Damien Tan Andreas Toh Roy Chia Tavence Heng

Slides:



Advertisements
Similar presentations
Lecture Network Analysis
Advertisements

TK3333 Software Management Topic 7: Schedule Control.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
5.8 Project Management Chapter 37 HL - Only.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapter 12: Planning for Electronic Commerce
Chapter 12: Planning for Electronic Commerce Electronic Commerce, Seventh Annual Edition.
Roberta Russell & Bernard W. Taylor, III
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Chapter 12: Planning for Electronic Commerce Electronic Commerce, Sixth Edition.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
You are part of the sports committee in your school and so it is your responsibility to organise this year’s swimming gala. There are many tasks that.
Pre-Project Components
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Brent Tufts Alex Ferreira Drew Durham Arnie Anderson Vinitha Liyanage.
Advanced Project Management Tools and Techniques of Project Planning Ms. Ghazala Amin Slides Courtesy: Dr. A Z. Khan.
Careers in Distribution, Copyright 2005, WERC Careers in Distribution Management Jobs.
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
Project Management Why do projects fail? Technical Reasons
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Scheduling and Budgeting Engineers Without Frontiers CEE 402.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Presented by: Andrea Miller, PMP. Objectives Understand your project's risk How to plan your contingencies How to identify when your contingencies should.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Purchasing Suppliers.
Roles and responsibilities PM
Chapter 12: Planning for Electronic Commerce
ECE362 Principles of Design
Project Management Operations -- Prof. Juran.
Critical Path Method(CPM)
The Business Plan : Creating and Starting The Venture
Maintenance Scheduling
The Business Plan : Creating and Starting The Venture
PitchTOWN Rocket Pitch Template
Project Scheduling Lecture # 1.
Project Management and Information Security
Hospital Establishment
PitchTOWN Rocket Pitch Template
Project Management for Business
An-Najah National University
Activity Planning.
Chapter 3 Managing the Information Systems Project
MAINTENANCE PLANNING AND SCHEDULING
Quality Management Systems – Requirements
Welcome to your final year at school!
Theory, Tools, and Obstacles
Software Project Management
SE Tasks for a Concept Development Project
Project management Lecture 9
NIKE Inc. Project Failure in Year 2001
Analysing the AoA network
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Project management Learning Unit 5.
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Project Management CPM/PERT Professor Ahmadi.
CPA – Information Sheet
Analysing the AoA network
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Multiple dependency activity on node (AoN) networks
Conventional Facilities
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
The future for plant hire… the Hewden perspective.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Damien Tan Andreas Toh Roy Chia Tavence Heng DART Jetpack Damien Tan Andreas Toh Roy Chia Tavence Heng

Introduction The DART Jetpack project was started by 4 engineers in 2010. They wanted to merge business with engineering in their venture by trying to market their jetpack using skills learnt from Project Management.

Project Objectives Improve convenience in human lives Military usage

Scope of Project Estimated duration -Research (3mnths) -Brainstorm (1Month) -Planning/blueprint stage (2months) -Miniature Model (1month) -Trouble shooting (1month) -Prototype stage (2years)

Scope of Project Estimated cost -Planning stages $50 -Prototype stage $1000

Responsibility matrix Responsibility matrix Project leader  Damien Designer  Andreas Accountant  Roy Scheduler  Tavence

Current Issues Choose which way to start the jetpack - Fan - Chemical Reactions - Hydro Logistical problem Budget constraint Technological problems/inability Safety issue Jetpack stabiliser problems Human testing

Manpower requirements Overall In-charge Researcher Planner Operational In-charge Marketer Sales person Technician Logistics In-charge Production In-charge Safety In-charge

research

Work Breakdown Structure

Mindmap of Dart Jetpack

Dart’s Work breakdown structure

Cost Analysis Resources, $1,240,305.00 Human Resource, Manpower, $ 165,000.00 Marketing , $ 50,600.00 A.O.M, insurance, $ 110,000.00 Total Budget $ 1,565,905.00

Assumptions Number of workers 100 Price per jetpack $5,000 Life time company insurance Hiring of Public Relations Staff in media coverage Jetpacks sold per month 500 Amount of jetpacks made per month 500 Material cost per jetpack $2,000 The budget cost is per monthly basis sell to retailer to sell to public 10% contingency Total Income $ 2,500,000.00 ROI 60%

Project Scheduling Scheduling the Project Time Microsoft Office Project Listing the tasks Placing them according to tasks and sub tasks Placing them according to prerequisites Inserting the estimated Time for the tasks Generate the Gantt chart

AON Activity-On-Node (AON) Easier to see the Time allocation Easier to see the Predecessors.

AON Earliest Start Time (EST) : the early start of a project Duration : how long will this project completes Earliest Finish Time (EFT): EST + duration Latest Start Time (LST) : the latest time a project can start Latest Finish Time (LFT) = LST + duration Total Float = LFT – EST – duration 2 1 3 Create Prototype 6 4 7

OUR AON -It took us 153 days to for the production of jetpacks -Our assumption is 180days -Creation of prototype is the only predecessor for cost analysis and test of prototype 5 Rental of Factory Assumption 180 days 14 19 Install utilities 30 49 Renovation 7 56 Install Machinery 61 Recuriting of worker 91 Research 10 101 Design 8 109 Create Prototype 116 Test Prototype Cost analysis 6 122 9 Purchase Raw Material 21 143 Mass Production 148 Quality Check 153 Delivery 27 180

Probability (1=low, 5=high) Risk Assessment s/n Risk Description Probability (1=low, 5=high) Impact (1=low, 5=high) Ranking 1 Unable to locate factory site 5 7 2 Unable to find contractors 6 3 Delay in renovations 13 4 Faulty machinery during installation Unable to find skilled workers 14 Office worker demand more pay 22 security companies charges too high 23 8 Unable to find proper accomodations for production crew 24 9 Unable to hire qualified quality check crew 10 R and D crew demand too high a pay 11 Lack of technical knowledge 12 Inappropiate design 15 Not enough raw materials for prototype 16 Prototype malfunction Delay in shipments of raw materials 17 Unable to find supplier for raw material 19 Not enough raw materials for mass production 25 18 Lack of appropiate supervision while mass production stage Machinery malfunction during mass production 20 Production halted due to safety issues 21 Unable to meet quality check expectations Over budget Delay in delivery Unable to find repair crew Insufficient funds to pay for warranty

Top 5 risks -Machinery malfunction during mass production -Faulty machinery during installation -Unable to meet quality check expectations -Production halted due to safety issues -Prototype malfunction Rank Top 5 risks Probability (1=low, 5=high) Impact (1=low, 5=high) 1 Machinery malfunction during mass production 5 4 2 Production halted due to safety issues 3 Faulty machinery during installation Unable to meet quality check expectations Prototype malfunction Risks How probability can be reduced How impact can be reduced Perform frequent maintainence and checks Multiple production lines Implement stringent rules for workers to abide Stock up on products Getiing a reliable supplier Request for earlier delivery time Enforce quality standards for quality standard Increase the quality standards for the quality checks Thorough analysis of failures Have a backup team doing a prototype

Creation of prototype Video 1-fail launch Video 2-disintegrated rocket

Conclusion Gained valuable experience Know how to manage a project Hope to make this a reality

THE END THANK YOU