Integrated LED calibration

Slides:



Advertisements
Similar presentations
What is Arduino?  Arduino is a ATMEL 168 micro-controller kit designed specially for small projects  User friendly IDE(Integrated Development Environment)
Advertisements

1 A proposal of new simple system for testing a large number of MPPC for the R&D phase of GLD calorimeter 2007/Feb/6 ACFA ILC Workshop ICEPP, University.
Olin Student Projects 2008 Keith Gendreau Code 662 NASA/GSFC
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Spring semester (4/2009) High Speed Signal Processing Board Design By: Nir Malka, Lior Rom Instructor: Mike Sumszyk הטכניון - מכון טכנולוגי לישראל הפקולטה.
Final Presentation Performed by: Boris Goychman & Eyal Tsin Instructor: Tsachi Martsiano Annual project, Winter 2012.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
1 Warsaw University of Technology Faculty of Electronics and Information Technology Institute of Electronic Systems HARDWARE SIMULATOR of the high-resolution.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
David Cussans, AIDA/CALICE DAQ Palaiseau, 10 Nov 2011 Trigger/Timing Logic Unit (TLU) for AIDA Beam-Test.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
The DRS2 Chip: A 4.5 GHz Waveform Digitizing Chip for the MEG Experiment Stefan Ritt Paul Scherrer Institute, Switzerland.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
PSI Power Supply Controls MedAustron Controls Workshop 1 PR a-FMO-PSI_Power_Supply_Controls.pptx F. Moser - PSI Power Supply Controls 1.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
Production PMT Testing and Work on Site with Prototype Tank University of California, Los Angles Department of Physics and Astronomy
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Enhancement Presentation Carlos Abellan Barcelona September, 9th 2009.
9530 T IMING C ONTROL U NIT Features TCU-1 Key Features 250ps timing resolution with < 50ps jitter 8 independent outputs with full individual programming.
Hugo Furtado CERN - Microelectronics Group 11th Workshop on Electronics for LHC and future Experiments Delay25, an ASIC for timing adjustment in LHC Delay25.
THE MOST SUCCESSFUL C2000 MCU
LED notched fibre distributing system Calibration system for SiPM
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Setup for automated measurements (parametrization) of ASD2 chip
A 12-bit low-power ADC for SKIROC
ARDUINO BASED AUTOMATIC TEMPERATURE BASED FAN SPEED CONTROLLER
LED notched fibre system short HBU0 party with QMB6
Baby-Mind SiPM Front End Electronics
SCADA for Remote Industrial Plant
Radius disco Radius agujero Motor Controller Sensor Motor soporte.
CALICE meeting 2007 – Prague
KRB proposal (Read Board of Kyiv group)
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Testbeam Timing Issues.
Front-end electronic system for large area photomultipliers readout
VeLo Analog Line Status
The resistance of a thermistor changes from 30k to 12k when the temperature changes from 20C to 70 C Calculate the sensitivity if resistance is taken.
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Stefan Ritt Paul Scherrer Institute, Switzerland
Manual Robotics ..
GLAST LAT System Engineering
Scintillator HCal Prototype
Presentation transcript:

Integrated LED calibration Sebastian Weber University of Wuppertal Integrated LED calibration Date Event

University of Wuppertal & ILC Join ILC and proceed developement of „integrated LED“ calibration system start with existing test system optimize circuit LED position & color develop robust, scalable & simple calibration sytem

Plans xy table high resolution homogenity test LED position β-rays edge of tiles? highly automated system scan through a set of parameters in short time

Plans Temperature controlled box reproducibility actual system highly sensitive to temperature temperature studies

DAQ HCAL DAQ (VME+CRC) less convenient CRC rare complex expensive overkill (e.g. >1700 SiPMs) Our Requirements small, easy to use and adaptable hard- and software read out ~4 SiPMs still as similar as possible to existing system

µDAQ A lightweight DAQ system on 100x80mm²

µDAQ Features Full support of HCAL LVDS signals 68 pin VHD SCSI connector Analog part 1:1 identical with CRC 4channel ADC: up to 72 SiPMs Generates all supply voltages except HV USB interface RS232 emulation Drivers for all OS → no pain for developers Up to 3 Temperatures Hardware developement completed software no show stopper

µDAQ Features - timing CRC HOLD signal: 200-1000ns, 6.5ns steps 52ns LED pulse by 300MHz pulse generator (fixed delay to HOLD) µDAQ only 83ns steps keep HOLD fixed shift LED pulse delay instead (300MHz generator) What's about jitter on µCs? Measured to be less than 140ps

Outline Integrated LED calibration system taken over by University of Wuppertal µDAQ hardware completed software less critical We can begin within next weeks!