LCD Splicing Screens Wall-mounted Guide

Slides:



Advertisements
Similar presentations
F AST T RACK REMOTE SWITCH WIRING SET UP FOR THE LIGHT BoardPlug Power strips relay Wiring Harness.
Advertisements

R&M Fiberliner LAN / WAN applications R&Measynet.
KYMV060C4 2 BY 2 MPDP INSTALLATION GUIDE KINGYOO Electronics., LTD.
THE PRUSA I2 MEGA By Taylor Knight. PROJECT GOALS  Direct drive extruder  Larger build area  Space for second extruder  Faster print speeds.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Honda 450 Installation Manual.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
Polaris Predator Installation Manual. STEP 1: Remove ATV Rear Tires Remove ATV right side wheel hub Remove ATV stock swing arm (2 bolts) KTRACKS.
Digital Installation - 1 Modern Communication & Broadcast System (MCBS) - 60cms Prepared By Checked ByApproved ByCirculated By Mr. Ashok Dubey Mr. Sanjib.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
8/30/ Ford Police Interceptor Utility Ford Police Interceptor Utility does not come with fog lights Front facia is made from solid plastic.
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Engineering Overview Presenter’s Name
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
APPLICATIONS: WHENEVER IT IS NOT POSSIBLE TO INSTALL A RAIL SYSTEM DIRECTLY ABOVE A WORK AREA, AN ARTICULATING ARM IS A SOLUTION ARTICULATING ARMS PROVIDE.
Model 995 EP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:
Model 895 AP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Handy Store Fixtures Gondola Dolly Assembly Instructions
SANUS SYSTEMS THE UNION OF FORM AND FUNCTION Sanus Systems 2221 Hwy 36 West. St. Paul, MN
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
Multi Flasher By Joshua.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
McPherson Strut Service and Diagnosis
Repair Guide SMP-Series Products. page 2 Agenda Warning Product Disassembly ○ SMP-WEBPLUS ○ SMP-WEB / SMP-PRO2 ○ SMP-WEB3 / SMP-PRO3 SMP-WEB3N / SMP-PRO3N.
New design With fewer parts and easier manufacture degrees 20mm 245.
2000 Chevy S-10 Left Suicide Door Install Instructions 1.Remove seat (4 anchor bolts.) 2.Remove tracks from seat. To access the nut shown in pic 1, pry.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
NLA-5 Series Rigging Manual Preparation Material 2.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
Compressor Replacement – ODU
New Store – Enter Store Name & Number PROJECT PHOTOS 1.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Use original rear consol support/seat belt mountUse supplied console support bracket (front.) Unit Can possibly pop pocket off lower door. IF NOT,
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Product Focus: Using the Light Hatch to reduce time, costs and risk.
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
LINAC 4 CCDTL Accelerating Structure SO SO Aluminum foil H = 0,3…0,5 mm Module of CCDTL Accelerating Structure.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Assembly of steering.
VIEW SERIES with Sliding Door
Different Types of Ute Accessories
OBJECTIVES Discuss parking brake pedals and automatic parking brake release. Explain parking brake linkages. Describe drum parking brakes. Describe caliper-actuated.
Assembly Guide.
2008 Nissan Xterra Fog Install
Methods for Mounting LCD Displays
Easy-Cliner Manual Cable Version Assembly Instruction
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Adjust the BalaceBox springs to balance
Easycliner (Motorized Version) Assembly Instruction
MKTG 2016.
CTOF Installation.
T400 Motor Replacement.
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Mounting a BalanceBox®650 to a brick wall
Stone rain screens.
Plant issue list A108: Need WR for missing C/S on high mount FA options Chuck Crowder.
Customer Presentation
Required tools for installation of a V-1020C speaker with V-9914 bridge.
WASP Science CCD Assembly Fixture No Guiders
Reader Swap out Guide.
Solaris 10 Installation Guide
Replace Timing Belt 300 Hours.
Aluminium Profile System
Presentation transcript:

LCD Splicing Screens Wall-mounted Guide

Take 2×2 splicing screens as example We can support wall-mounted for 46” and 55” Standard: 1×1, 1×2, 1×3, 2×2, 2×3.

Material Bolt ×24 ×72 ×32 ×16 ×6 A B C D E F

Material Hook Rack Member ×16 G ×3 ×4 H I

Installing Step 1: A B Assemble bracket

Installing Step 2: F Install the anchoring:

Installing Step 3: Replace the origin pothook

Installing Step 4: Install screens

Installing Step 5: Adjust the location of screens and fix the screws. Up & Down Front & Back Front & Back

Make your life safe.