SANE Cherenkov - Bigcal Efficiency Update

Slides:



Advertisements
Similar presentations
EMCal Jet Trigger Analysis for ALICE* Christopher Anson Creighton University *Supported by the U.S. DOE Office of Science.
Advertisements

VETO Analysis Update Michael Wood University of Massachusetts, Amherst Outline Introduction and basics Reconstruction packages Efficiencies Simulation.
Update on diffuse extraterrestrial neutrino flux search with 2000 AMANDA-II data Jessica Hodges, Gary Hill, Jodi Cooley This version of the presentation.
Summary of downstream PID MICE collaboration meeting Fermilab Rikard Sandström.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
1 Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting June 20, 2007.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Tracking Photon Conversions. Existing Track Seeding From pixels –Widely used, but not useful here From stereo silicon layers –Uses layers 5 and 8 (barrel),
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Outline: (1) The data sample (2) Some news on the analysis method (3) Efficiency revised (4) Background revised (5) Data: spectrum + “phi-curve”
Update on the new reconstruction software F. Noferini E. Fermi center INFN CNAF EEE Analysis Meeting - 14/09/20151.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
Optimising Cuts for HLT George Talbot Supervisor: Stewart Martin-Haugh.
BigCal Reconstruction and Elastic Event Selection for GEp-III Andrew Puckett, MIT on behalf of the GEp-III Collaboration.
Background Subtraction and Likelihood Method of Analysis: First Attempt Jose Benitez 6/26/2006.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
Detection of electromagnetic showers along muon tracks Salvatore Mangano (IFIC)
Total photoabsorption on quasi free nucleons at 600 – 1500 MeV N.Rudnev, A.Ignatov, A.Lapik, A.Mushkarenkov, V.Nedorezov, A.Turinge for the GRAAL collaboratiion.
The ZDD data structure Each ZDD channel produces a positive “waveform”, one 8-bit sample every 2 ns This waveform is then splitted in “fragments”: a sequence.
Kelli Hardy Compton Study from Experimental Data.
SANE Asymmetries Hovhannes Baghdasaryan. Measurement We are measuring Assumption is that background asymmetry is small Then Measured asymmetry is the.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
, Dan Peterson Apparent inconsistencies and other issues in the xBSM measurements of IBS Scans We have studied the pinhole and CodedAperture.
SANE Collaboration ( E07-003) Anusha Liyanage Hampton University January 12, 2010 Measurement Of the Proton Form Factor Ratio at High Q 2 by Using The.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
1 EMCAL Reconstruction in Pass pp 900 GeV 29/03/2010 Gustavo Conesa Balbastre.
L1Calo EM Efficiencies Hardeep Bansil University of Birmingham L1Calo Joint Meeting, Stockholm 29/06/2011.
Simultaneous photo-production measurement of the  and  mesons on the nucleons at the range 680 – 1500 MeV N.Rudnev, V.Nedorezov, A.Turinge for the GRAAL.
Update on B-analysis Introduction Towards a definition of a limited set of plots for TDR, using all available data. Based on few general.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
Matteo Volpi, Luca Fiorini Timing study with Muons at 90º from first beam PRELIMINARY STUDY (Barcelona) 1 Tile Timing Group meeting 17 September 2008.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
Jin Huang M.I.T. For Transversity Analysis Meeting Sept 10, JLab.
Update on the new reconstruction software F. Noferini E. Fermi center INFN CNAF EEE Analysis Meeting - 28/09/20151.
Beam Line Data Analysis of the PMT and Quartz Coupling Zak Arcara.
Gianluca Lamanna TDAQ WG meeting. CHOD crossing point two slabs The CHOD offline time resolution can be obtained online exploiting hit position.
30th International Cosmic Ray Conference in Merida, Mexico Michael Smy UC Irvine Low Energy Event Reconstruction and Selection in Super-Kamiokande-III.
Preliminary Analysis of the New Focusing DIRC Prototype Beam Data
Acd Veto Latching The Acd front end electronics generate a veto primitive when a discriminator goes above threshold. But. The signal is split: One path.
Fabio, Francesco, Francesco and Nicola INFN and University Bari
Erik Devetak Oxford University 18/09/2008
analisys: Systematics checks
Signal and Background MonteCarlo generation
Kinematic variables pT and Rapidity of J/psi and Psi(2S) in invariant mass window of 100 MeV around respective peaks (3.097 and 3.68 GeV)
Converted photons efficiency
CLAS12 software workshop
Least Squares Regression
Tracking System at CERN 06 and 07 test beams
Results from a preliminary analysis of the MWPC test at the GIF
Noise analysis of the 1m3 DHCal test beam
Pi0 Simulation for BigCal
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
EMCal Recalibration Check
String-21 Flasher Analysis
EMCal Recalibration Check
Using Single Photons for WIMP Searches at the ILC
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
SOS Cerenkov Purpose: provide PID for NA Cerenkov efficiency studies
Timing Counter analysis
Problems with the Run4 Preliminary Phi->KK Analysis
Backgrounds using v7 Mask in 9 Si Layers at a Muon Higgs Factory
NKS2 Meeting with Bydzovsky NKS2 Experiment / Analysis Status
SOS Cerenkov Purpose: provide PID for NA Cerenkov efficiency studies
Eduardo do Couto e Silva Feb 28, 2006
3E7_05151 wafer 11 IV curve Noise ~122e Source scans bad and
Status of DT Local Trigger Commissioning
° status report analysis details: overview; “where we are”; plans: before finalizing result.. I.Larin 02/13/2009.
Zhiwen Zhao,UVa for EC group
Presentation transcript:

