijman UU/UVA/Nikhef.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
KM3NeT-Italy Collaboration meeting 28/11/2014 Sistema di trasmissione dati su fibra ottica: Junction Box Sara Pulvirenti.
S A Griffiths CM42 June 2015 Electrical & Control.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Status Optical System KM3NeT
On behalf of Patrick Lamare
QXF Coil Fabrication & Tooling Reaction / Impregnation
Concluding remarks E. Migneco
Catania Jan ’14 KM3NET Italy Marine Operations CTF change out
LS1 Committee January 24th, 2014
ATF2 Magnet Power Supplies
Teleconference ACS – FREIA 17th October 2017
Mini-drawers, FE-ASIC , Integrator
Junction Boxes for KM3NeT
Teleconference ACS – FREIA 31st October 2017
Renovation of the 45-year old PS magnets
FY16 Budget Build (Banner)
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
WP Coordinaten XFEL RF Operation
Reading Management Binder ©
Final (?) line_0 configuration (follows steering group consideration 5/5/2004) Line Zero meeting, Nov
TEST PLANS for HL LHC IT STRING
Teleconference ACS – FREIA 20th February 2018
13-block rotation schedule
Detonating Cord Assembly (DCA)/ Thin Layer Explosive (TLX) Delivery Delays & Performance Issues Ben Kerlin, CAD/PAD, In-Service Engineering Detonating.
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
McDonald’s calendar 2007.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
McDonald’s calendar 2007.
Hardware Commissioning
2015 January February March April May June July August September
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

SC of KM3 Vidyo meeting of Thursday, February 18 The km3-IT sea bed infrastructure The new CTD & IL cables The optical pod in the JB Deployed tower & JB status

The NEW cable termination Frame As in February ODI items: test on Mach 3. DC/DC converter (MVC): test on March 6 Assembly: Mid March Acceptance Test of the CTF: last week of March New CTF present delivery time: first week of April As in December Dec. 17: meeting in Billund to try to anticipate time schedule Present delivery time: end JUNE ODI items delivery time: 1st week of April New CTF delivery time : try to anticipate to the end of April 

Special interlink cables (9AWG) from CTF to JBs Mail from Euroceanique to Riccardo on January Delivery date : 20th of March2015 P/N 1090516 (interlink type 1 – 390m) qty : 1 P/N 1090517 (interlink type 1 – 310m) qty : 1 P/N 1090515 (interlink type 1 – 590m) qty : 1 – P/N 1090518 (interlink type 1 – 130m) qty : 1

Assembling test of the optic pod

Insulating EDFA fom the backplane Thin (0.2 mm) insulating MICA sheet

Gannt

Status of the JB and of the Tower already deployed Deployed and immediately operational on November, 17th Initial status: nominal conditions; 2 out of 84 OMs with zero signal (but PMTs base active no water inlet on the spheres) On November 25 we observe an increase of the current on the 375V line to floor #6 : from 20mA nominal to the upper acceptable limit of 80 mA. In these condition the PCS electrically disconnect the floor. No evidence of anomalous behavior on the current, (low) voltage, temperature, humidity on the floor control module before this increase. Similar behavihour observed in the other floors during the following weeks. (more than one half of the floors) No evidence of recovery when switch OFF/ON sequence is applied

Current intensity@375V on floor #12 measured in the base of the tower ? Current intensity@375V measured in the JB ~ 40’ time interval

Detailed investigation of possible reasons of the fault are underway Test in pressure water tank of the backbone Test of the full power configuration from tower base to one floor The second full integrated tower will be switched on Recovery of the full tower planned during next sea operation, March 16

JB status till early February: 1 output on (tower) , 7 outputs off. February 5th: 7 output from OFF ON to check possible curren leaks. Vout=375V, Iout=0 mA February 9th: set current upper limit on Power Control Board to 50mA on all 375V lines This limit is too low for the power supply of the 4 EDFAs in the OPTIC pod ↓ no more communication with JB was possible system is no more under control decide to switch off the MVC

This is a severe error PARTIALLY due to lack of man power and pressure on deployment date However, the JB did not suffer any damage. Can be cured during next sea operation with JB on board to allow reconfiguration Unconfortable situation but: Recovery and redeploy of JB scheduled on March, 16 (should be easy) Recovery of the tower scheduled in the same sea operation (more difficult) Power shorts @375: should be easy to identify Power cut will allow to complete power cabinet installation at the shore station