LAT Requirements Verification in TVAC

Slides:



Advertisements
Similar presentations
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
Advertisements

Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
LAT-PR Section 44-1 GLAST LAT ProjectMechanical Design Integration Peer Review, March 2003 Mechanical Design Integration Peer Review, March 2003.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
STARLight PDR 3 Oct ‘01 G.1.1 Rashid STARLight STARLight Thermal Tahir Rashid STARLight Mechanical Engineer (734)
Thermal Modeling of the CX Satellite Jacob Boettcher Thermal Team Lead 4/5/02.
Thermal Energy Chapter 14. Key Ideas  What does temperature have to do with energy?  What makes things feel hot or cold?  What affects the rate that.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Blackbody Controller 9 March 2004 Scott Ellington
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Presenter1 Thermal Control R.Eby Impact Boom Stowed and Deployed SWEA STE Magnetometer Bob.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectThermal-Vacuum STE Status Review, September LAT Environmental Test Planning 7-8 September 2005 LAT Thermal-Vacuum Test Plans LAT.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
LAT TVAC Test Delta-PDR1 GLAST LAT Project25 May 2005 LAT Environmental Test Planning and Design Delta-Preliminary Design Review 25 May 2005 LAT T-Vac.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section 4.4 Heat Pipe Design and Analysis1 GLAST Large Area Telescope: Mechanical.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Prat CNRS/IN2P3-LLR Ecole Polytechnique GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Proprietary BalloonWinds Update Author: Ivan Dors – UNH Presented By: Michael Dehring -- MAC 28 June 2006.
Thermal Subsystem Peer Review Objective: To maintain all components of the space craft within their specific temperature range.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
1-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Ship Review November 19, 2012 STATIC Thermal Status Millan F. Diaz-Aguado Mars Atmosphere.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
Spacecraft Level Testing and Verification Part 3 1.
Heat. Nature of Heat Heat is the transfer of energy (every in transit) from one body to another due to the temperature difference between the two bodies.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
LAT EMI Test LAT test levels derived from LAT-SS-0778 Use CAL EMI test procedure as template –LAT-PS Test Suite: –CE102 Conducted Emissions, Power.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Atmospheric Heating.
Rose Navarro HMI Lead Thermal Engineer
FIELDS MEP Thermal Vacuum Cycling iPER
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Gayle K. Martin November 14, 2016
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
SPP FIELDS V1234 Thermal PSR
GLAST Large Area Telescope:
GLAST Large Area Telescope:
FIELDS SCM Thermal iPER
Thermal Control In spacecraft design, the Thermal Control System (TCS) has the function to keep all the spacecraft parts within acceptable temperature.
Jason Link University of Hawaii
University of California, Berkeley
GLAST Large Area Telescope
Electrical Ground Support Equipment Verification Test Support
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
Thermal Vacuum Test: Plans and Procedures
Atmospheric Heating Chapter 15 section 2
Section 2 Atmospheric Heating.
Integration and Test Organization Chart
Air & The Atmosphere What is the atmosphere?
Environmental Test Planning Meeting
LAT Thermal Systems Analysis
Integration and Test Organization Chart
Introduction and Overview
Design Integration and Analysis
GLAST Large Area Telescope:
Presentation transcript:

LAT Requirements Verification in TVAC LAT Mission Thermal Requirements are provided in four documents: 433-MAR-0001, “Mission Assurance Requirements”, Sections 4.6, 10.4 LAT-SS-00778, “LAT Environmental Specification”, Section 11.1,2,3 LAT-MD-00408, “LAT Program Instrument Performance Verification Plan”, Sections 5, 7.1.1.8 LAT-SS-00010-02, “LAT Performance Specification – Level II (B)”, Section 5.3.11.1,2 Requirements verification by individual test is summarized in Test Segment Chart and detailed in the LAT TVAC Test Plan.

