SLS AREA REPORT Goal: Next Generation Uplink WG

Slides:



Advertisements
Similar presentations
A General Purpose CCSDS Link layer Protocol Next Generation Data Link Protocol (NGDLP) Ed Greenberg Greg Kazz 10/17/
Advertisements

Common Coding and Synchronization Layer: Next Steps NASA Optical Communications Working Group 17 April /9/20151.
1 October 2009 Cross Support Transfer Services (CSTS) Future Services as of Spring 2014.
1 16 June 2006 Space Link Services Area report to CESG Rome, Italy, 16 June 2006 J.L. Gerner / G. Moury.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Fall Technical Meeting, Bordeaux (BOD) 4/15-18/2013 SLS-CS_13-03 Separating Coding from Framing V. Sank, H. Garon - NASA/GSFC/MEI W. Fong, W.
Next Generation Uplink Action Item Responses Drilling Down one level to Understand Implications on Next Generation Uplink.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
07-Apr-2014-cesg-1 Gian Paolo Calzolari (AD) Gilles Moury (DAD) Fall 2014 Meeting London (United Kingdom) SPACE LINK SERVICES (SLS) AREA Gippo / Gilles.
Next Generation Space Link Protocol – Raison d’etre Greg Kazz Ed Greenberg SLS-SLP WG Fall 2013 CCSDS Meeting - San Antonio, TX, USA.
CCSDS Security WG meeting October 2008, hosted by DLR at DIN premises (Berlin) 1 Data Link Security BOF An ESA contribution on Lessons Learned and Issues/Questions.
CCSDS Unified Space Data Link (USLP)
NGU Proposed revision of recommendation CCSDS (401-B-20) on TC bit rate NGU WG Fall CCSDS Meeting - London UK - Oct 25, 2010.
March 7, 2008Security Proposal 1 CCSDS Link Security Proposal Ed Greenberg Greg Kazz Howard Weiss March 7, 2008.
RF&Mod services from CIS-Lunar WG Single access? Multiple access? –To/from several s/c simultaneously from one station? (many to one) This might be useful.
Cesg-1 4 November 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
1 23 January 2007 Space Link Services Area report to CESG/CMC Colorado Springs, USA, 24 January 2007 J.L. Gerner / G. Moury.
FSH/security SLS-SLP fall2009 (version 4) Page 1 Security Headers + Homogeneous approach to FSH and Insert Zone in TM/AOS/TC frames: some problems and.
Proposal for a TC-2 Protocol Ed Greenberg Greg Kazz Oct /27/20151.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
1 Space Link Services Area report to CESG/CMC Darmstadt, Germany, 9 October 2007 J.L. Gerner / G. Moury.
The CCSDS Cislunar Communications Architecture Keith Scott The MITRE Corporation CCSDS Meeting January 2007.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Cesg-1 28 April 2009 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA.
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
SLS-CS_12-05 Some results on NGU coding schemes
From you host … Dr. H. Introduction Communications design requires us to think about the following issues: Communications design requires us to think.
Proposal for a Proximity-2 Protocol Ed Greenberg Greg Kazz May /11/20161.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
April Space Link Services AREA REPORT 15 April 2005.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
Why we need USLP Greg Kazz Ed Greenberg November 9-10, 2014 CCSDS Fall London Question: Why the change of name from NGSLP to USLP? Answer: 1) In time the.
National Aeronautics & Space Administration European Space Agency & 1 Modulation and Coding: Draft IOAG Resolutions to CCSDS September 9, 2008 Les Deutsch.
CCSDS Telecommand Sync and Channel Coding Specification using advanced Block Codes Ed Greenberg NASA/JPL Oct. 15,
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Next Generation Uplink Options already within our Grasp
SPACE LINK SERVICES (SLS) AREA
Engineering Steering Group: CCSDS Management Council
Why we need USLP Greg Kazz Ed Greenberg November 9-10, 2014
The CCSDS Security WG is chartered to:
SOIS Area Report Wireless WG Primary Objectives for the fall meeting
SLS-CS_12-05 Some results on NGU coding schemes
Next Generation Uplink Action Item Responses
Adam Schlesinger NASA – JSC November 3, 2011
244-6: Higher Generation Wireless Techniques and Networks
SPACE LINK SERVICES (SLS) AREA
Global Science and Technology, Inc., Greenbelt, MD, USA
CCSDS Systems Engineering Area: Security Working Group
Joint Meeting of the CCSDS and the OMG-SDTF
SPACE INTERNETWORKING SERVICES (SIS) AREA
SLS-CS_13-02 High Data Rate (Gbps +) Coding Architecture
Service, Physical, and Protocol View Document Figures
How Updated CCSDS Protocols can Simplify Data Formatting for the Constellation Project Ed Greenberg Greg Kazz.
Short Uplink LDPC Codes: Proposed Methods
SLS-RFM WG deadlock over
SLS-CS_13-03 Separating Coding from Framing
SLS-CS_16-12 Terminology Used with Sliced Transfer Frames
Fall CCSDS Meeting - London UK - Oct 25, 2010
Security WG: Report of the Fall 2013 Meeting
BITTT and CCSDS in China
SLS AREA REPORT November 2004 November 2004.
Next Generation Space Link Protocol – Raison d’etre
Joint IPR/DAI Workshop
CCSDS Link Security Proposal
Adam Schlesinger NASA – JSC November 3, 2011
Atlanta, Georgia, USA, 16 September 2005
Ed Greenberg Greg Kazz 10/17/2012
SPACE LINK AREA MID-TERM REPORT
Presentation transcript:

