From CONT to VGOS: The Evolution of the CONT Campaigns

Slides:



Advertisements
Similar presentations
2012 DiFX user’s meeting, Sydney, Australia USNO Software Correlator: Status Report Outline USNO/WACO Background USNO Prototype Software Correlator (UPSC)
Advertisements

(Station Dependent) Correlation in VLBI Observations John M. Gipson NVI, Inc./NASA GSFC 4 th IVS General Meeting 9-11 January 2006 Concepcion, Chile.
E-VLBI over TransPAC Masaki HirabaruDavid LapsleyYasuhiro KoyamaAlan Whitney Communications Research Laboratory, Japan MIT Haystack Observatory, USA Communications.
In Voice. Details are as follows: 30 minute sessions are available 30 minute sessions are available Recording sessions will start at 8 AM Recording.
The ICRF, ITRF and VLBA Chopo Ma NASA’s Goddard Spaceflight Center.
RECENT ENHANCEMENTS TO THE CDDIS IGS Network Systems Workshop November 2-5, 1998 Annapolis, MD Carey E. Noll Manager, CDDIS NASA GSFC Greenbelt, MD.
02/6/ jdr1 Interference in VLBI Observations Jon Romney NRAO, Socorro ===================================== 2002 June 12.
The current status of K5 eVLBI intensive session Takashima, Kazuhiro; Machida,Morito; Fujisaku, Junichi; Kokado, Kensuke; Shigematsu, Hiromi Geographical.
A Global 86 GHz VLBI Survey of Compact Radio Sources Sang-Sung Lee MPIfR In collaboration with A.P. Lobanov, T.P. Krichbaum, A. Witzel, J.A. Zensus (MPIfR,
© 2015 AQA. Created by Teachit for AQA Tropical storms – what is the link? Hurricane Katrina 2005 © NASA Goddard Space Flight Center
National Aeronautics and Space Administration Code 592 Systems Engineering Seminar - FAQs.
Aims of the session To share important information about KS2 SATs
Climate graphs LO: To be able to construct a climate graph for the tropical rainforest. To extract information from graphs and use it to explain climate.
e-VLBI: Creating a Global Radio Telescope via High-Speed Networks
Monthly Report For January 2017
The Institute of Applied Astronomy of the Russian Academy of Sciences Operating experience of Data Transmission and Buffer System. Research of.
Direct Your Future™ Module 1: Scanning the World of Possibilities.
The Seasonality of Belief:
Space Geodesy Branch Highlights, August 2002 CONT02 VLBI Campaign
ATS-C: What could have been
Instrumental Surface Temperature Record
Haystack Geodesy Program and Technical Development
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Graph Types Class A Class B.
Sharing of Best Practices
Average Monthly Temperature and Rainfall
The School Point of View
FY12 Budget and Caseload Update Fiscal Committee February 6, 2012



Instrumental Surface Temperature Record


Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Chemical Industry in Europe – Trends

FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Copyright © … REMTECH, inc … All Rights Reserved

Direct Your Future Module 1: Scanning the World of Possibilities.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March



©G Dear 2008 – Not to be sold/Free to use
CA3 Retrieves Coherent Representations from Degraded Input: Direct Evidence for CA3 Pattern Completion and Dentate Gyrus Pattern Separation  Joshua P.


Shanghai VLBI Center Activities

©G Dear 2010 – Not to be sold/Free to use
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
New and Distinct Hippocampal Place Codes Are Generated in a New Environment during Septal Inactivation  Mark P. Brandon, Julie Koenig, Jill K. Leutgeb,

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Nataliya Zubko, Jyri Näränen, Markku Poutanen
B O N U S P L A N.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
MICE, MUSIC, & MAZES. MICE, MUSIC, & MAZES We have been running mice through mazes since we figured out they both started with M, which was quite a.

