2008 ISOE EUROPEAN SYMPOSIUM. FI

Slides:



Advertisements
Similar presentations
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
Advertisements

11-Apr ISOE International ALARA Symposium JNES, Tokyo, JAPAN, August,2013 Presentation on: Dose Reduction and Management during Overhauling.
ISOE Information System on Occupational Exposure: An Overview Brian Ahier, Ted Lazo (ISOE Joint Secretariat, OECD Nuclear Energy Agency) 2007 Asian Regional.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
1 Successful decommissioning of a nuclear plant Evelyn Hooft Bart Thieren 20 june 2008.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
MODULE “STRATEGY DEVELOPMENT”
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Key outcomes of IRRS Mission in Finland Kirsi Alm-Lytz.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
56th Regular Session of the IAEA General Conference
Country Report on Asian ALARA Networking Meeting LIU Senlin China Institute of Atomic Energy P.O. Box 275(1), Beijing Fax: Tel:
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
El Cabril near surface disposal facility
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ROMANIA.
Tsuruga November 2008 ISOE International ALARA Symposium 1 OCCUPATIONAL EXPOSURE DYNAMICS IN DIFFERENT TYPES OF RUSSIAN NUCLEAR POWER PLANTS Dr.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Application of « ALARA » at Tihange NPP ISOE EUROPEAN SYMPOSIUM 26 June 2008 Ir. Philippe Petit – Deputy head of SRP department 2 2.
European Radiation Protection K. SCHNUER 4th ISOE European Workshop on Occupational Exposure Management at Nuclear Power Plants Lyon 24 to 26 March 2004.
General Overview of the Romanian Nuclear Utility NUCLEARELECTRICA Dumitru Dina Head of Nuclear Safety Department 1WASHINGTON DC, USTDA , September.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
2013 ISOE International ALARA Symposium
Nuclear decommissioning: Turning waste into Wealth
Independence of a Regulatory Body
EUROPEAN ALARA NETWORK
Sustaining Cradle-to-Grave Control of Radioactive Sources (INT-9182) Workshop on implementation of a national cradle-to-grave control system for radioactive.
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
Transposition of Requirements set out in the Basic Safety Standards for Nuclear Facilities in Lithuania Gintautas KLEVINSKAS Albinas MASTAUSKAS Radiation.
János Krutzler Hungarian Atomic Energy Authority
THAILAND Training and Tutoring Feedback
SESSION 3 Policy Framework
The Success of the ALARA Principle – the View of an Inspector
Status and Development of Regulatory Infrastructure in Iraq
Experts for experts Using the T&T international Projects to strengthen the professional development of NRA and TSO technical staff T&T second coordination.
ISOE Information System on Occupational Exposure: An Overview
IAEA Safety Guidance on Licensing and Oversight Activities
ENVIRONET Plenary Meeting Vienna, Austria, 5 – 7 December 2017
The pathological effects of ionising radiation
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Regulatory Control Training Workshop
ISOE - Information System on Occupational Exposure
RCF Plenary Session 21 September 2018
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
Radiation protection organisation
Legal and Regulatory Framework for Nuclear Installations in IRAN
Training and Tutoring Approaches in the Field of Radiation Safety
Brian Ahier (OECD Nuclear Energy Agency, ISOE Joint Secretariat)
Current Radiation Protection Legislation in Slovakia
G. Valtchev, M. Neshkova, A. Nikolov Nuclear Power Plant Kozloduy
Radiation Protection Handbook
Optimisation in Operational Radiological Protection
Regulatory system in Hungary
Safety requirements for predisposal management
Presentation transcript:

2008 ISOE EUROPEAN SYMPOSIUM. FI

2008 ISOE EUROPEAN SYMPOSIUM. FI ALARA in the Dismantling of Nuclear Facilities Alejandro Rodríguez (ENRESA) 2008 ISOE EUROPEAN SYMPOSIUM. FI

In 1984, the Spanish Parliament took the decision to create a public company to undertake the management of the radioactive wastes generated in Spain and the dismantling of nuclear power plants. As a result the Empresa Nacional de Residuos Radiactivos, S.A. (ENRESA) was set up. This is a public non profit-making company whose shareholders are the Centre for Energy-related, Environmental and Technological Research (CIEMAT) and the State Industrial Holding Company SEPI. The main missions of ENRESA may be summarized as follows: Removal, transport, treatment, storage and disposal and control of the radioactive wastes generated in Spain. Dismantling of disused nuclear and radioactive facilities. Environmental restoration of uranium mines. Research and development.