SLS AREA REPORT Goal: Next Generation Uplink WG Develop a Green Book for Next Generation Uplink (NGU) application profiles. Whenever possible incorporate new requirements into existing Blue books supported by the RF & Modulation, Channel Coding & Synchronization, and Link Layer protocol WGs. If incorporation into existing Blue books is not possible, determine if a new Magenta or Blue book needs to be written. WG Status: Active X Idle ____ WG Summary Situation: Good progress. status: OK CAUTION PROBLEM comment: Good progress March 2008

SLS AREA REPORT NGU WG (cnt’d NGU has handed down requirements to RF&MOD, C&S, and SLP to provide the blue book sections for the File Upload application profile i.e., for data rates > 256 Kbps to 2 Mbps. (extending existing TC standard) Action items assigned to RF&Mod, C&S, SLP chairmen during joint meeting RF&Mod to examine how to specify multiple access to spacecraft from one antenna on the uplink Ground sends commands up to 4 spacecraft on one frequency Spacecraft sweeps to acquire the uplink Independent transponder ratio used for each spacecraft to telemeter, range, and use Doppler. March 2008

Major Findings: If a stronger code (stronger than the current BCH) was standardized for Telecommand, missions could in principle could uplink to their spacecraft at higher rates using AOS, TC, Proximity-1. Currently no one in NGU WG can envision any agency need to simultaneously range and command on the same channel. Therefore, NGU plans on keeping ranging and telecommand on separate physical channels. Need support from the RF&Mod WG, in ensuring that CCSDS 401 contains the requirement to allow for Multiple Spacecraft per Aperture (MSPA) on the uplink. In this case, the ground transmits up to a maximum of 4 spacecraft simultaneously using a single frequency and the spacecraft sweeps the uplink(instead of the ground) to acquire and each spacecraft has it’s own transponding ratio. In the 32-34 GHz band, apparently multiple discrete turnaround ratios have been defined. The bands where these assignments need to occur are: X-band 7/8 GHz, Ka-band 34/32 GHz, Ka-band 40/38 GHz. Also CSS Forward CLTU service maybe impacted since, with the ground servicing up to 4 S/C within a single beam of an antenna, multiple POCCs maybe supplying the telecommand data to uplink. Also since the data maybe files, ARQ maybe returned from all 4 spacecraft affecting the CSS Return services. This needs to be confirmed with CSS. March 2008

Major Findings Continued: Major discussion on decoupling the frame layer from the coding sublayer for CCSDS Telecommand. Migration path identified for ESA to keep the BCH code and simultaneously run the LDPC code in the physical layer. At some future time, drop the BCH code and keep the LDPC code. This approach provides up to 8dB gain over the BCH. Only issue to resolve is how to do time correlation. Time tagging must be done in the coding sublayer i.e., One of the bits of the ASM of block code would need to time stamped., due to undeterministic delays between frame layer and coding sublayers. Time stamps would be saved into files by both the receive and send sides. Note that NASA MSL and LDCM already have implemented this capability. Strong support by NASA Mars Program has been requested of CCSDS to evaluate this proposal for standardization – in particular in light of international cross support at Mars for 2016 mission set and beyond. Note by decoupling the data link layer from the coding sublayer, it makes it possible for the coding sublayer and physical layer to be coupled, and keep the data link layer independent of both of them. This is to take advantage of advanced modulation techniques tied to channel coding. March 2008

Major Findings Continued: Application profiles have been prioritized by NGU for future requirements definition and assignment to other WGs. Priority of work is: 1) File upload (current), 2) Emergency Comm, 3) Human Support NGU to relook at CMLP study report to mine it for more potential requirements. Definition of discrete steps of data rates for the file upload profile seem to be needed and steps of 1.5 dB have been proposed for the file upload profile. March 2008

Problems and Issues: SLS AREA REPORT None Next Generation Uplink WG (cnt’d) Problems and Issues: None March 2008

Planning : SLS AREA REPORT Next Generation Uplink WG (cnt’d) Planning : NASA to provide a timeline for when the high rate file upload application profile is needed. Green book descriptive information needs to be gathered for the file upload profile Once the File upload profile is completed, the next profile should be worked on by NGU RF&MOD WG to provide multiple transponding ratios to allow for Multiple Spacecraft per Antenna on the uplink in the bands reported in this report March 2008

Resolutions : None at this time. SLS AREA REPORT Next Generation Uplink WG (cnt’d) Resolutions : None at this time. March 2008