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Average Campaign Contributions by Type of Candidate (2008)
Presentation transcript:

From CONT to VGOS: The Evolution of the CONT Campaigns C. C. Thomas, D. Behrend, and D. S. MacMillan NVI, Inc., Code 698, NASA Goddard Space Flight Center, Greenbelt MD, 20771 INTRODUCTION SIZE OF THE CONT CAMPAIGNS The chart shows the general increase in several measures of the size of the CONT Campaigns. The station average scans per hour were better in CONT08 than in CONT14, but CONT14 had five more stations than CONT08. That is why the number of session observations in CONT14 was much higher than previous CONTs. The average data per station per day was largest in CONT11. Continuous VLBI Campaigns (CONT) started in 1994 with the goal of demonstrating state of the art VLBI over a continuous period of time. The first CONT was followed by campaigns in 1995 and 1996. After a six year hiatus, CONT campaigns were organized approximately every three years from 2002 through 2014. 1994‒2014 CONT NETWORKS The networks of the CONT Campaigns have continued to improve over time. There were two campaigns with dual networks (CONT94 and CONT96). We are in the planning stage for CONT17 and are considering having two networks run simultaneously: one network with legacy stations and one with VGOS stations. Then the CONT20 Campaign may have VGOS stations only. Campaign #stations Period Comments CONT94A, CONT94B 7(A), 7(B) Jan 12‒24 Two independent networks running simultaneously: non-VLBA stations in A and VLBA in B CONT95 6 Aug 23‒28 Six-day campaign CONT96A, CONT96B 5(A), 12(B) Sep 2 ‒ Nov 15 11-week campaign. First eight weeks, observe bi-weekly, one week no observing. Two simultaneous networks during the last two weeks, one five-station and one 12-station (10 VLBA + 2 non-VLBA) CONT02 8 Oct 16‒30 15-day campaign CONT05 11 Sep 12‒26 CONT08 Aug 12‒26 CONT11 13 Sep 15‒29 CONT14 17 May 6‒20 15-day campaign (2 stations at Hobart) CONT17 26 Planning phase Two networks running simultaneously, one with ~19 legacy stations only and one with ~7 VGOS stations only. CONT20 up to 26 One network with VGOS stations only as a test bed for VGOS continuous observing. EOP FORMAL UNCERTAINTIES The EOP formal uncertainties steadily improved after CONT02. This was due to larger networks and increased recording rates. FREQUENCY OF USE Thirty-five stations have contributed to CONT Campaigns in the last 20 years. The map shows how many times a station participated in a CONT Campaign. There have been eight CONT Campaigns so far. Two stations, Wettzell and Kokee, have participated in all eight campaigns. The global coverage of the CONT Campaigns improved with more coverage in the south. CONT17 The plan is to have the next CONT Campaign in late 2017 (or early 2018). We want to have as many VGOS stations (red triangles) as possible observing simultaneously with the legacy stations (blue triangles). As mentioned earlier, a vast amount of resources will be needed to support this campaign. Currently only the Haystack correlator can process the VGOS data. So, we may need two correlators to process the data. Mark 6 modules need to be purchased to support the VGOS observing. Depending on the recording rate, additional Mark 5 modules may need to be purchased as well. MEDIA AND CORRELATOR RESOURCES The CONT Campaigns used, and will continue to use, a large amount of resources: station time, tapes or modules, and correlator time. From the display below, one can see how much correlator time was used to support the CONT Campaigns. This required that all other sessions except the IVS-R1s and IVS-R4s were not processed until the CONT Campaigns were completed. The text in black is for pre-IVS CONTs. The CONT14 Campaign was processed with the DiFX Correlator in 38 days. This was a significant improvement from previous CONT Campaigns. CONT20 We are also considering having a pre-VGOS Observing Campaign for CONT20. This would be 15 days of VGOS only observing to determine if the stations and the correlators can handle continuous VGOS observing. This will test the bandwidth for e-transfers along with module shipments. This also means that each station will have to be able to record continuously while sending their large volumes of data to the designated correlator(s). CONT94 41 Sources Thin Tape Haystack CONT95 34 Sources Washington CONT96 40 Sources (non-VLBA) 44 Sources (VLBA) VLBA CONT02 50 Sources Westford (Module) Bonn - 58 Days Hays - 89 Days Wash -45 days CONT05 74 sources Modules Bonn-50 days Hays-81 days Wash-68 days CONT08 80 sources 163 days CONT11 117 sources 146 days CONT14 73 sources Bonn 38 days 2016 IVS General Meeting in Johannesburg, South Africa Email: cynthia.c.thomas@nasa.gov