Marco Andreini, Raul Fernandez Ortega, Richard Francis Morton

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

Design of Steel and Composite-Structures for Seismic Loading – Safety Requirements, Concepts and Methods – Prof. Dr.-Ing. Ekkehard Fehling, University.
Chapter-2 Parts of Steel Bridge.
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
2.2 STRUCTURAL ELEMENT BEAM
Workshop at Indian Institute of Science 9-13 August, 2010 Bangalore India Fire Safety Engineering & Structures in Fire Organisers:CS Manohar and Ananth.
Structural System Overview
Commercial Framing C D Prints Unit 13.
MNM Fatal Falling Material Accident Falling Material Accident August 17, 2012 (Florida) August 17, 2012 (Florida) Victim Recovered September 4,
FOUNDATIONS. Components Footings Trench Formed Keyway Stepped Fireplace.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
Structural Principles and Landscapes Over Structure GSD 6242 Ecologies, Techniques, Technologies IV Spring 2015Niall Kirkwood FASLA Alistair McIntosh FASLA.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH
Section 3 design of post-tensioned components for flexure Developed by the pTI EDC-130 Education Committee lead author: trey Hamilton, University of.
Connection Design.
Shear - Tensile - Compression Stresses Slip Ted 126 Spring 2007.
CE 303: Introduction to Construction
Damage Illustrations. Potential Bridge Damage Bridge Component / DamagePossible Cause Approach Slab or Pavement  Raised, lowered, cracked, or buckled.
Framed Building Structure Lectured By: Ms. Noorhidayah Sunarti 15/4/2010.
REINFORCED CONCRETE Reinforced concrete is a composite material which utilizes the concrete in resisting compression forces, and steel bars and/or.
INSPECTION OF PRESTRESSED CONCRETE ROAD BRIDGES BY ULTRASOUND 3D TOMOGRAPHER SYSTEM Eng. Guy Rapaport Infrastructure & Transport, Finland.
EDMS Nr /02/ tons, Platform – Q = daN, aprox. length to cover 4 m Cabling Groove – Q = 500 daN, aprox.
Reading Structural Drawings
Reinforced Concrete Design
1 HVACR116 – Trade Skills Structural Drawings. 2.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
The four basic types of structures are :
Claudia Pérez Laura Rendeiro
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
Experimental Investigation of Moment-Rotation Curves of End-Plate Connection using Sinusoidal Beam Steel Structures 2015-Dubai November 2015 Dr.
Framed Structures Luisana Hernández.
Calculations D. Smargianaki 29/04/2015 LBNF. Outline D. Smargianaki(CERN) 2 29/04/2015 Comparison between Single Beam & Beam with Spliced connections.
Kansas City Hyatt Regency Walkway Collapse By: Ian Thompson Stephen Conlon David Martin Laura Devane.
Preliminary FEA Results PH-DT Engineering Office, CERN 24/04/2015 Page 1 CERN, April 2015.
Leads Institute of Technology & Engineering Subject Code : Name Of Subject :Building Construction Name of Unit : Soil Foundation Topic : Bearing.
1 ROAD & BRIDGE RESEARCH INSTITUTE WARSAW Juliusz Cieśla ASSESSSMENT OF PRESTRESSING FORCE IN PRESTRESSED CONCRETE BRIDGE SPANS BY THE PROOF LOAD.
1 ROAD & BRIDGE RESEARCH INSTITUTE WARSAW Juliusz Cieśla ASSESSSMENT OF PRESTRESSING FORCE IN PRESTRESSED CONCRETE BRIDGE SPANS.
Technical Standards Branch Class B Bridge Inspection Course BIM Bridge Inspection and Maintenance Basic Structural Considerations INFRASTRUCTURE AND TRANSPORTATION.
6. Example of Fatigue Design ★ This was prepared to demonstrate how to apply “fatigue design” to real case. A designer should consider all design condition.
Index Temporary Works: No.Subject 1Timber Trenches 2Timber Scaffolding.
Chapter-2 Parts of Steel Bridge. contents Bearings Horizontal and transversal wind bracing Classification of bridges.
Some significant experiences of HSE unit support to structural safety problems at CERN
Investigation of the Effects of End Region Deterioration in Precast, Prestressed Concrete Bridge Girders Royce Floyd, Cameron Murray, Darion Mayhorn DONALD.
Introduction Bridge members must be able to carry the loads applied to them. This presentation considers: how loads are applied to members how bridge.
Introduction to composite construction of buildings
Introduction to Bridge INspection
Structural drawing.
Sample Problem 4.2 SOLUTION:
EARTHQUAKE RESISTANT DESIGN An Over View of the Subject
INSTALLATION SEQUENCE
Outline: Introduction: a ) General description of project b) Materials
BUILDING CONSTRUCTION 1
Extension SR1 WP3 Electrical installations
Chapter-2 Parts of Steel Bridges.
Structural Drawing Chapter 19.
Chapter 3 BENDING MEMBERS.
Physical-Model-Based Data Interpretation
Introduction to Structural Design
الســقالات 29 CFR CFR تشير الإحصائيات بأن أكثر من 3 مليون عامل يعملون فى السقالات كل عام. كذلك تشير الإحصائيات إلى إصابة ما يزيد عن.
CIVIL WORKS CONSTRUCTION TECHNOLOGY 2017/18
Sample Problem 4.2 SOLUTION:
Design Ribbed and Flat Slabs
BFC Structural Steel and Timber Design
CONNECTION Prepared by : Shamilah
Fire Resistance of Steel Structures
Introduction to Structural Design
Commercial Structural Framing Systems
The Bunker Steel Structure – Structural Analysis
Neutron guide Shielding Concept
Presentation transcript:

