Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug. 2017.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

More CMM Part Two : Details.
Contractor Safety Management
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Licensing of Nuclear Power Plants in Pakistan
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
BSBPMG408A Apply Contract and Procurement Procedures Apply Contract and Procurement Procedures Unit Guide C ertificate IV in Project Management Qualification.
Regulatory Body MODIFIED Day 8 – Lecture 3.
1Product certification CASCO Comms/ International Organization for Standardization.
5.2 Personnel Use competent staff Supervise as necessary
First Article Inspection
Codex Guidelines for the Application of HACCP
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
Introduction to Software Quality Assurance (SQA)
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
New Components Introduction (NCI) and Suppliers Selection. General Awareness Presentation Valentina Shirina GE Transportation June 22, 2011 Eskisehir.
From Research Prototype to Production
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
WHY CONFORMITY ASSESSMENT?. What is conformity assessment?  Conformity assessment is the name given to processes that are used to demonstrate that a.
ISO OPERATIONAL CONTROL
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
АТЦ СПб COMPIANCE ASSESSMENT AT TRANSPORT OF RADIOACTIVE MATERIALS ERSHOV V. - Emergency-Response Centre of the State Corporation “ROSATOM”, St.-Petersburg,
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Perform visual inspection tests.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
BSBPMG408A Apply Contract and Procurement Procedures Apply Contract and Procurement Procedures Unit Guide C ertificate IV in Project Management Qualification.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
Deputy Head of Federal Accreditation Service Sergey V. Migin Approximation of accreditation systems of European Union and Russia.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 The WTO Agreement on Technical Barriers to Trade Basic Concepts and Member Obligations.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
Federal Service for Environmental, Industrial and Nuclear Supervision LEGAL REQUIREMENTS ON EXPLOSION PROTECTED EQUIPMENT FOR THE GAS AND PETROLEUM ACTIVITIES.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Licensing Renewal of Operating License Periodic.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Agenda Item 2: Catch up session 15 May 2017
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
ISO/IEC
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Strategy for conformity of non-standard cryogenic equipment
Administration of a FIDIC Contract - Project Control
Information on activity of the Kyrgyz Center of Accreditation under the Ministry of Economy of Kyrgyz Republic Chapaev Zhanybek  
Third Party Activities for FH1 Project
Head of Supply Chain Division
UNIT V QUALITY SYSTEMS.
Quality control of equipment manufacturing for nuclear facilities
Republican Unitary Enterprise “Belarusian Nuclear Power Plant”
JSC “ZAES” Activities Head of business development department
Flooding Walkdown Guidance
IEC and Information Technology
Regulatory review and assessment
Communication and Consultation with Interested Parties by the RB
RCF Plenary Session 21 September 2018
Regulatory review and assessment
Chemical Purchasing.
Operationalizing Export Certification and Regionalization Programmes
First Article Inspection
I&C requirements and configuration management
Final Rule on Foreign Supplier Verification Programs
Supplier Briefing Pack
DOE Review of the LCLS Project October 2006
Presentation transcript:

Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug. 2017

Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Since 2007 there has been NP-071 standard, a document of Rostekhnadzor (the regulatory body of Russia), in Russia which determines the need for conformity assessment of equipment and services. The document defines four forms of conformity assessment: - Testing - Acceptance of equipment - Certification - State supervision The requirements of this document apply to equipment and its components related to safety classes 1, 2 and 3 (systems and equipment important for safety)

On the basis of this document, the Russian Utility (Rosenergoatom) developed a document, RD EO 1.1.2.01.0713-2007, that clarified the specific features of these forms of conformity assessment, participants, scopes of application, deliverable documents, etc. Both Russian and foreign enterprises had these documents in place as a guidance for conformity assessment during development (design) and manufacture of equipment for Russian nuclear power plants. The requirements set forth in these documents were also applied for comformity assessment of equipment for foreign nuclear power plants (Belarus, China, India).

Main participants in the conformity assessment are: Slide title Main participants in the conformity assessment are: - Customers (Russian NPPs and foreign customers) - Contractors - Manufacturers - Authorized organizations - Material engineering organizations (as experts)

1. Conformity assessment in the form of tests Basically, this form of conformity assessment is used in the development and testing of new equipment, since main characteristics of serial or well-known equipment have already been defined or confirmed. At this stage, full scale tests are carried out, including tests for reliability, operability, and taking into account environmental conditions, operating temperatures, pressure, etc. Requirements for test procedure are set in Russian GOST 15.201 and other Russian standards. In the absence of necessary requirements, a test program is developed, agreed with the design organizations and approved by the Customer.

The result of this form of conformity assessment is the approval or confirmation of the equipment technical requirements (specifications) In accordance with the Russian standard (GOST 15.201), tests are conducted with the participation of the Customer, the project organization and contractor. If it is necessary, the Customer may assign an authorized organization to take part in the tests.

2. Conformity assessment in the form of acceptance Basically, this form of conformity assessment is used in the manufacture of serial equipment and equipment with design, technological and operational experience (reference equipment). The main document confirming the fulfillment by the manufacturer of safety and design requirements is the Quality Plan (in our case, the Inspection and Testing Plan). The tests that are carried out by the manufacture of this equipment, as a rule, are standard and described in the relevant documents. Acceptance of equipment is carried out by an authorized organization, if necessary with the participation of the contractor and the customer.

Requirements for Content of Quality Plan (Inspection and Testing Plan) Practice in Russia Analogue for the Hanhikivi NPP Project Supplier evaluation and selection (before start of manufacture) - Licensing of a supplier by ROSTEKHNADZOR (conducting inspections) - Conducting competitive procurement (tendering) procedure - Conducting audits for supply chain - Approval of the main suppliers by the Customer or STUK

Requirements for Content of Quality Plan (Inspection and Testing Plan) Start of manufacture (Quality plan) Carried out by an authorized organization, participation of the customer and the contractor is possible Start of manufacture (Inspection and Testing Plan)  1. Readiness of an enterprise to start manufacture + evaluation of design documents: - availability of QAP - Personnel qualification control - Inspection of materials and equipment Approval of design documents, etc. (for long-lead items, a step-by-step evaluation is possible) 1. Qualification Plan + Construction Plan (Evaluated and approved by the customer)

Requirements for Content of Quality Plan (Inspection and Testing Plan) 2. Participation in process supervision: Assembly before welding Welding Heat treatment Destructive testing Non-destructive testing Testing (Should be described and made typical, if possible)   3. Final inspection: - Documentation (records) - Visual inspection - Packaging (without transportation) (Should be described and clarified)

3. Conformity assessment in the form of certification Conformity assessment is carried out under a separate law and procedures. 4. Receiving Inspection Receiving inspection is conducted to verify the completeness of the equipment and the documentation at the site. - electronic control of documentation - transportation of equipment - Visual inspection and testing of equipment (if necessary) Receiving inspection procedure is defined in the Utility’s documents.