WLCG Accounting Task Force Update Julia Andreeva CERN WLCG Workshop 08

Slides:



Advertisements
Similar presentations
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
Advertisements

Virtis-Opis Beta Testing Todd S. Thompson, PE South Dakota DOT Office of Bridge Design August 3, 2011.
Enabling Grids for E-sciencE System Analysis Working Group and Experiment Dashboard Julia Andreeva CERN Grid Operations Workshop – June, Stockholm.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Overview of STEP09 monitoring issues Julia Andreeva, IT/GS STEP09 Postmortem.
WLCG Service Report ~~~ WLCG Management Board, 9 th August
WLCG Grid Deployment Board, CERN 11 June 2008 Storage Update Flavia Donno CERN/IT.
Julia Andreeva, CERN IT-ES GDB Every experiment does evaluation of the site status and experiment activities at the site As a rule the state.
Storage Accounting John Gordon, STFC GDB March 2013.
Report from the WLCG Operations and Tools TEG Maria Girone / CERN & Jeff Templon / NIKHEF WLCG Workshop, 19 th May 2012.
Ian Bird GDB CERN, 9 th September Sept 2015
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
Global ADC Job Monitoring Laura Sargsyan (YerPhI).
LCG Accounting/Reporting John Gordon, STFC MB November 9 th 2011.
Security Policy Update WLCG GDB CERN, 8 Dec 2010 David Kelsey STFC/RAL david.kelsey AT stfc.ac.uk.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
News and Status WLCG Information System Task Force Maria Alandes IT/SDC.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
Accounting Review Summary from the pre-GDB related to CPU (wallclock) accounting Julia Andreeva CERN-IT GDB 13th April
ELIXIR SAB Feedback December 2014.
WLCG Accounting Task Force Update Julia Andreeva CERN GDB, 8 th of June,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Storage Accounting John Gordon, STFC OMB August 2013.
LCG Accounting Update John Gordon, CCLRC-RAL 10/1/2007.
WLCG Information System Status Maria Alandes Pradillo, CERN CERN IT Department, Support for Distributed Computing Group GDB 9 th September 2015.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI APEL Regional Accounting Alison Packer (STFC) Iván Díaz Álvarez (CESGA) APEL.
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
Operations Coordination Team Maria Girone, CERN IT-ES GDB, 11 July 2012.
Accounting Review Summary and action list from the (pre)GDB Julia Andreeva CERN-IT WLCG MB 19th April
WLCG Accounting Task Force Introduction Julia Andreeva CERN 9 th of June,
CERN IT Department CH-1211 Geneva 23 Switzerland t Service Reliability & Critical Services January 15 th 2008.
GridPP37, Ambleside Adrian Coveney (STFC)
WLCG IPv6 deployment strategy
Monitoring Evolution and IPv6
Main objectives To have by the end of August :
Laurence Field IT/SDC Cloud Activity Coordination
WLCG Workshop 2017 [Manchester] Operations Session Summary
Software Project Configuration Management
EGI Operations Management Board
WLCG Network Discussion
E-Learning Advisory Group Meeting
John Gordon STFC OMB 26 July 2011
WLCG Data Steering Group
WLCG Resources Reporting
WLCG Accounting Task Force Update Julia Andreeva CERN IT on behalf of the WLCG Accounting Task Force GDB
Ian Bird GDB Meeting CERN 9 September 2003
LHC Computing Grid Status of Resources Financial Plan and Sue Foffano
WLCG experiments FedCloud through VAC/VCycle in the EGI
5th Session of the Task Team on WIGOS Metadata
Update on Plan for KISTI-GSDC
The CREAM CE: When can the LCG-CE be replaced?
Proposal for obtaining installed capacity
Savannah to Jira Migration
RDIG for ALICE today and in future
Testbed Software Test Plan Status
Update from the HEPiX IPv6 WG
Improvement Suggestions to the Procedure for Product Acceptance
1 VO User Team Alarm Total ALICE 2 ATLAS CMS LHCb 14
WLCG Collaboration Workshop;
Objectives Explain the changes in Release 4.23 that are specific to Higher Education Provide a walkthrough of the streamlined HE assessment process.
Validation & conformity testing
Monitoring of the infrastructure from the VO perspective
Workshop on the data collection of occupational data
New Types of Accounting Beyond CPU
Accounting Repository
Health & Consumers DG SANCO Unit A.4 Information systems
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC
Presentation transcript:

WLCG Accounting Task Force Update Julia Andreeva CERN WLCG Workshop 08

Main objectives of the task force The highest priority task for the Task Force is to address current issues with CPU/Wall clock accounting. For the CPU accounting to have by the end of August : EGI accounting portal with a dedicated WLCG view which contains all necessary information in a table and/or graph form available also through APIs. Should be bug-free and user-friendly Data exposed through the portal should be correct. We should have in place an automatic data validation procedure, which would allow us to detect eventual problems with data publishing or/and processing The accounting reports with an agreed content should be generated by the EGI portal. This might be possible to do on demand for any given time range with monthly granularity. For space accounting agree with the experiments and sites on the functionality which is required for the WLCG storage space accounting system considering the use case of the high level overview of the total and available space

Status. Data validation. Data in the accounting portal was validated by comparison with data in the experiment-specific accounting systems for all 4 experiments. 100% consistency is not expected due to pilot overhead. For ALICE, ATLAS and LHCb the checks showed good consistency (difference ~5%). For CMS the difference is considerably higher. After investigation with the CMS experts this difference was explained by higher pilot overhead. More details about data validation can be found here: https://twiki.cern.ch/twiki/bin/view/LCG/AccountingDataValidation The fact that data in the experiment-specific accounting systems well agrees with the data provided by the EGI accounting portal allowed to make a conclusion that data provided by the EGI portal is trustworthy. However, validation allowed to detect problematic sites, which do not publish correctly accounting data to Apel, these sites are being followed up and fixed In order to facilitate detecting and debugging of the corner cases, an automatic validation procedure has been put in place using Site Status Board (credits to CERN openlab summer student Dimitrios Christidis). More details about automation of data validation can be found here: https://twiki.cern.ch/twiki/bin/view/LCG/AutomationOfDataValidation Due to complexity of the heterogeneous T0 cluster, up to now, manual updates of the T0 accounting data is required. This issue has been addressed by setting up of the new T0-Apel report generation procedure (summary records) which takes into account all types of T0 resources (credits to Miguel Coelho dos Santos) Validation of data generated by the new T0 accounting procedure is ongoing in collaboration with the experiment experts.

Status. Validation of the new EGI accounting portal New EGI accounting portal has been deployed for validation in the beginning of summer: https://accounting-next.egi.eu Validation of the WLCG view in the portal has been performed. Very good collaboration with portal developer Ivan Diaz Alvarez. Quick bug fixes. After validation, the new portal has been publicized to the sites and experiments via the WLCG operations coordination meetings. Asked for feedback. So far feedback is positive Following the decisions of the WLCG accounting review at the GDB where it has been agreed that the WLCG-dedicated portal with WLCG feature requests will be provided, task force collected requirements from the user community. Following the requirements, the draft of the specification for the WLCG-dedicated portal was created . By the end of October, after final approval of the task force members the specification will be passed for implementation to the EGI portal developers. More details regarding portal validation can be found here: https://twiki.cern.ch/twiki/bin/view/LCG/NewAccountingPortalTesting

Status. New accounting reports Currently accounting reports are generated by two different systems: REBUS (T1) and EGI portal(T2) Generation of the T1 accounting reports moved to EGI portal. REBUS code has been re-used Following the decisions of the MB and of the WLCG accounting review at the GDB some changes were implemented in the new reports (use work derived from walltime consumption to compare with pledges, drop installed capacity for CPU) New reports are available under “Reports->WLCG” view in the new portal. Now it is be possible to generate reports on demand for any given time range with monthly granularity. First level of validation has been performed. Most of bugs were fixed. A bit of polishing of the headers, labels and notes is still required. The plan of migration to the new set of reports is agreed. Staring from end of October, current official reports will be sent together with the new set of reports. This will give people an opportunity to validate new reports and provide their feedback. We plan to make new reports official starting from January 2017.