Transmission Workgroup 4th October 2012

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Industry Dialogue on xoserve Services 14 th September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Transitional Exit Capacity Proposals -Update
Exit Capacity Release Methodology Statement
Modification Proposal 0283 Update
Transmission Planning Code – Draft Document
Exit Capacity User Commitment – Transmission Workstream update
RIIO-GD1:network charging volatility
Transmission Planning Code
Introduction of Code Contingency Guidelines Document
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Capacity Methodology Statements
UNC Mod 273 – Governance of Feasibility Studies
Mod 0452 (PARCA) – Further thoughts
PARCA Security and Termination Amounts
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
Transmission Workgroup June 7th 2012
Draft Capacity & Connection Plan
Update on Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
Transmission Planning Code Review
QSEC auction timetable
Mod 0621 Amendments to Gas Transmission Charging Regime
Modification 501 slides for Workgroup
Long Term Non Firm Capacity Update
Introduction of Code Contingency Guidelines Document
PARCA Timeline.
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
Mark Freeman 29th January 2007
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
Generic Revenue Driver Methodology
Ofgem presentation to Gas Transmission Workstream
User Pays Principles and Governance
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream 4th December 2008
Revised Tender Timescale for DN Interruption Arrangements
Presentation transcript:

Transmission Workgroup 4th October 2012 Update on NGG’s response to Ofgem’s IPs relating to the provision of incremental capacity Transmission Workgroup 4th October 2012

Background Ofgem issued its Initial Proposals (IPs) for the price control settlement to apply for RIIO-T1 period on 27 July 2012 NGG responded to the consultation on 21 September 2012 and highlighted a number of concerns regarding details within the IPs, particularly around the proposals relating to the provision of incremental capacity In order to enable drafting of the licence changes needed for implementation on 1 April 2013, it is important that there is agreement regarding the proposed way forward We want to ensure that Users are aware of the changes being proposed and have included the main points in the following slides

Main points raised – Concerns around the process Within the IPs, Ofgem did not comment on details of NGG’s business plan, but we believe that it is essential that guidance regarding the proposed regulatory changes is provided in order to ensure the efficient development of the commercial regime. We welcome confirmation that Ofgem will be actively involved in changes to the commercial framework We continue to believe that most of our business plan proposals could be implemented without changes being needed to the commercial regime: The change to the obligated lead-time is the only one which could not be included without a specific change

Main points raised – Setting of revenue drivers IPs was not clear regarding the timing or means of how the revenue drivers would be set We have sought further clarity from Ofgem regarding their proposals. Our current understanding is that: Revenue drivers should be in place in the licence in a timely manner to ensure that anyone wishing to bid for incremental capacity can do so We proposed using a Generic Revenue Driver Methodology (GRDM) to determine the appropriate allowances Ofgem supports this proposal in principle, but wants a contingency in case it is not in place for the start of the RIIO-T1 period Licence can be drafted to use this if consulted on and agreed in time, but would also need to ensure that provisions are made if not We need to ensure all Users are aware of our proposed approach, so that we determine appropriate allowances for all Users’ incremental capacity requirements

Main points raised – Funding arrangements Additional revenue associated with the provision of incremental capacity will be provided via the application of the Price Control Financial Model (proposed for November in each year) 20% of a calculated revenue allowance adjustment will be made in year T-2 (where T is the year of capacity delivery) and 80% in year T-1 This will be split 90% ‘slow’ money Added to the RAV and provided over 45 year asset lifetime And 10% ‘fast’ money As an allowance within that formula year Hence generality of Users will start to fund incremental capacity before the connecting party pays any capacity charges (via the TO price control) But when that party connects, other Users’ charges should be lowered

Process going forwards Within Annex B to our May 2012 SO External incentives submission, we included a draft of the Generic Revenue Driver Methodology We plan to issue this for consultation with Industry parties in the near future, so that it can be in place for the start of the RIIO-T1 period As was the case for the initialisation of revised Exit arrangements (post Mod 0195AV), we will write to all Users to ask that they contact us to let us know as soon as possible if they intend to bid for incremental capacity: Particularly for the July 2013 Application Window But also for the March 2014 QSEC Or for capacity at any New NTS Exit Point or New ASEP