“Closing the circle” Feedback in ALARA Process PLANNING ALARA Forecasting Contractor/Performer RP&S Service OPERATING EXPERIENCE Feedback Verification of Criteria Preliminary data Compilation of information Specific training ALARA Study ALARA Group Meeting PREPARATORY PHASE SUBSEQUENT REVIEW Lessons learned Comparison with Forecasts ALARA Group Meeting Final ALARA Report CONTROL in PERFORMANCE Work Supervision Radiological Surveillance Dose evolution tracking ALARA Group Meetings Corrective actions 2008 ISOE EUROPEAN SYMPOSIUM. FI

ALARA COMMISSION (Management Level) ENRESA ALARA ORGANISATION ALARA COMMISSION (Management Level) Director El Cabril Facility TECHNICAL DIVISION OTHER DIVISIONS CHAIRMAN enresa ALARA COMMISSION Management Level Vandellós NPP Installation Safety Department Decommissioning and Projects LMRW RP&S Serv. Manager RPTU Manager Special Activities FUNCTIONS and RESPONSIBILITIES Promotion of ALARA culture Approval and backing for Objectives Provision of resources Meets twice at year Reports to MANAGEMENT Committee Implicit to the concept of ALARA is the need for strong support from the Management in its widest sense, as well as its direct participation in the Programme implemented. The Management is responsible for ensuring compliance with the requirements of the competent authority, and in so doing may delegate certain functions to its subordinates, acting via the hierarchical framework. 2008 ISOE EUROPEAN SYMPOSIUM. FI

Decommissioning of Uranium Mines & Mills Spanish Decommissioning Experience Decommissioning of Uranium Mines & Mills Andújar uranium mill, since March 1995 in Surveillance Period, with a minimum duration of 10 years Works period: from 1991 to 1995 Budget: 24 M€ M3 Restored: 361.000 Initial situation Final situation 2008 ISOE EUROPEAN SYMPOSIUM. FI

Decommissioning of NPP´s: Vandellós-I Project Spanish Decommissioning Experience Decommissioning of NPP´s: Vandellós-I Project Works Period: from 1998 to 2003 Budget: 94.605.769 € Materials Involved: 300.000 t Radwastes: 2.000 t 2008 ISOE EUROPEAN SYMPOSIUM. FI

Decommissioning of Research Facilities Spanish Decommissioning Experience Decommissioning of Research Facilities CIEMAT (Spanish Centre for Energy related, Environmental and Technological Research) Research Reactor Pilot Reprocessing Plant Conditioning and Storage Plant for Liquid Waste Dismantling works start in 2006 and will be completed by 2009 Budget: 22.145.702 € Material Involved: 7.000 t Radwastes: 460 t Research Reactor Liquid Radioactive Waste Storage Reprocessing Plant Liquid Radioactive Waste Conditioning Plant 2008 ISOE EUROPEAN SYMPOSIUM. FI

Decommissioning of NPP´s: Zorita Project Spanish Decommissioning Experience Decommissioning of NPP´s: Zorita Project General Data Reactor Type: PWR Westinghouse One Loop Gross Electrical Power:160 MWe Containment Type: Dry Containment Construction: Reinforced Concrete with steel dome Spent Fuel Pool: Inside Containment Works Period Expected: from 2009 to 2015 Budget: 135 M€ Material Involved: 101.031 t. Radwastes: 4031 t. 2008 ISOE EUROPEAN SYMPOSIUM. FI

2008 ISOE EUROPEAN SYMPOSIUM. FI ALARA in Decommissioning The application of the ALARA principle and the Radiation Protection in decommissioning do not imply any significant novelty with respect to the way it is applied at other operating facilities. Although in practice several differences arise: The organization should be adapted to the new objectives of the project . The physical configuration of the facility is modified continuously: Loss of structural confinements (loss of isolation) Modification of the systems (Effluents, radiation surveillance, etc) The radiological status of the facility is continuously modified, and the radiological risks too Modification of the routes for personnel and materials Variation of the control areas 2008 ISOE EUROPEAN SYMPOSIUM. FI

2008 ISOE EUROPEAN SYMPOSIUM. FI Vandellós I NPP Decommissioning Case. Evolution of Radiological Controlled Areas Finally these three next slides shows you a lot of data from the point of view: RP Opeartive Area, Radiological Measuremets Area, Environment Area 2008 ISOE EUROPEAN SYMPOSIUM. FI 2008 ISOE EUROPEAN SYMPOSIUM.FI

