1 Progress for August 3, 2011 The boat shipment with the prime focus cage, cage cart, imager handling system etc … arrived on the mountain top this morning.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Telescope Integration and Tests Tuesday Afternoon.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
1 DECam in Chile Intro to Dark Energy Survey & DECam Project Status of arrivals in Chile Instrument checkout in Chile Schedule for first light.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
CALENDAR YEAR PLAN JANUARY FEBRUARY MARCH APRIL MAY JUNE.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
JLG E450AJ boomlift - Electric, 45ft (13.7 m) platform vertical height, AJ= basket jib capabilities. - horizontal span = 7m ton weight, for handling.
Commissioning Alistair Walker NOAO/CTIO 9/30/ DES Collaboration Meeting October
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Architectural Design Module 2 Room Planning.
Jim Fast Pacific Northwest National Laboratory
Module 1 Construction planning and Basic Design
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own.
Blanco Environmental Control System
E450AJ BOOMLIFT for DECAM Tasks
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
The Monster Song.
Sunday Monday Tuesday MED Monthly calendar template
Alistair Walker Version 3 December
Student of the month will begin next week.
Calendar 2017.
Student of the month will begin in September.
Before and After.
DAYS OF THE WEEK.
Sprint 5 Schedule (15 – 2 days)
Time management School of Rock.
Calendar of 2012 ESL Lesson on Months.
A Class Calendar in PowerPoint
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Sunday Monday Tuesday Wednesday Sunday Monday Tuesday Wednesday
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
Mrs. Nehring’s Teacher Planner
Ms. Murphy’s Classroom News
Schedules My Schedule Monday: 9:00-2:00 Work 3:00-6:00 Clean
Weekly Sight Words List 13.
Mrs. Nehring’s Teacher Planner
Mrs. Nehring’s Teacher Planner
Several Ad-Supported TV Shows & Sports “Own” Specific
Monday Top half Evaluate the expression with p = 20. 2(9 – 4p) – 6 172
Learning Activity Students Start On-time
4th Grade Daily Schedule 7:50 - 8:00 Arrive & Unpack
Welcome! May 9th, 2018 Wednesday
Unit 1: Quick Quizzes After 5,13
SEPTEMBER 2014 Unit 1 Unit 1 Unit 1 Unit 1 Quick Quiz 9,16, 21 Unit 1
SEPTEMBER ½ Day Unit PLC
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
January 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
| January Sunday Monday Tuesday Wednesday Thursday Friday
Swimming Pool Schedule
At Least Two-Thirds Of The Top 10 Trending Topics
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Contact
Daily Schedule Homeroom 4:10-4:15 Period One 4:15-4:51 (Social Studies) Period Two 4:55-5:31 (Planning Period) Period Three 5:35-6:01 (Social Studies)
Monday 5/8 How do the respiratory system and circulatory system work together to keep you alive?
NOVEMBER READING LOG Student: When you have read, record your minutes and have your parent initial the proper box (each day). At the end of the month,
Warm Up Thursday Find the vertex, axis of symmetry, Max/Min of
Journal: What has been the best part of creating your puppet show?
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
Bell Work Each Friday, students will be given a bell work quiz consisting of one question from each day’s bell work that week. On the following slides.
Welcome This school year is an exciting time for our seniors. Some resumed their college classes at Savannah State University on August 16, and have.
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
Open Bowling Times 9:30 pm – 12 Midnight Moonrock
Specials Calendar Time Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
By Cecil Williams.
Presentation transcript:

DECam Filter/Shutter Installation and Filters Installation Alistair Walker Internal Review August 9 2012

Internal Review August 9 2012 From August 20… We commence prime focus cage build-up, including installation of the Imager, and test that it all works. This is called “Commissioning Phase I” and ends with Technical First Light. Nominally this is September 28, but we hope to be earlier. The task list can be summarized as: Install the Filter Control Module and the Shutter (together) Install the six filters and the two filter mass models Install the BCams, install the DECal system etc on the top ring Install the Imager Run full system tests Internal Review August 9 2012

Filter/Shutter unit, & Filters We need to position the telescope in the N position, so that the in-out axis is horizontal This is not so easy The filters are installed from both sides (i.e. four from one side, then four from the other) The filters cost $500,000 and (now) typically take ~ a year to procure (from Asahi) In the future we may have more than 8 filters We need to service the mechanisms annually Internal Review August 9 2012

Internal Review August 9 2012 Work Schedule Aug 20 Monday: i) telescope at NW platform (ii) attach filter control boxes and filter-changer covers to the barrel (iii)Bolt shutter to filter-changer (on C floor, need crane] (iv) Install F-S installation hardware at N platform or else do first thing Tuesday. Scissor Lift arrives. Aug 21 Tuesday: (i)Install the F-C & shutter need crane plus lift access both sides, ref doc 5428, (ii) Remove installation hardware (TCS tests possible - night) Aug 22 Wednesday: Telescope at N platform, install 2 dummy filters and 2 real filters. (TCS tests possible- night) Aug 23 Thursday: Install remaining 4 filters telescope at N platform, see 4786, re-balance. If time, move to NW platform and start hookup (see Monday). (TCS tests possible - night) Aug 24 Friday: BCams/ (i) telescope at NW platform (ii) install lower BCams near primary mirror(iii) Attach upper BCams to filter-changer covers and align with lower BCams, (iv) test BCams with SISPI ref doc 6232 (v) Aug 25, 26: Contingency Aug 27 Monday: Hook up and test FC and shutter at NW platform. That would need power, compressed air and Ethernet and so might have to wait until the Imager is installed and its utilities completed. (TCS tests possible - night) Internal Review August 9 2012