LAT Requirements Verification LAT Thermal Environmental Parameter Surv. Cold-Case Nom Hot-Case Units Source Earth IR on any exposed surface 208 265 W/m2 IRD 3.2.3.5, Table 3-3 Earth Albedo on any exposed surfaces 0.25 0.4   Solar Flux on surfaces exposed to +X direction 1286 1419 Solar flux due to 1 deg glancing view of the sun on +/- Y surfaces 6 SPS 3.4.5.1 Orbit-average absorbed solar flux on one Radiator due to re-pointing 27 W

LAT Requirements Verification LAT Environmental Test Loads and Durations

LAT Thermal Vacuum Testing Timeline

Thermal Vacuum Test Segments Individual Test Segments are Conducted in the Following Order According to LAT Document [TBD] “LAT TVAC Test Procedures” Chamber Pump Down Bakeout Hot Operational Thermal Balance Hot Operational Thermal Control System Hot Operational Peak Power Hot Performance Cold Survival Thermal Balance Cold Performance Cold Operational Thermal Balance Cold Operational Thermal Control System Thermal Cycling Chamber Recovery During and between certain above tests, LAT electrical performance tests will be conducted according to the LAT “Electrical Performance Test Procedure"

Chamber Pump Down Electrical Performance Tests, chamber door open. Pump down according to NRL procedures to <1.E-05 Torr Activate LAT power buses, but LAT is powered OFF. Chamber shroud cool down according to NRL procedures. Adjust simulated environmental temperature hardware to maintain LAT assembly between 20 and 40 degC.

Bakeout Adjust simulated environmental temperature hardware to maintain LAT assembly at 45 degC Monitor out-gassing with Thermal Quartz Crystal Microbalance (TQCM) according to the LAT Contamination Control Plan Duration of bakeout according to TQCM criteria in LAT Contamination Control Plan

Hot Operational Thermal Balance Simulated environmental temperature hardware adjusted to provide hot case end-of-life (EOL) environmental heat loads. Thermal balance is attained when there is less than a 5% energy imbalance in the LAT instrument. The RIT is expected to stabilize below +15 degC without TCS control. Science verification and calibration tests are performed (power dissipation is unaltered). Thermal data used to correlate the LAT systems level Thermal Math Model, which provides flight temperature predictions.

Hot Operational Thermal Control System Hot TCS Testing consists of three tests: RIT control using primary reservoir heaters and symmetric orbit average load. Only primary reservoir heaters enabled (redundant heaters are controlled by B-side SIU, so this is standard). Primary and redundant radiator survival (antifreeze) heaters are enabled, but are expected to remain off. RIT initial set point same as that achieved previously in hot operational thermal balance. Demonstrate RIT control by incrementally increasing RIT set point to +15 degC and then lowering back to original level. Peak power. Increase LAT power to peak levels (706W) for 10 minutes or until a steady state has been achieved at the discrition of the thermal engineer. Monitor LAT temperatures to assure they remain within limits RIT control using redundant reservoir heaters at nominal power with transient environmental loading Configure LAT with only redundant reservoir heaters enabled. Control radiator simulated environmental temperature hardware to follow hot case temperature profiles. Demonstrate RIT control by incrementally increasing RIT set point to +15 degC and then lowering back to original set level. Verify ability of TCS to maintain RIT stable within +/- 7 degC under transient environmental radiator loads.

Radiator Sink Transient Temperatures – Hot Case

Hot Performance Simulated environmental temperature hardware adjusted “until as many LAT temperatures as feasible are 10 degC above their predicted operating limits.” This will be the hot proto-qualification temperature limit. Thermal stability is attained when certain monitored temperatures* are within 3 degC [TBD] of target/goals. After LAT temperatures are stable, execute a LAT Power-On/Off/On sequence according to LAT Electrical Test Procedure. * Note: “Certain monitored temperatures” are a set of temperature sensors that represent the complete temperature distribution within the LAT.

Cold Survival Thermal Balance Simulated environmental temperature hardware adjusted to provide environment for cold survival case. Transition according to LAT TVAC Test Procedure. LAT is powered off after LPT. Primary and redundant survival (Grid and radiator) heater circuits are enabled. Primary and redundant reservoir heater circuits are enabled. After reaching primary set point temperature, the primary survival heaters will cycle and the redundant heaters will remain off since the redundant temperature set point is set below that of the primary Redundant reservoir heater is thermostatically controlled and will turn off when temperature increases above +15 degC. Primary heater will maintain reservoir at near +40 degC at 100% duty cycle. Thermal balance attained when there is less than a 5% energy imbalance in the LAT. RIT is expected to stabilize near - 6 degC. Following thermal balance, redundant Grid and radiator survival heater circuits are enabled and primary circuits are disabled, and environmental temperatures are decreased slightly until redundant thermostats engage the redundant heaters. EGSE must be designed for this function and also to override reservoir heater circuit enabling.

