National Laboratory Association

Slides:



Advertisements
Similar presentations
Fuquay Varina, North Carolina 27526
Advertisements

1 US Investigator Meeting DIAS-4, Chicago, July 2011 Good Clinical Practice (GCP) for Investigators and the Research Team.
Anne Sholander, MT(ASCP), International QA/QC Coordinator, SMILE
Background Presenters Work done in preparation for WHS changes
Checking & Corrective Action
1. (c) Alan Rowley Associates Laboratory Accreditation Dr Alan G Rowley Quality Policy based on Quality Objectives Quality Management System Communicate.
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
ISO Culture SHOQ Quiz 1. This program must be run in MS PowerPoint and requires sound. 2. Click “View” and then “Slide Show”. 3. Click “Continue”
Twinning Project RO2006/IB/EN/09 1 Saxony-Anhalt State Environmental Protection Agency Wolfgang GarcheBukarest Wolfgang Garche Saxony-Anhalt.
World Health Organization
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Dr Samah Kotb Lecturer of Biochemistry 1 CLS 432 Dr. Samah Kotb Nasr El-deen Biochemistry Clinical practice CLS 432 Dr. Samah Kotb Nasr.
Calibration (Qualification) of Centrifuge
Hazard Analysis and Critical Control Points
Quality Assurance/Quality Control Policy
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Technical requirements  Sampling  Analysis  Reporting of the results.
5.2 Personnel Use competent staff Supervise as necessary
Instructions and forms
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
NVLAP Overview and Accreditation Process March 2006.
Lecture 7 Analytical Quality Control
World Health Organization
Approach of a UK auditor Paul Mudway Mudway Health, Safety & Environment.
Ensuring of Traceability
Introduction to ISO New and modified requirements.
IB Internal Assessment Design. Designing an Experiment Formulate a research question. Read the background theory. Decide on the equipment you will need.
VALIDATION METHODOLOGY
Calibration Savvy. Calibration and Conformance  Calibration: Check a measurement against a known universally recognized standard to determine any deviation.
The Development of Accreditation in the UK Paul Mudway Mudway Health, Safety & Environment.
Conformity Assessment and Accreditation Mike Peet Chief Executive Officer South African National Accreditation System.
Quality Control Lecture 5
SANAS ACCREDITATION DEES DHANRAJ BEE Lead Assessor.
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheBukarest National Reference Laboratory for Air.
SAAMF Roadshow Durban CSIR NML Eddie Tarnow Metrologist: Torque & Automotive 14 June 2006 ISO/TS 16949:2002 certification – Meeting the requirements of.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Biochemistry Clinical practice CLS 432 Dr. Samah Kotb Lecturer of Biochemistry 2015 Introduction to Quality Control.
Validation Defination Establishing documentary evidence which provides a high degree of assurance that specification process will consistently produce.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Technical Services.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
2016 MFRPS: Changes To Standard 10 Guy F. Delius, R. S. CSO Food and Drug Administration Office Of Partnerships Standards Implementation Staff February.
© A2LA Understanding the Accreditation Hierarchy - Who’s Who and What’s What ? NCSL International Conference Orlando, FL August 7, 2008 by Roxanne.
Visit us at E mail: Tele:
QUALITY REQUIREMENTS FOR OFFICIAL FOOD LABORATORIES WITHIN EURL AND NRL (LABORATORY NETWORKS IN EUROPE) dr. Tina Pirš, dr. vet. med. Quality Manager, Veterinary.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
Table 1. The Five Medical Laboratory Case Studies Jan Martin et al. Transnational Evaluation of a New Continuing Professional Development Activity for.
Overview of Instrument Calibration Presents by NCQC, India.
CSIR National Metrology Laboratory Your measurement technology partner for global competitiveness.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
BSB Biomanufacturing CHAPTER 4 GMP – Documentation Part I (SOP)
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
ISO/IEC
BEE PROGRAM PRESENTATION
SANAS in the 2008 National Framework Amendment
Monitoring aspects of permits and inspections (1)
Jim Munro Chairman IECEx Panel of Assessors
In-Situ Filter Testing
Inspection and Testing
An Introduction to Quality Assurance in Analytical Science
Technical requirements:
METHOD VALIDATION: AN ESSENTIAL COMPONENT OF THE MEASUREMENT PROCESS
Calibration in the Ambient Air Quality Monitoring Network
Americas Aerospace Quality Group
Training Module Presented by Steve Wright
Operationalizing Export Certification and Regionalization Programmes
Preparing for a Stack Test
EN ISO September 2016 Confidential Restricted Public Internal
Denis Ward American TCB
Presentation transcript:

National Laboratory Association Test and Measurements 31 July – 1 August 2017

National Laboratory Association 31 July -1 August 2017 Interlaboratory Comparison of Stack Particulate Matter Measurements National Laboratory Association 31 July -1 August 2017

Scope: Participation Criteria This procedure is relevant to key network personnel directly associated with compliance to the ISO 17025 for stack testing Where two or more participating test measuring teams, use there own equipment and personnel to implement iso kinetic dust sampling on the same stack at the same time The purpose of the ILC testing is to evaluate the technical ability of the laboratory, using the same sample matrix and appropriate sample designs Use of USEPA method 5 or 17, for this presentation method 17 will be used as reference

Introduction This procedure is used to ensure that all the Stack Testing teams operate in accordance with ISO 17025 requirements, providing reliable iso kinetic dust emission results. This interlaboratory comparison has not yet been implemented, in South Africa at any site by any stack testing team. It is hoped that by using this procedure it will provide a bench mark to start such a comparison activity. After implementing the procedure it is possible that changes will have to be made to ensure its practical use It will be a requirement for all stack testing laboratories that carry out compliance sampling for the authorities to have ISO17025 accreditation by 2018, reference document SANAS R80-02

Preparation A presite visit should be done to ensure the suitability of the sampling site, access to points, availability of power supply, sample ports large enough for lances. Ensure that testing teams have completed their safety induction training and medical surveillance as would be required by the plant on which the testing will take place. Ensure online dust emission analyser has been calibrated, using IKS , these results will be the reference data for comparison of ILC testing between laboratories Determine what type of filter will be used either Glass fibre or Quartz fibre Sample filters to be prepared by a single laboratory for both testing teams. Before starting test run determine operation conditions of plant

Required Equipment Sampling train, with connection for nozzle, filter housing Suction tubing between sample probe and control unit Condenser for moisture capture Flow regulating valve Vacuum pump Rotameter Gas analysers to determine oxygen concentration of stack gas Log sheet to record test run readings

Measurement Protocol Hoist sampling equipment up to platform from which the sample ports to the stack can be accessed Prepare sampling train and ensure suitable power supply Remove blank plates from sample ports, verify direction of flow in stack Measure temperature of stack gases, compare results, should be similar if not, investigate reason for error Travis the stack diameters with pitot tube to determine velocity across ducting, compare results, if not similar then investigate reason for error (this itself could be used as an ILC, between the testing teams Calculate required size of sample probe nozzle, attach to sample probe

Place filter in sample trains filter holder, record filter reference number Insert sample train into stack, ensure nozzle pointing in correct direction of emission flow Once both testing teams are ready start sampling run over a period of 60 min IKS sampling conditions should be logged in check sheets Repeat test on 3 consecutive runs, store filters in clearly marked holders Remove sample train from stack After each test run weigh and calculate moisture capture during sampling, this can be done on site and results can be compared between teams, results should be similar (an additional type of ILC)

Reporting of Results: Indication of performance of individual participants Sample filters are sent to selected laboratory for analysis Results in mg/nm3 are analysed and documented for each testing laboratory Testing teams discuss results and determines if difference between filters are within the accepted tolerance level Copy of calibration certificates: sample pump, pitot tube, temperature sensor

Performance Evaluation: Minimum Acceptance Criteria Evaluation can be based on the z Score or there can be a “Satisfactory Range “ of-2.0 to 2.0 Calculation of uncertainty of measurement Conclusion