Linac4 RF System Operation for the Reliability Run in 2017

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
ESS LLRF System Anders J Johansson.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
RF Commissioning Andy Butterworth BE/RF Thanks to: J. Tuckmantel, T. Linnecar, E. Montesinos, J. Molendijk, O. Brunner, P. Baudrenghien, L. Arnaudon, P.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
ORNL/SNS Spallation Neutron Source Low-Level RF Control System Kay-Uwe Kasemir, Mark Champion April 2005 EPICS Meeting 2005, SLAC.
 Installation: equipment, waveguides, water cooling, local cabling  Upgrade of LEP equipment  Contract follow up: new klystrons, spare circulators.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Jan 30, 2008MAC meeting1 Linac4 Low Level RF P. Baudrenghien with help from J. Molendijk CERN AB-RF.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Linac4 status and long-term schedule M. Vretenar, Project Meeting  status  timeline  open issues  status  timeline  open issues.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
BE-RF-FB THE LINAC4 LOW LEVEL RF 02/11/2015 LLRF15, THE LINAC4 LOW LEVEL RF2 P. Baudrenghien, J. Galindo, G. Hagmann, J. Noirjean, D. Stellfeld, D.Valuch.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
Linac Weekly Operational Report May 9 th – May 16 th 2008.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
ESS LLRF and Beam Interaction
CC LLRF SM18 test plan and BA6 infrastructure
Linac4 status and perspectives
RF cell Anders Sunesson RF group leader
Results of the Risk Analysis
Experience with beam instrumentation at Linac4
Controls & software Andy Butterworth.
Status and Plans for InCA
PS status 10 August – 17 August 2017
Updated with comments 22 may 2017 Updated again 29 June 2017
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Overview and System Design for ESS LLRF Systems
RF interlocks for higher intensities (LMC 15 June)
LINAC4 Vacuum Control System Review
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Update on HW commissioning
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Digitizers in CCR for transverse wide-band pick-ups
RF operation of REX-ISOLDE
RF Matching Network Description
CLIC Drive Beam Klystron Modulators
LINAC4 commissioning plans etc.
Sector 0 RF System Installation of components (Master Amplifier and PEP Phase Shifter) in October down time. Testing and commissioning during October.
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
FAIR pLinac RFQ Meeting pLinac RF Power Sources
RF systems introduction
Introduction CDR Normal Conducting Linac LLRF
Testing Coordination at ESS
System tests at CEA O. Piquet 19/03/2019
Status of the ESS High Power RF Systems
RF introduction Anders Sunesson RF group leader
Presentation transcript:

Linac4 RF System Operation for the Reliability Run in 2017 Suitbert Ramberger, CERN, BE-RF-LRF Reporting also for Andy Butterworth, Philippe Baudrenghien, Olivier Brunner

Introduction Linac4 RF systems RF deployment until the Reliability Run RF deployment from the Reliability Run Linac4 RF Organization System Level Debugging Linac Operation (as seen from RF side) Linac Operation Issues

Linac4 RF Systems 3 Buncher, 1 Chopper 1 RFQ, 3 DTL, 7 CCDTL, 12 PIMS, 1 Debuncher 3 Buncher, 1 Debuncher Solid-State Power-Amplifier 17 Klystrons (9 LEP type, 8 new) Mechanical Tuners, RFQ Water Temperature Tuning Phase Shifters, Control Systems, EIS RF Interlock Low-Level RF Systems, Control Software

RF Deployment until RR Installation of debuncher cavity Conformance work on debuncher amplifier Water circuit verifications on DTL Pick-up replacement on DTL T2/T3 center probes Power coupler tuning on DTL Intervention on air cooling on CPI klystron PIMS03/04 Adjustment of line length on one PIMS branch (phase shifter setting is at its limit)

RF Deployment until RR contd. Upgrade of tuner control (asap) Additional tuner control modules for 6 PIMS cavities Upgrade of cavity loop cards v0/v1 to v3 on 5 systems Chopper Drive Unit hardware / FESA completion Chopper Trigger Unit cards v2 FESA completion FESA implementation of RF ON sequence TIMBER data logging beyond DTL3 DIAMON process monitor debugging RF Expert Inspector tools debugging / improvement

RF Deployment from RR Commissioning of the debuncher system (1st month) Commissioning of cavity loops v3 (1st month) Commissioning of the beam loading compensation: Kalmann Predictor and Adaptive Feed-forward (AFF) Automatic Reconditioning Monitoring, Testing, Debugging Work requires regular Technical Stops

Linac4 RF Organization Combined Effort of 4 Sections in the RF Group Modulators and Klystrons (MK) Feedbacks & Beam Control (FB) Servos & Controls Interface (CS) Linacs RF (LRF) Tight dependence also on the Modulator (TE-EPC) Some Interlocks are linked to specific service in charge Some require intervention and further analysis: E.g. excess in reflected power on the klystron

System Level Debugging

Linac Operations (tbd) Operation from CCC by Operator In case of problems -> Calls Linac Supervisor Analyses Issue, dispatch to RF first line (BE-LRF) Analyses faulty RF system, dispatch to RF Experts Daytime Service through Linac RF 76645 Best Effort Call-Out List during Daytime on Weekends Intervention by RF Experts during working hours RR is a unique opportunity to train future piquets

Linac Operation Issues Current RF applications are first line / expert tools They are not meant for operators or supervisors They are not sufficient for reliable operation Operation with 2 days MD, 2 weeks operation (or 3/3) Primary goals for reliability run: Make sure that systems are fully compliant Find reliability issues Debug, debug, debug