Cold Performance Simulated environmental temperature hardware is adjusted until “as many LAT temperatures as feasible are 10 degC below their predicted operating limits.” This will be the cold proto-qualification temperature limit. Not practical at cold end, since cold performance and operational limits are below cold survival limit. Thermal stability is attained when certain monitored temperatures [TBD] are within 3 degC [TBD] of target/goals. After LAT temperatures are stable, execute a LAT Power-On/Off/On sequence according to LAT Electrical Test Procedure.

Cold Operational Thermal Balance Simulated environmental temperature hardware adjusted to provide cold case beginning-of-life (BOL) environmental heat loads. Thermal balance is attained when there is less than a 5% energy imbalance in the LAT instrument. The RIT is expected to stabilize below -10 degC without TCS control. Science verification and calibration tests are performed (power dissipation is unaltered) Thermal data used to correlate the LAT systems level Thermal Math Model, which provides flight temperature predictions.

Cold Operational Thermal Control System Cold TCS Testing consists of three tests: RIT control using primary reservoir heaters and symmetric orbit average load. Only primary reservoir heaters enabled (redundant heaters are controlled by B-side SIU, so this is standard). Primary and redundant radiator survival (antifreeze) heaters are enabled, but are expected to remain off. RIT initial set point same as that achieved previously in cold operational thermal balance. Incrementally increase RIT set point to +15 degC and then lower back to original level. RIT control using redundant reservoir heaters at nominal power with transient environmental loading Configure LAT with only redundant reservoir heater enabled. Control radiator simulated environmental temperature hardware to follow cold case temperature profiles. Demonstrate RIT control by incrementally increasing RIT set point to +15 degC and then lowering back to original set point. Verify ability of TCS to maintain RIT stable within +/- 7 degC under transient environmental loads. TCS Parameter Upload. Enabling antifreeze protection at higher temperatures. Changing reservoir heater control band. Disabling an individual VCHP. Rejection of impossible or conflicting parameters.

Radiator Sink Transient Temperatures

Thermal Cycling A total of four thermal cycles will be performed consisting of four hot plateau four cold plateau eight transitions At each plateau, electrical performance testing according to timeline and LAT Electrical Test Procedure

Chamber Recovery Chamber recovery according to NRL Procedures Return to ambient temperature simulated environmental temperature hardware adjusted to maintain LAT assembly between 22 and 30 degC. RIT set point temperature adjusted accordingly. when ambient temperature achieved, LAT is powered off and power circuits disabled. all GSE power circuits disabled. Return to ambient pressure Check room humidity to be in proper range before opening vacuum chamber door.

LAT TVAC Test Segments

TVAC LAT Cool Down Comparison Cool Down Scenarios During LAT TVAC Cycling

Simulated Environmental Temperature – Cal Rod Concept “Picture Frame” baffles; polished aluminum with holes for Cal Rod sockets Height of ACD Height of radiator 6” 6” – 8” Support structure, low e with heaters or blanketed; 15” – 20” from radiator Width of radiator

LAT TVAC Personnel Requirements Category Description Test Conductor (alternate between Cat 2 and Cat 4 or 5) Thermal Engineer Chamber/Facility Engineer LAT Operations/Systems Engineer LAT Electrical/Performance Scientist LAT Software Engineer Subsystem Specialist, ACD Subsystem Specialist, TKR Subsystem Specialist, CAL Subsystem Specialist, E-Box/Cabling 30 day test x 3 shifts/day = 90 shifts Cat 1 – 3: all shifts Cat 4: all shifts initially, part time during cycling Cat 5: all shifts initially, then as necessary, always during electrical performance tests Cat 6: all shifts initially, then as necessary Cat 7 – 10: all shifts initially, then during electrical performance tests Estimated total effort: 400 shifts x 8 hr/shift = 3200 hrs