FUNCTIONS and RESPONSIBILITIES V1-NPP ALARA ORGANISATION Vandellós I NPP Decommissioning Case. ALARA Organization (1) FUNCTIONS and RESPONSIBILITIES Dose objective proposals (V1-NPP) Periodically informed on: practices, ALARA studies, and Training Programmes, Analysis of results obtained Corrective actions Reporting to ALARA Commission Coordination V1-NPP Organisation Approval of indicators Participation and attendance in Training Meets (4 times/year) V1-NPP ALARA ORGANISATION Manager Vandellós-1 ALARA COMMITTEE ALARA Technical Manager RP&S Service Other Services and Areas Managers ENG+PO+PERF ALARA COORDINATOR ALARA AREA ALARA Technician 2008 ISOE EUROPEAN SYMPOSIUM. FI

FUNCTIONS and RESPONSIBILITIES Vandellós I NPP Decommissioning Case. ALARA Organization (2) FUNCTIONS and RESPONSIBILITIES Set up through meeting, Proposals for improvements to be implemented, Reports to V1-NPP Management, Coordination of activities, Analysis of specific activities and Planning of specific tasks, Performance of the following: work tracking, and results analysis, Proposals for necessary improvements. 2008 ISOE EUROPEAN SYMPOSIUM. FI

2008 ISOE EUROPEAN SYMPOSIUM. FI Vandellós I NPP Decommissioning Case. Criteria CRITERIA for identification of work subject to specific ALARA Tracking CONCEPT/CRITERION VALUE OBSERVATIONS 1.- Collective dose (mSvm) 10 Total Per RWP 2.- Maximum individual dose (mSv) 2 3.- Dose Rate (mSv/h) 1 In Area 4.- Removal superficial contamination Work Zones 4.1.- Beta-Gamma (Bq/cm2) 200 Accessible 4.2.- Alpha (Bq/cm2) 20 Surfaces 5.- Air-borne contamination (LDCA) 6.- Zone Classification Red Zone 7.- Duration of work (H-p) 1.200 Total Per RWP/WAR limited occupation zone 8.- On request by RP&S Service 2008 ISOE EUROPEAN SYMPOSIUM. FI

2008 ISOE EUROPEAN SYMPOSIUM. FI Vandellós I NPP Decommissioning Case. Results ALARA Meetings during the project Year 1998 1999 2000 2001 2002 2003 Total ALARA COMMITEE N/A 4 5 2 19 ALARA GROUP 3 12 22 32 16 8 93 ALARA Meetings during the project 30 Studies have been performed ALARA Dose Total collective dose of the project 552,95 m. mSv Total collective dose of the dismantling activities 354,67 m. mSv Collective dose regulated under ALARA studies 261,67 m. mSv The 74% of the dose of dismantling operations has been controlled under the ALARA studies 2008 ISOE EUROPEAN SYMPOSIUM. FI

2008 ISOE EUROPEAN SYMPOSIUM. FI Vandellós I NPP Decommissioning Case. Results 2008 ISOE EUROPEAN SYMPOSIUM. FI

2008 ISOE EUROPEAN SYMPOSIUM. FI Vandellós I NPP Decommissioning Case. Cumulated Collective Dose 700 603,391 354,674 552,152 428,200 197,478 100 200 300 400 500 600 1998-T1 1998-T2 1998-T3 1998-T4 1999-T1 1999-T2 1999-T3 1999-T4 2000-T1 2000-T2 2000-T3 2000-T4 2001-T1 2001-T2 2001-T3 2001-T4 2002-T1 2002-T2 2002-T3 2002-T4 2003-T1 2003-T2 2003-T3 2003-T4 TIME man.mSv TOTAL PLANNED DOSE PDC TOTAL PDC (CONTRACTORS) TOTAL DOSE-DLD (CONTRACTORS+STAFF) TOTAL DOSE-TLD TOTAL DOSE-DLD (STAFF) Finally these three next slides shows you a lot of data from the point of view: RP Opeartive Area, Radiological Measuremets Area, Environment Area 2008 ISOE EUROPEAN SYMPOSIUM. FI 2008 ISOE EUROPEAN SYMPOSIUM.FI

Vandellós I NPP Decommissioning Case. Lessons Learned RP CONTROLS and STANDARDS TRAINING and QUALIFICATION STEPWISE CONFIGURATION AND DEPRESSURE SYSTEMS VENTILATION STAGES OF UNDRESSING HERMETIC SEALING OF WORK AREAS EQUIPMENT AND SYSTEMS FOR CONTINUOUS SURVEILLANCE CONTROL BY BIOANALYSIS AND NASAL SMEARS 2008 ISOE EUROPEAN SYMPOSIUM. FI 2008 ISOE EUROPEAN SYMPOSIUM.FI

2008 ISOE EUROPEAN SYMPOSIUM. FI