Marco Andreini, Raul Fernandez Ortega, Richard Francis Morton DGS/SEE - GS/SE Report on the preliminary inspections to the Raised floors of sps buildings Marco Andreini, Raul Fernandez Ortega, Richard Francis Morton EDMS No

Outline: Structural defects detected at BA1 that caused the failure of a part of the false floor Preliminary inspection at BA6 to detect the presence of similar defects and load patterns Plan for the inspections and the structural safety assessment before the YETS 2015/2016 EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

The Structural failure occurred at the false floor at BA1 (03/09/15) The structural failure occurred to the false floor located at the ground floor of the Building BA1 and supporting an electrical converter has been caused by the self-weight of such an equipment. The structure consisted in a steel frame grid, composed of H-profiles arranged in a single way and restrained to an adjoining concrete slab by means of an L profile. EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

BA1: Structural joint between the steel false floor and the concrete slab The L-profile has been anchored to the slab by bolts (diameter ~= 18 mm), having a total length of roughly 100 mm, located on the vertical web and, in some points, with additional plates welded upon the horizontal flange. EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

1 BA1: Description of the joint parts collapsed The failure has been generated by the loss of bearing capacity of the L-profile connection 1 The failure occurred in a low tensile strength of the concrete surrounding one of the bolts EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

2 BA1: Description of the joint parts collapsed The failure has been generated by the loss of bearing capacity of the L-profile connection 2 Rupture of the fillet weld between the additional steel plate and the horizontal flange of the L profile EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

BA1 Comparison with existing drawings There is a perfect matching with the details from the drawings of the original structural project. Bad design or excessive load? EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

Reinforcing intervention was carried out (by whom Reinforcing intervention was carried out (by whom?) in the past (before Sep, 3rd) ? EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

Are there any other similar situations in the SPS buildings (BAs)? Issue rised Are there any other similar situations in the SPS buildings (BAs)? EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

! BA6 – BA1 Comparison with existing drawings Same structural detail EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

BA6 Inspection: Comparison with the load pattern of BA1 What we understood: We have the same load severity in BA1 and BA6! The limit 500 kg/m2 indicated is WRONG! BA6 EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

Perfect matching between the drawings and the real joint connection BA6 Inspection: Comparison with existing drawings Perfect matching between the drawings and the real joint connection EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

SAME detail + SAME load = SAME failure BA6 Inspection: Comparison with the structural details of BA1 BA1 BA6 SAME detail + SAME load = SAME failure ?! EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

BA6: Moving materials and equipment strategy Moving by Pallet truck (Transpalette) allowed due to the presence of additional bridging joists BA6 Moving by Crane (Pallet truck “Transpalette” forbidden) EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

Actions Plan for the inspections and the structural safety assessment before the YETS 2015/2016 EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

Actions: Results to be obtained before the YETS 2015/2016 Investigation of the existing status Original drawings of the steel frames; Map of the load patterns applied on the raised floors. Description of the status of the structural elements. Results of the inspections; Structural safety assessment of the steel frames Map of the false floors indicating: accessible, accessible with (temporary) measures/interventions, not accessible areas without further investigation. Plan of interventions for dangerous situations. EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

Actions: role of the various working units GS-SE (Synaxis): Etudes de la structure métalliques des faux plancher et plans d’exécution. HSE: Contrôle et validation des notes de calculs. GS-SE (Synaxis): Plans d’atelier. EN-MEF: Réalisation- exécution des travaux. Plan of inspections (should be…) BA3-(26-11-2015) - Done BA5-(30-11-2015) - Done BA7-(30-11-2015) - Done BA1-(4-12-2015) - Done BA2-(4-12-2015) BA6-(8-12-2015) BA4-(8-12-2015) EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

Preliminary results of the inspections: BA3 EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

Preliminary results of the inspections: BA5 Pillar EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

Preliminary results of the inspections: BA7 Additional elements (beams and pillars) are present herein. Pillars Beam Pillar EDMS No Report on the preliminary inspections to the raised floors of SPS buildings

The load severity of BA1 is similar to all the BAs Conclusions The structural detail failed at BA1 seems to be recurrent even in almost all the BAs The load severity of BA1 is similar to all the BAs Some shoring intervention are required to allow the maintenance of the electrical component underneath some areas of the raised floor at BAs A plan for the access underneath the raised floors of the BAs will be drawn before the YETS Materials and equipment movements at BA6 are allowed using pallet trucks and crane in selected areas EDMS No Report on the preliminary inspections to the raised floors of SPS buildings