SANE Cherenkov - Bigcal Efficiency Update Whitney Armstrong

The Timing Fix 20ns bigcal Makes timing peak better because it is now set by the Cherenkov cherenkov 50ns 50ns 15ns bigcal cherenkov 16ns 20ns https://hallcweb.jlab.org/hclog/0902_archive/090212125207.html

Before “Fixing Timing” Understood - Cherenkov Channel 4 Bad HV Cable Good lower mirror performance

After “fixing timing” Note how both of these areas have decreased

Parallel (after fix)

Bigcal Timing Trigger groups are off set... sums of (sums of 64) are as well... Were trigger signals corrected? ( time here for 80 channels? Which is about 30 ns...)

Observation The Cherenkov mirror edges are not correlated with the inefficiency's vertical onset Bigcal has large ~30ns timing difference between two sections When Bigcal sets the time two peaks form in cherenkov TDC Bigcal timing is correlated with the inefficiency onset Bigcal timing is correlated with the energy dependence Top of Protvino section (mirrors 5&6) gets worse after “timing fix”

Bigcal Time Difference 100 ns cherenkov gate Single peak remains because cherenkov sets the time! https://hallcweb.jlab.org/hclog/0902_archive/090212125207.html

Cherenkov TDC - 72221 About 25-40ns difference between Protvino and RCS 100ns

Cherenkov – 72221 (before fix)

Energy <1000 Ignore the top part that is missing... later...

Energy>1000

Energy <1000

Trajectory Based Cherenkov Performance Require “OK” hit in Tracker AND Lucite w.r.t. seeding cluster Look at Cherenkov efficiency with this criteria Inefficiency should exist if Cherenkov mirror alignment is poor.

Trajectory based efficiency - Very Good

Run 72930 Improved efficiency on spherical mirrors due to elimination of background events No energy cut

No energy cut

No energy cut

Note statistics are poor until here

Trajectory Based Cherenkov Performance Summary With high energy cut (>1000 MeV) Cherenkov Efficiency improves (or stays the same)!!! This contradicts the conclusion that the Cherenkov mirrors are not properly aligned. Inefficiency should exist if Cherenkov mirror alignment is poor.

What is going on then?

A Possible Scenario Protvino RCS Cherenkov Higher energy events Lower energy events time-walk their way into a better (efficient) trigger Cherenkov time walks or has path length that takes it out of the trigger

Possible Scenario after fix High energy ~ fast. This section was timed with cherenkov in the middle of BC gate. 40ns maybe comes from: A. Puckett's “BigCal Analysis Priimer” 40ns – RCS multiplexer 80ns – Prot multiplexer 25-40 ns ... Puckett goes on to say that timing groups are delayed to match ... if this is true for the signal used for the BETA trigger, why would there be two peaks in the TDC spectra which did not set the time?!?

Before the Fix... Note: Protvino Earlier RCS Later

Consistency thus far Questions: Cannot explain early double peak unless unaligned Bigcal Timing groups were used for trigger If unaligned groups were used with bigcal OR, this explains apparent bias toward low energy. RCS arrives later which is better timed Questions: Was an unaligned Bigcal Timing group used with Cherenkov AND for the BETA trigger? Bigcal Trigger was aligned... was BETA?

Bigcal T_trgbig is aligned!

Energy and Time Dependence It is clear from the previous slides that the energy dependence is correlated with Bigcal Timing Lower energies time-walk their way into a better trigger for Protvino. Also, for larger phi angles, Cherenkov trigger arrives slightly later due to path length.

Conclusion Energy dependence is not caused by Cherenkov mirror alignment Bigcal timing needs to better understood. Cherenkov efficiency quite good when combined with Forward Tracker and Lucite Hodoscope.

Backup Slides

Beta

Beta Vs Bigcal 20ns?

Energy Dependence Clusters with cherenkov TDC hit (loose) over all

Energy>1000 Notice how the top and bottom and curved. Due to photon path length of Cherenkov vertical displacement.