WP11: electron and proton beam testing

Slides:



Advertisements
Similar presentations
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Advertisements

ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
AS Diagnostic Collaboration Mark Boland
AWAKE electron source New Electron Source WP at CERN
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Beam Diagnostics Collaboration Meeting March 18 th 2015 at Australian Synchrotron Mario Ferianis – Elettra.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Alexander Aleksandrov Oak Ridge National Laboratory
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
1 ALICE and EMMA Yuri Saveliev … and many others at DL and beyond ASTeC, STFC Daresbury Laboratory IOP Particle Accelerators and Beams Annual Conference.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
People Xavier Stragier Marnix van der Wiel (AccTec) Willem op ‘t Root Jom Luiten Walter van Dijk Seth Brussaard Walter Knulst (TUDelft) Fred Kiewiet Eddy.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
Development of High Brightness Electron Photoinjectors at ASTeC B.L. Militsyn Accelerator Science and Technology Centre Science & Technology Facility Council,
CALIFES A proposed electron beam test facility at CERN
Dielectric Wakefield R&D programme at Daresbury Lab.
Phil Oxford , june 18 Photoinjector at.
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
WP13: Access to Plasma Beam testing facilities
Linac4 M. Vretenar for the Linac4 design team
Status of the MAX IV Short Pulse Facility
Sara Thorin, MAX IV Laboratory
UK-XFEL WP1 – Electron Injector Development
Uppsala Commitment to ESS and FREIA Planning
Status and Interest of the X-ray FEL SINAP
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Have a chance to operate your own beam at CERN
Accelerators in a new light
Tango status at Elettra
DC Injector and Space Charge Simulation Status
Paul Scherrer Institut
Conveners: L.Serafini,F. Villa
Superbeams with SPL at CERN
ADS Accelerator Program in China
Performance Degradation cERL Injector Cryomodule
Electron Source Configuration
Progress towards Pulsed Multi-MW CERN Proton Drivers
Status of the CLIC Injector studies
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Advanced Research Electron Accelerator Laboratory
Brief Introduction to (VUV/)Soft X-ray FELs
Instability measurement plans at ATF
Compact linear accelerator FLUTE: status update
Explanation of the Basic Principles and Goals
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
CLIC Feasibility Demonstration at CTF3
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
The SPL-based Proton Driver at CERN
Diagnostics RF and Feedback
(Beam) Commissioning Plan
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
J. Seeman Perugia Super-B Meeting June 2009
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Presentation transcript:

WP11: electron and proton beam testing ARIES kickoff meeting, CERN 4-5 May 2017 J. Schwindling / CEA Saclay

WP11: electron and proton beam testing Goal of WP11 Testing of instrumentation, beam optics, RF equipment, accelerator components with low-medium energy proton and electron beams Also synchrotron radiation, RF, neutrons 5 installations: ANKA, FLUTE, IPHI, SINBAD, VELA WP11: electron and proton beam testing

Test Facility ANKA at KIT KIT Synchrotron Circumference: 110.4 m Energy range: 0.5 - 2.5 GeV Beam current up to 200 mA RMS bunch length: 45 ps (for 2.5 GeV), down to a few ps (for 1.3 GeV) ANKA has been in operation for more than 15 years 2016-01-01 Foundation of the KIT Institute for Beam Physics and Technology 2016: IBPT operated the storage ring 3200 hours IBPT has dual mission promote cutting-edge accelerator research supply synchrotron radiation for users at KIT and collaborating partners WP11: electron and proton beam testing

ANKA in ARIES Give access to: 8 beam periods 2.5 days + preparation Electrons at the accelerator Synchrotron radiation 8 beam periods 2.5 days + preparation 24 hours / day Fast –gated intensified camera 2.7 MHz, sub-ps Electro-optical Monitor BMBF-Verbund Speaker A.-S. Müller, 2016 - 2019 05K16VKA Fast ps THz detectors Coating studies www.ibpt.kit.edu/anka Examples of devices / studies WP11: electron and proton beam testing

Test Facility FLUTE at KIT FLUTE (Ferninfrarot Linac- Und Test-Experiment) Test facility for accelerator physics Experiments with THz radiation Bunch compressor THz Gun Linac Laser running, e gun and first diagnostic section for 7 MeV assembled First experiment autumn 2017 www.ibpt.kit.edu/flute WP11: electron and proton beam testing

WP11: electron and proton beam testing FLUTE in ARIES Serve as a test bench for new beam diagnostic methods and tools Develop single shot fs diagnostics Synchronization on a femtosecond level Systematic bunch compression studies Generate intense THz radiation Compare different coherent THz radiation generation schemes in simulation and experiment Laser beam Gun Linac Laser lab Chicane 15 Meter Topview FLUTE hall THz lab Klystron 8 beam periods 5 days + preparation 8 hours / day WP11: electron and proton beam testing

WP11: electron and proton beam testing IPHI at CEA Saclay The High Intensity Proton Injector was built and is being commissioned at CEA Saclay through a CEA – CERN – IN2P3 collaboration Design performances are 3 MeV – 100 mA – CW proton beam (300 kW) First beam accelerated in Spring 2016 at low duty cycle (~ 1.5 kW) Power will be increased gradually in S2 2017 beam SILHI source 95 keV 100 mA RFQ Diagnostic lines The IPHI RFQ WP11: electron and proton beam testing

IPHI in ARIES IPHI will provide: Protons at 3 MeV, 1 mA to 100 mA, duty cycle 1 ms / 1 Hz to CW Access to 352 MHz RF platform (CW or pulsed, ~ 2 MW peak power) Neutrons (109 – 1010 n/s) 12 beam periods 5 days + preparation 8 hours / day Beam in IPHI in April 2016 Neutron production and moderation device @ IPHI in June 2016 WP11: electron and proton beam testing

WP11: electron and proton beam testing SINBAD at DESY, Hamburg A dedicate accelerator R&D facility currently under construction at DESY Reusing the old DORIS tunnel to set up multiple independent experiments E = 100 MeV, charge: 0.5 - 20 pC, bunch length: few fs, transverse norm. emittance < 0.5 mm*mrad, arrival time jitter stability < 10 fs RMS, rep-rate: < 50Hz Available: spring 2019 Old DORIS accelerator removed Building refurbished Beam line design frozen Infrastructure installations starting Procurement of RF-stations, beam line elements,... WP11: electron and proton beam testing

WP11: electron and proton beam testing SINBAD in ARIES TNA - access starting in spring 2019 Access will be granted to the normal conducting, S-band 100 MeV electron linac Available experimental space in default location: ca 3m wide length preferably < 4m 9 beam periods 5 days + preparation 14 hours / day WP11: electron and proton beam testing

WP11: electron and proton beam testing VELA at STFC Daresbury VELA = Versatile Electron Linear Accelerator S-Band photo-injector Up to 250 pC bunch charge 6 MeV beam energy (upgrade to 40 MeV in progress) 10 Hz repetition rate (upgrade to 100 Hz in progress) Copper photo-cathode driven by UV laser 1 mm profile FWHM at the cathode 10 MW klystron WP11: electron and proton beam testing

VELA in ARIES VELA has two experimental areas available: Beam Area One 2 metre long experimental vacuum chamber Quadrupole pair for capture post experimental region Faraday cup, YAG:Ce screens, non-invasive BPMs Beam Area Two Customer configurable bunker 14 beam periods 3 days 8 hours / day J F M A S O N D 2017   2018 2019 2020 2021 Not available Low availability High availability VELA/CLARA Jan 2017 Availability, subject to change WP11: electron and proton beam testing

WP11: electron and proton beam testing Final words All installations: provide local support for users need time to check experiment feasibility, safety issues… requests should be sent well in advance to the task leader and to jerome.schwindling@cea.fr A User Selection Panel is being setup Task Installation Location Task leader Beam periods In operation 11.1 ANKA KIT marcel.schuh@kit.edu 8 periods x 2.5 days x 24 h Yes 11.2 FLUTE 8 periods x 5 days x 8 h End 2017 11.3 IPHI CEA Saclay jerome.schwindling@cea.fr 12 periods x 5 days x 8 h 11.4 SINBAD DESY ulrich.dorda@desy.de 9 periods x 5 days x 14 h Spring 2019 11.5 VELA STFC Daresbury anthony.gleeson@stfc.ac.uk 14 periods x 3 days x 8 h WP11: electron and proton beam testing